Third Notice BLD | 3/3/2009 | 3/3/2009 | 3/31/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/29/2009 | 1/29/2009 | 3/3/2009 | | DONE |
Jim Toombs
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/16/2009 | 1/29/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/16/2009 | | DONE |
|
|
|
|
BLD-Final | 1/14/2009 | 1/14/2009 | 1/14/2009 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/14/2009 at 8:31:39 AM. Contact: ###-####. OK for Perm Occ.
|
Zoning Approval | 1/13/2009 | 1/13/2009 | 1/14/2009 | | PASS |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 1/8/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Troy Cobbley
|
|
|
life safety passed. Emergency lights were added in the beer cooler
|
BLD-Final | 1/8/2009 | 1/13/2009 | 1/13/2009 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/8/2009 at 3:40:17 PM. Contact: ###-####. Need code enforce/Zoning
|
FIRE-Final Inspection | 1/8/2009 | 1/9/2009 | 1/8/2009 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/8/2009 at 3:16:16 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2009 3:33PM.
|
BLD-Final | 1/8/2009 | 1/9/2009 | 1/8/2009 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/8/2009 at 3:16:54 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2009 3:33PM.
|
BLD-Final | 1/6/2009 | 1/8/2009 | 1/8/2009 | P | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/6/2009 at 1:58:08 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jan 8 2009 9:31AM.
|
BLD-Final | 12/1/2008 | 12/1/2008 | 12/1/2008 | A | NR |
Jim Sly
|
|
|
Mike phone ###-####
|
BLD-Framing/Rough-in | 9/22/2008 | 9/23/2008 | 9/23/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2008 at 10:01:11 PM. Contact: ###-####. Meat and bakery Dept Framing Ok
|
BLD-Framing/Rough-in | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/16/2008 at 11:51:26 PM. Contact: ###-####. Customer Service and Meat Dept. OK
|
BLD-Framing/Rough-in | 9/11/2008 | 9/12/2008 | 9/12/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 9:54:09 PM. Contact: ###-####. Partial at Bakery....Ceiling and soffit.....
|
BLD-Framing/Rough-in | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/20/2008 at 10:25:16 PM. Contact: ###-####. Soffit above new deli counter.....OK
|
BLD-Framing/Rough-in | 8/12/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/12/2008 at 10:45:38 PM. Contact: ###-####.
Soffit section above wine area.....OK but needs seismic resraint......check at final.
|
BLD-Framing/Rough-in | 7/23/2008 | 7/24/2008 | 7/24/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/23/2008 at 10:26:03 PM. Contact: ###-####. Deli and Pharmacy OK
|
Issue PAID IN FULL permit | | | 5/30/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 3/20/2008 | | 5/16/2008 | | PASS |
Tim L. Woodard
|
|
|
5/16/2008 10:20:36 TLW - activity updated through activity BLDA022 from case BLD08-00435.
|
Routing PW Sewer Rating | 3/20/2008 | | 5/16/2008 | | PASS |
Louise Waldorf
|
|
|
Rating sheet is scaned in and attatched to plans.
|
Routing - PLAN CHECK | 4/17/2008 | | 5/16/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/16/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/16/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/16/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2008 | | DONE |
|
|
|
left vm for tim sievers at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/16/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/12/2008 | | DONE |
|
|
|
received 1 plan correction letter,1 plan review report1 national cooler spec, 1 wine cooler sheet, 1 beer cooler sheet , and 3 copies of sheets 1.0,2.1A,2.1B,3.0A,3.6A,3.7A,3.9A,3.11,4.0A,4.0B,4.1A,5.0A,5.0B,5.0C,5.1,6.0A,6.0B,6.0C,6.1A,6.1B,6.2,7.0A,7.0B,7.1A,7.1B,7.1C,7.2A,7.2B,7.3A,7.3B,7.4A,7.4B,7.5,7.6A,7.6B,8.0A,8.0B taken to Tim W.
|
Routing - FIRE | 4/15/2008 | | 4/17/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 4/17/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 4/4/2008 | | 4/15/2008 | | FAIL |
Tim L. Woodard
|
|
|
Need cooler specs. See plan review report.
|
Plan Reviewer's activity | | | 4/15/2008 | | DONE |
Tim L. Woodard
|
|
|
Sent plan review report to arch. via e-mail.
|
Routing - PLUMBING | 4/3/2008 | | 4/4/2008 | | PASS |
Bill VanDegrift
|
|
|
vent fixtures in the espresso shop. additional cross connection protection may be required.
|
Routing - PLAN CHECK | 3/24/2008 | | 4/3/2008 | | PEND |
Tim L. Woodard
|
|
|
Plans needed to be routed to plumbing before my review.
|
Routing - PLANNING | 3/24/2008 | | 3/24/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per CZC08-00023. Andrea Tuning ###-####
|
Routing - PUBLIC WORKS | 3/20/2008 | | 3/24/2008 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by MYS | 3/11/2008 | | 3/20/2008 | | DONE |
Marlene Southard
|
|
|
3/20/2008 09:36:29 MYS - activity updated through activity BLDA185 from case BLD08-00435.
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/17/2008 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 3/11/2008 | | |
Tisha Gallop
|
|
|
|