Routing PW Street Lights | 4/25/2008 | | 5/7/2014 | | PASS |
Bill Colson
|
|
|
|
Third Notice BLD | 3/3/2009 | 3/3/2009 | 7/22/2009 | | DONE |
Rita DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/29/2009 | 1/29/2009 | 3/3/2009 | | DONE |
Jim Toombs
|
|
|
First Notice has not been responded to.
|
First Notice | 1/9/2009 | 1/9/2009 | 1/29/2009 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/9/2009 | 1/9/2009 | 1/9/2009 | | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 1/9/2009 | 1/9/2009 | 1/9/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
Letter of compliance | | | 11/4/2008 | | |
|
|
|
|
BLD-Final | 11/2/2008 | 11/3/2008 | 11/3/2008 | P | PASS |
Tom Arcoraci
|
|
|
pending am mech final Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 6:27:28 AM. needs mec final
|
FIRE-Final Inspection | 10/21/2008 | 10/22/2008 | 10/22/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Alarm Testing | 10/20/2008 | 10/21/2008 | 10/22/2008 | P | PASS |
Troy Cobbley
|
|
|
testing for duct detectors passed
|
Zoning Approval | 10/20/2008 | 10/20/2008 | 10/22/2008 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 10/15/2008 | 10/15/2008 | 10/15/2008 | P | DONE |
Troy Cobbley
|
|
|
Per a telephone conversation with the general contractor the existing outside lights, with battery backup, will suffice for the exit discharge lighting.
|
PubWorks Occupancy Approval | 9/29/2008 | 9/29/2008 | 9/29/2008 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Energy code compliance | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | PASS |
Mike Jordan
|
|
|
please schedule closer to lunch if possible. thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Framing/Rough-in | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | PART |
Jim Sly
|
|
|
approval to insulate please Phone #: ###-#### Internet Inspection Request from: John Lodman Exterior walls OK....MTI reports on epoxy retro holdowns OK. Need insp on TI.....OK to insulate ext walls.
|
Inspection Record Card- Bld | | | 9/16/2008 | | DONE |
|
|
|
|
BLD-Other | 7/24/2008 | 7/25/2008 | 7/25/2008 | P | PASS |
Tom Arcoraci
|
|
|
Exterior shear panel inspection only. Interior hold down connections not complete, will request inspection prior to inside wall cover. Contact Matt-framing foreman- on-site. Phone #: ###-#### Internet Inspection Request from: John Lodman wip ok ext
|
BLD-Foundation | 6/26/2008 | 6/27/2008 | 6/27/2008 | A | PART |
Mike Jordan
|
|
|
mid morning if possible. thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman. wip. Installing verts for slab dowels. Need paperwork for change in stemwall size from 12 inch to 10 inch from engineer.
|
BLD-Footing | 6/23/2008 | 6/24/2008 | 6/24/2008 | P | PASS |
Tom Arcoraci
|
|
|
subgrade inspected by MTI on 6/23 as requested. early afternoon rebar inspection please. thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman
|
BLD-Footing | 6/20/2008 | 6/20/2008 | 6/21/2008 | P | NR |
Dave Hannah
|
|
|
inspect footing subgrade prior to rebar placement- thank you. Phone #: ###-#### Internet Inspection Request from: John Lodman needs to have a geo tect engineer ok this footing sub grade
|
(F) Reprint permit | | | 6/6/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2008 | | |
|
|
|
Called left voise message for Eric Anderson at ###-#### that permit ready and also need ACHD,GC#,& RP
|
Inspection Record Card- Bld | | | 5/2/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 5/2/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2008 | | DONE |
|
|
|
Called left voise message for Eric Anderson permit ready and fee given. Also need ACHD,GC#,& RP ///DLD
|
Routing - PLAN CHECK | 5/1/2008 | | 5/1/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2008 | | DONE |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 4/25/2008 | | 5/1/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan assigned to (JCM) | 3/14/2008 | | 5/1/2008 | | PASS |
John Menard
|
|
|
5/1/2008 11:58:02 JCM - activity updated through activity BLDA022 from case BLD08-00457.
|
Routing PW Street Lights | 3/20/2008 | | 4/30/2008 | | PASS |
Bill Colson
|
|
|
INFORMED BRS ARCHITECTS THAT A STREET LIGHTING PLAN WOULD NEED TO BE SUBMITTED FOR REVIEW.
|
Routing PW Solid Waste | 4/25/2008 | | 4/25/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLAN CHECK | 4/15/2008 | | 4/25/2008 | | |
John Menard
|
|
|
|
Routing - FIRE | 4/14/2008 | | 4/15/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 4/7/2008 | | 4/14/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 4/14/2008 | | |
|
|
|
Received response letter to Fire Comments and two copies of C1.0; inserted by arch rep. and taken back to John Menard
|
Plan Reviewer's activity | | | 4/14/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved resubmitted, revised sheets with redlined notes and attached comment list. JCM
|
1st review completed | | | 4/7/2008 | | FAIL |
|
|
|
Failed PW, Plan Check & Fire
|
Routing - FIRE | 4/2/2008 | | 4/7/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
Plan resubmittals received | | | 4/4/2008 | | |
|
|
|
Received 2 page cover letter from BRS dated 4-4-08, 1 copy of plan review report, 2 copies of the following sheets-G-1, SD-1, SD-2, LS-1, LS-2, C3.0, M0.2, P1.0, E1.0, E3.1, inserted by BRS and taken back to Fire inbox///4-4-08 @ 12:15pm BAS
|
Plan resubmittals requested | | | 4/2/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 3/24/2008 | | 4/2/2008 | | FAIL |
John Menard
|
|
|
John M
|
Routing Off Site - STRUCTURAL | 3/14/2008 | | 3/31/2008 | | PASS |
John Menard
|
|
|
Called Action Couriers for pick up - DLD - Received letter from consulting structural engineer approving structural plans and calculations. JCM
|
Routing - PLANNING | 3/21/2008 | | 3/24/2008 | | PASS |
Josh Wilson
|
|
|
Josh W drh07-00286 PASS JGW per redlines sheet LS-1
Susan R cup07-00083 PASS JGW
|
Routing - PLUMBING | 3/21/2008 | | 3/21/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Sewer Rating | | | 3/21/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | | | 3/21/2008 | | FAIL |
Peter J. McCullough
|
|
|
Enclosure size is too small, must be 12' X 12' ID. Bollards and hinge placement obstruct gates from opening 120 degrees.
|
Routing - Erosion and Sediment | 3/21/2008 | | 3/21/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 3/14/2008 | | 3/21/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 3/14/2008 | | 3/19/2008 | | PASS |
Brian Murphy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/14/2008 | | DONE |
|
|
|
Code on cover sheet shows 2003 code John M ok this to be taken in.///dld
|
Routing - PLANNING Land Div | 3/14/2008 | | 3/14/2008 | | PASS |
Dave Abo
|
|
|
Legal parcel - had existing building that was issued building permit #961520 on August 9, 1985. Parcel has not been altered since that date.
|
Plan routing begun/NEW & ADDTN | | | 3/14/2008 | | |
|
|
|
|
Application received | | | 3/14/2008 | | |
|
|
|
|
Pending Assignment by MYS | 3/14/2008 | | 3/14/2008 | | DONE |
John Menard
|
|
|
3/14/2008 11:59:25 JCM - activity updated through activity BLDA166 from case BLD08-00457.
|