Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-00424
StatusFinaled
Name MILLER CONSTRUCTION CORP
Site Address 2779 S LIBERTY RD
Project NameLIBERTY STREET OFFICE/SHOP
Customer Number 
ePlanReviewNo
Description
Liberty Street Office/Shop - To construct a new 7,700 square foot, one story office and shop building and related site improvements. The building is constructed of wood frame with masonry exterior walls at the shop portion of the building. Office, covered patio and entry 2,590 square feet; shop, mezzanine, and storage areas 5,110 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/15/200910/20/2009 DONE
Telephone call  10/16/2009 DONE
DetailsTisha Gallop
Received message from Jake Miller that he is working on final values.
Third Notice 9/11/200910/5/2009 DONE
Telephone call  9/17/2009 DONE
Details
jacob miller - ###-#### - called and said he is working on the final certificate of values and will get them completed and sent to us as quickly as he can
Third Notice 8/5/20099/11/2009 DONE
Second Notice 7/22/20098/5/2009 DONE
DetailsTisha Gallop
mailed
First Notice 3/2/20097/22/2009 DONE
BLD-Aging Inspection3/2/20093/2/20093/2/2009 PASS
DetailsTom Arcoraci
Issue PAID IN FULL permit  3/2/2009 DONE
DetailsBarbara Stitt
Permanent Occupancy UNPAID FEE  3/2/2009 DONE
DetailsBarbara Stitt
BLD-Final12/29/200812/29/200812/29/2008PPASS
DetailsTom Arcoraci
Jake Phone #: ###-####
PubWorks Occupancy Approval12/29/200812/29/200812/29/2008 DONE
DetailsTiffany Lowery
BLD-Final12/16/200812/17/200812/17/2008AFAIL
DetailsTom Arcoraci
jake Phone #: ###-#### cn posted
FIRE-Final Inspection12/16/200812/16/200812/16/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection12/11/200812/12/200812/12/2008AFAIL
DetailsTroy Cobbley
Provide building address, provide a tagged fire extinguisher for the mezzanine in the shop, remove the thumbturn from the main exit (keyed is ok), the southwest exit door is to have approved single action hardware as per the hardware schedule, remove the deadbolt from the shop door, provide the missing exit discharge light, provide emergency lighting as per the plans and provide annunciators and test the duct smoke detectors.
BLD-Aging Inspection12/3/200812/3/200812/3/2008 PASS
DetailsTom Arcoraci
Plan resubmittals received  10/20/2008  
DetailsJohn Menard
Rec'd one copy of sheet L-1; taken to John M
BLD-Energy code compliance9/17/20089/18/20089/18/2008PPASS
DetailsJim Sly
jake Phone #: ###-####
BLD-Framing/Rough-in9/15/20089/15/20089/15/2008PFAIL
DetailsJim Sly
jake Note: also calking Phone #: ###-####
C/N....Toilets 16-18 " from finished wall....Stiil need truss Eng. OK to insulate.
BLD-Framing/Rough-in9/12/20089/12/20089/12/2008AFAIL
DetailsMike Jordan
clack and seal also. Provide approved plans and truss engineering for framing insp. Job shack locked. No one on site could help.
BLD-Other9/11/20089/12/20089/12/2008ACANC
DetailsMike Jordan
Jake- seal Phone #: ###-####
BLD-Other8/4/20088/4/20088/4/2008PPASS
DetailsJim Storey
Jake- nail insp Phone #: ###-#### sheer walls and roof nailling ok
BLD-Other6/30/20087/1/20087/1/2008APASS
DetailsTom Arcoraci
jake Note: 8:00 am grout inspection for the block Phone #: ###-#### spec insp on site
BLD-Foundation6/3/20086/4/20086/4/2008APART
DetailsTom Arcoraci
jake Phone #: ###-####
BLD-Footing5/28/20085/29/20085/29/2008APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/28/2008 at 12:18:26 PM. Contact: ###-####. Perimeter footings, interior footings and column pad footings. Special inspector to note on report the missing #5 bars under girder truss bearings being installed prior to placement of conc. in this area.
(F) Reprint permit  5/14/2008  
Routing - PLAN CHECK5/12/2008 5/13/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  5/13/2008 PASS
Reviewed and approved structural and nonstructural revisions with red lined notes and attached comment list. JCM
Routing - PLUMBING5/13/2008 5/13/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK5/13/2008 5/13/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  5/13/2008 DONE
Print Occupancy Form  5/13/2008 DONE
Telephone call  5/13/2008 DONE
t/c w jake miller at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  5/13/2008 DONE
Issue PAID IN FULL permit  5/13/2008 DONE
CHANGE ISSUED DATE  5/13/2008 DONE
DetailsRita DeYoung
changed for Barb
Plan assigned to (JCM)3/11/2008 5/13/2008 PASS
DetailsJohn Menard
5/13/2008 11:41:44 JCM - activity updated through activity BLDA022 from case BLD08-00424.
Routing - PUBLIC WORKS5/2/2008 5/12/2008 PASS
DetailsBeverly Hall
Routing PW Drainage5/5/2008 5/9/2008 PASS
DetailsBrian Murphy
Plan resubmittals received  5/7/2008  
received transmittal from elkhorn & "1" sheet each of PO.2, P1.O P1.1-- plans taken back to Brian Murphy-- the person inserting Jake Miller from Miller Cont. per John Menard ok for him to insert plans
Routing - Erosion and Sediment5/1/2008 5/2/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00155
Routing - PLAN CHECK5/2/2008 5/2/2008  
DetailsJohn Menard
Plan resubmittals received  5/2/2008  
received from kaye investments llc letter (3 copies) , from briggs eng (11) pages with (3) sets each. Also grading plan GRD (3) sheets each, also (3) sets of plans with each sheet C, S-1, A-1, A-2, A-3, A-4, A-5, A-6, A-8, A-9-- plans taken back to John Menard--inserter is Brian McGowan
Plan resubmittals received  5/2/2008  
Received 1 cover transmittal, 3 copies of O & M manual, 2 copies of sheet GRD taken and attached to routing plans. Called Daniel Sullivan with Briggs and explained that a total of 5 sheets is required for resubmittals, that when they are resubmitting THEY need to insert the plans into our copies, and that better project identifing information. 5-2-08 @ 1:50pm BAS
Routing - PLAN CHECK4/25/2008 5/1/2008  
Telephone call  5/1/2008 DONE
DetailsScott Arellano
Received phone call from Paul Blomberg regarding quantities of flammable and/or combustible fluids storage within the proposed building. Mr. Blomberg is unable to provide the requested information due to the undetermined status of operations with the building. Mr. Blomberg states that he cannot determine how much, if any, hazardous materials or flammable or combustible fluids will be stored in the building at this time. Building plans are approved; with the agreement that any future flammable or combustible liquid storage will be reported to the Boise City fire department for review; and to assure maximum allowable quantities of such materials are in accordance with IFC chapter 27.
Routing - FIRE  5/1/2008 PASS
Attached updated IFC comments to plans
Routing - FIRE5/1/2008 5/1/2008 PASS
DetailsScott Arellano
Routing - FIRE4/22/2008 4/25/2008 FAIL
DetailsScott Arellano
Faxed resubmittal items to fax number on application.
1st review completed  4/25/2008 FAIL
Failed PW, ESC, Plumbing, Planning, Plan Check, Fire
Routing - PLAN CHECK4/8/2008 4/22/2008 FAIL
DetailsJohn Menard
Plan resubmittals requested  4/22/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the cover letter and plan review requesting revisions. JCM
Plan resubmittals requested  4/16/2008 DONE
Mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLANNING4/4/2008 4/8/2008 PASS
DetailsJosh Wilson
DRH07-00601 Josh Wilson
Routing - PLUMBING3/25/2008 4/4/2008 FAIL
DetailsBill VanDegrift
all hose bibs in the shop must be protected by an R.P.. a potable water outlet within 50' should be provided. RV dump stations require a 4", self closing, foot operated, ntight fitting hatch. provide required signage. WS-1 is not listed on the fixture schedule, I assume its a water softener, is the kitch/break room sink and hose bib system on the soft water system?
Plan resubmittals received  4/3/2008  
Received transmittal, two copies of Stormwater Pollution Prevention Checklist, and two copies of sheet SWP3; inserted by LEG and taken back to plumbing review
Routing PW Environmental3/25/2008 3/25/2008 PASS
DetailsWalt Baumgartner
Bus dump OK.
Routing - Erosion and Sediment3/24/2008 3/25/2008 FAIL
DetailsJames Rogers
Routing - PUBLIC WORKS3/12/2008 3/24/2008 FAIL
DetailsLouise Waldorf
Routing Off Site - STRUCTURAL3/11/2008 3/24/2008 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing PW Street Lights  3/24/2008 PASS
DetailsBill Colson
Routing PW Sewer Rating3/21/2008 3/24/2008 PASS
DetailsLouise Waldorf
Routing PW Sewer Design3/19/2008 3/24/2008 PASS
DetailsJon R. Gunnerson
Routing PW Environmental3/20/2008 3/20/2008 FAIL
DetailsWalt Baumgartner
Purpose, intent of use and control of outside drain identified as "bus dump" required. May be subject to pretreatment discharge control permit.
Walt Baumgartner, Pretreatment office PW, ###-####
Routing PW Solid Waste  3/20/2008 PASS
DetailsPeter J. McCullough
Ensure gates to enclosure open at least 120 degrees. This was noted in the DR application but not shown on plans.
Routing PW Drainage3/12/2008 3/18/2008 FAIL
DetailsBrian Murphy
REVISE O&M PLAN AND DRAINAGE INSPECTION NOTE ROOF? BRIAN MURPHY
Plan routing begun/NEW & ADDTN  3/12/2008 DONE
DetailsTisha Gallop
Routing - PLANNING Land Div3/12/2008 3/12/2008 PASS
DetailsDave Abo
Single tax parcel #R7334260602 for Lots 4 and 5, Block 2 of the Randall Acres Subdivision #14.
Plans ACCEPTED BY PLAN TECH  3/11/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/11/2008 DONE
DetailsTisha Gallop
Telephone call  3/11/2008 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Application received  3/10/2008  
DetailsDarla L Downs
Zoning Approval12/9/200812/9/2008   