Third Notice | | 10/9/2009 | 9/29/2009 | | DONE |
|
|
|
|
Second Notice | | 9/15/2009 | 9/29/2009 | | DONE |
|
|
|
|
First Notice | | 6/19/2009 | 9/15/2009 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 6/19/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 6/18/2009 | 6/18/2009 | 6/18/2009 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/18/2009 at 8:44:07 AM. Received final affidavit letter from Special insp agency.....and final letter from Engineer of record. OK for Perm Occ.
|
BLD-Final | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | CANC |
Jim Sly
|
|
|
Nick Phone #: ###-####
|
Zoning Approval | 6/12/2009 | 6/12/2009 | 6/15/2009 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 6/12/2009 | 6/12/2009 | 6/12/2009 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/12/2009 at 9:32:23 AM. Contact: ###-####. Need Zoning Final, Final letter Engineer and STRATA.
|
FIRE-Final Inspection | 6/11/2009 | 6/12/2009 | 6/12/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PubWorks Occupancy Approval | 6/11/2009 | 6/11/2009 | 6/11/2009 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Conference | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | DONE |
Troy Cobbley
|
|
|
The curtains along the south wall can not block the required exit doors at any time. The south exit door in the main library is required and atleast one of the south facing doors in the southeast corner room is required.
|
BLD-Framing/Rough-in | 4/22/2009 | 4/23/2009 | 4/23/2009 | A | PART |
Jim Sly
|
|
|
gary - ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2009 | 1/20/2009 | 1/20/2009 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/19/2009 at 11:41:42 AM. Contact: ###-####. OK to (1) side all walls........OK to insulate. C/N......Protect penitrations in 1hr wall at book deposit room......ie. Sewer clean out and water valve.
|
Plan Reviewer's activity | | | 10/8/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved deferred submittals for skylight and curtain wall shop drawing and structural calculations. JCM
|
Plan resubmittals received | | | 9/30/2008 | | |
|
|
|
received "3" sets of plans & calculations for deffered submittals for curtain wall shop-- took plans to John Menard
|
Plan resubmittals received | | | 9/11/2008 | | DONE |
John Menard
|
|
|
Recieved 3 copies of supplemental technical data, and 3 copies of pages 1 & 2 for John Menard
|
BLD-Foundation | 9/8/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/8/2008 at 11:05:52 AM. Contact: ###-####. walls at childerns encloser. ok
|
BLD-Footing | 9/2/2008 | 9/3/2008 | 9/3/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/2/2008 at 8:29:44 AM. Contact: ###-####. Footings for retaining walls OK pending STRATA insp, tests and approvals
|
BLD-Foundation | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/21/2008 at 1:15:28 PM. Contact: ###-####. Tall interior shear walls OK pending STRATA special insp, tests and approvals.
|
BLD-Footing | 8/18/2008 | 8/19/2008 | 8/19/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/18/2008 at 11:25:41 AM. Contact: ###-####. Footing at small section of South wall OK pending special insp STRATA ....tests and approvals.
|
BLD-Foundation | 8/13/2008 | 8/14/2008 | 8/14/2008 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/13/2008 at 1:49:55 PM. Contact: ###-####. West foundation wall and interior footing pad located at (mid) East side OK........ pending STRATA special insp, tests, and approvals.
|
BLD-Footing | 8/6/2008 | 8/7/2008 | 8/7/2008 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 8/6/2008 at 2:01:58 PM. Contact: ###-####. wip on interior column pads and interior footings for concrete walls. Will hace special insp.
|
BLD-Footing | 8/1/2008 | 8/4/2008 | 8/4/2008 | A | PART |
Jim Sly
|
|
|
Gary Jones Phone #: ###-#### Footing OK pending special inspection (STRATA) tests and approvals.
|
Plan assigned to (JCM) | 7/15/2008 | 7/15/2008 | 7/16/2008 | | PASS |
John Menard
|
|
|
7/16/2008 09:47:23 JCM - activity updated through activity BLDA022 from case BLD08-00475.
|
Plan Reviewer's activity | | | 7/16/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification to change foundation from monolithic to footing and stem wall. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2008 | | DONE |
John Menard
|
|
|
|
Routing - PLAN CHECK | 7/15/2008 | | 7/16/2008 | | PASS |
John Menard
|
|
|
|
Print Occupancy Form | | | 7/16/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2008 | | DONE |
Cathy Brown
|
|
|
tlk to rob of city of boise that plan modification and fees are ready to be picked up
|
Override - Parcel Holds | | | 7/16/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 7/16/2008 | | DONE |
Cathy Brown
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/16/2008 | | |
|
|
|
previously issued- a plan mod
|
Plan Modification Accepted | | | 7/15/2008 | | |
|
|
|
plan modification excepted for Bld08-00475 for the redesign of revise perimiter footing from thickened slab to continous footing with stem wall on sheets A-301, A-302, A-303, A-304, A-306, A-307, A-511, A-512, & S501. routed to John Menard
|
(F) Reprint permit | | | 6/26/2008 | | |
|
|
|
|
Received Certificate of Value | | | 6/25/2008 | | DONE |
Tisha Gallop
|
|
|
Received revised cert of value from Petra (GC); new project value is $3,387,000; ele $398,930; plm $58,800; mech $221,635; fire sprinkler $28,743; fire alarm $7,185//6/25/08 LEG
|
Issue & PRINT to be Invoiced | | | 6/25/2008 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 6/20/2008 | | 6/23/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2008 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/23/2008 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/17/2008 | | 6/23/2008 | | PASS |
John Menard
|
|
|
6/23/2008 10:54:51 JCM - activity updated through activity BLDA022 from case BLD08-00475.
|
Routing - PLAN CHECK | 6/19/2008 | | 6/20/2008 | | |
John Menard
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2008 | | 6/20/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Solid Waste | 6/20/2008 | | 6/20/2008 | | PASS |
Peter J. McCullough
|
|
|
Enclosure gates not shown on plans, ensure that they can open a minimum of 120 degrees.
|
Routing PW Drainage | 6/20/2008 | | 6/20/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 6/18/2008 | | 6/19/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire plan review notes.
|
Routing - PLAN CHECK | 6/17/2008 | | 6/18/2008 | | |
John Menard
|
|
|
John M.
|
Routing - PLANNING Land Div | 6/17/2008 | | 6/17/2008 | | PASS |
Todd Tucker
|
|
|
ROS08-00007 was recorded on 6/16/08.
|
Plan resubmittals received | | | 6/17/2008 | | |
Barbara Stitt
|
|
|
Received 2 copies of sheets A-101, A-103, M-201, E-201, E-301 and inserted into plans by Rob Bousfield///6-17-08 @ 4:15pm BAS
|
Routing - PLANNING | 6/6/2008 | | 6/11/2008 | | PASS |
Matthew A Halitsky
|
|
|
CUP07-00151-Diane Perkins
|
Routing - PLAN CHECK | 6/5/2008 | | 6/6/2008 | | |
John Menard
|
|
|
|
Routing - FIRE | 6/4/2008 | | 6/5/2008 | | FAIL |
Kenneth R Roule
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PUBLIC WORKS | 5/29/2008 | | 6/4/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 6/3/2008 | | 6/4/2008 | | FAIL |
Peter J. McCullough
|
|
|
Working out access issues to adjacent parcel (Washington Federal)
|
Routing PW Drainage | 5/29/2008 | | 6/3/2008 | | FAIL |
|
|
|
NEED CROSS DRAINAGE ACCESS AGREEMENT. BRIAN MURPHY ###-####
|
Routing - Erosion and Sediment | 5/29/2008 | | 5/29/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. Still need certified RP. The RP information to be supplied to Boise City Building Department prior to start of any land disturbing activities. ESC08-00179.
|
Routing - PLAN CHECK | 5/29/2008 | | 5/29/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/29/2008 | | |
|
|
|
received "2" sheets each of E-201-- plans taken back to John Menard-- the inserter rob bousfield
|
Plan Reviewer's activity | | | 5/29/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions. JCM
|
Routing - PLAN CHECK | 5/6/2008 | | 5/29/2008 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/28/2008 | | |
|
|
|
received 1 response and 4 copies of sheets A-101,A-103,A-401,A-411,A-412,A-414,A-415,A-601,A-416,P-201 inserted by Rob Bousfield from Public Works and plans taken back to John M.
|
Routing - FIRE | 5/1/2008 | 5/1/2008 | 5/6/2008 | | FAIL |
Kenneth R Roule
|
|
|
Review notes Faxed to Architect.
|
1st review completed | | | 5/6/2008 | | FAIL |
John Menard
|
|
|
|
Route to Impact Fee Review | 5/1/2008 | 5/6/2008 | 5/1/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 5/1/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved structural resubmitted information. JCM
|
Plan resubmittals requested | | | 5/1/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 4/8/2008 | | 5/1/2008 | | FAIL |
John Menard
|
|
|
John Menard
|
Plan resubmittals received | | | 4/24/2008 | | |
|
|
|
Received three copies of sheets G-000, G-001, G-002, ESC-1, L-1, L-2, L-3, L-4, S-001, S-002, S-101, S-102, S-103, S-301, S-501, S-561, S-563, S-564, S-565, S-570, A-001, A-101, A-102, A-103, A-104, A-201, A-301, A-302, A-303, A-304, A-305, A-306, A-307, A-401, A-411, A-412, A-413, A-414, A-415, A-416, A-501, A-511, A-512, A-513, A-514, A-515, A-531, A-532, A-533, A-534, A-535, A-536, A-601, I-101, P-001, P-201, P-301, M-001, M-201, M-202, M-301, M-401, E-001, E-002, E-101, E-201, E-202, E-301, E-302, E-501, E-502, E-601; five copies of sheets C-1, C-2, C-3, C-4, C-5; inserted by LEG and taken to John Menard
|
Plan resubmittals received | | | 4/24/2008 | | |
|
|
|
received erosion plans with app & stormwater prevention plan (3) copies--(17) pages-- plans taken back to John Menard
|
Plan resubmittals requested | | | 4/15/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLANNING | 4/4/2008 | | 4/8/2008 | | FAIL |
Matthew A Halitsky
|
|
|
DRH07-00561-Matt Halitsky
Cross-access agreement required.
|
Routing - PLUMBING | 3/28/2008 | | 4/4/2008 | | PASS |
Bill VanDegrift
|
|
|
sheet key note page P-201 #8, cross connection control may be required on future coffee maker.
|
Routing Off Site - STRUCTURAL | 3/18/2008 | | 4/3/2008 | | FAIL |
John Menard
|
|
|
Called Action Courier for pick up///3-18-08 @ 12:42pm BAS
|
Routing PW Solid Waste | 3/27/2008 | | 4/1/2008 | | FAIL |
Peter J. McCullough
|
|
|
Worked out issue with R. Bousfield. Waiting for re-submittals and will pass. PJM ###-####.
|
Routing - PUBLIC WORKS | 3/20/2008 | | 3/28/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing - Erosion and Sediment | 3/28/2008 | | 3/28/2008 | | FAIL |
Steven Webb
|
|
|
ESC plan does not meet requirements according to BMC 8-17. Plan review checklist faxed to PD. Re-submittal is required. RP listed on application is not certified as RP.
|
Routing PW Drainage | 3/20/2008 | | 3/27/2008 | | FAIL |
Brian Murphy
|
|
|
NEED CROSSDRAINAGE ACCESS AGREEMENT
|
Routing PW Street Lights | | | 3/27/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Rating | | | 3/27/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plan resubmittals received | | | 3/26/2008 | | |
|
|
|
received two copies of sheet C-5; inserted by eng. rep. and taken plans back to Brian Murphy
|
Routing - PLANNING Land Div | 3/18/2008 | | 3/20/2008 | | FAIL |
Dave Abo
|
|
|
Prior to issuance of building permit, Record of Survey, Property Line Adjustment must be completed. Application has been submitted (refer ROS08-00007)
|
Plans ACCEPTED BY PLAN TECH | | | 3/18/2008 | | PASS |
Bethany Sullins
|
|
|
|
Application received | | | 3/17/2008 | | |
|
|
|
|
Pending Assignment by MYS | 3/17/2008 | | 3/17/2008 | | DONE |
John Menard
|
|
|
3/17/2008 14:45:06 JCM - activity updated through activity BLDA166 from case BLD08-00475.
|