Case Summary (BLD) | | | 10/19/2009 | | |
|
|
|
|
BLD-Final | 4/7/2009 | 4/8/2009 | 4/8/2009 | A | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
DOC - Permit Finaled | 4/8/2009 | 4/8/2009 | 4/8/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/31/2009 | 4/1/2009 | 4/1/2009 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-#### needs temp glass master bath needs elec and fire place finaled also
|
BLD-Grading Inspection | 3/30/2009 | 3/30/2009 | 3/30/2009 | A | DONE |
Terry Records
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-#### ok to insulate
|
BLD-Energy code compliance | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PART |
Dave Hannah
|
|
|
BOB Phone #: ###-#### ok to spray ceiling in kitchen and rim in basement along rad
|
BLD-Framing/Rough-in | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Jim Storey
|
|
|
Bob Phone #: ###-#### nailling ok need engineer to address 24 on center spacing of brace panel studs designed at 16 oc.
|
BLD-Conference | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PART |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
BLD-Foundation | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/13/2008 at 7:42:05 AM. Contact: ###-####.
|
BLD-Foundation | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/12/2008 at 6:01:44 PM. Contact: ###-####.
|
BLD-Footing | 5/9/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Dave Hannah
|
|
|
ben Phone #: ###-####
|
BLD-Foundation | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/21/2008 at 4:42:36 PM. Contact: ###-####. Basement walls only.
|
BLD-Footing | 4/14/2008 | 4/15/2008 | 4/15/2008 | P | PART |
Dave Hannah
|
|
|
ben Phone #: ###-#### ok to pour basement footings
|
PubWorks Subgrade Approval | 4/15/2008 | 4/15/2008 | 4/15/2008 | | PART |
Terry Records
|
|
|
subgrade approved for basement footings. Another approval will be required for the upper level footings
|
Issue PAID IN FULL permit | | | 3/27/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2008 | | DONE |
|
|
|
left message w jan for brian at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/24/2008 | | DONE |
|
|
|
|
Plan assigned to (BSP) | 3/18/2008 | 3/18/2008 | 3/21/2008 | | PASS |
Ben S. Pavelka
|
|
|
3/21/2008 11:06:15 BSP - activity updated through activity BLDA022 from case BLD08-00432.
|
Routing - PLAN CHECK | 3/17/2008 | | 3/21/2008 | | PASS |
Ben S. Pavelka
|
|
|
|
Telephone call | | | 3/21/2008 | | |
|
|
|
Called Brian Visser at ###-#### at 9:15 to discuss cable guard rail policy and options. He told me it would not be a cable guard rail. (BSP)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 3/20/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 3/18/2008 | | |
Ben S. Pavelka
|
|
|
|
Routing - FIRE | 3/13/2008 | | 3/17/2008 | | PASS |
Sam Rogers
|
|
|
This house shall be fitted with an NFPA 13D fire sprinkler system. (Morningside Heights Sub #2)
|
Routing - Erosion and Sediment | 3/12/2008 | | 3/13/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with the attached conditions. ESC08-00161.
|
Routing - PLANNING | 3/12/2008 | | 3/12/2008 | | PASS |
Lucinda Grames
|
|
|
|
Routing - PUBLIC WORKS | 3/11/2008 | | 3/12/2008 | | PASS |
Louise Waldorf
|
|
|
|
Application received | | | 3/11/2008 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/11/2008 | | 3/11/2008 | | PASS |
Terry Records
|
|
|
Approved as Category 3
|
Routing - Addressing | 3/11/2008 | | 3/11/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - FRONT DESK | | | | | |
|
|
|
|