First Notice | | 8/26/2008 | 8/26/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/26/2008 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | PASS |
Dave Hannah
|
|
|
gary Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/12/2008 | 8/12/2008 | 8/12/2008 | P | FAIL |
Forrest France
|
|
|
Install approved hardware at the mechanical room door, provide "door to remain unlocked while building is occupied" signage at the main door, the existing vault door must be arranged to eliminate the potential for an occupant to be locked inside.
|
BLD-Final | 4/7/2008 | 4/7/2008 | 4/7/2008 | P | NR |
Dave Hannah
|
|
|
jerry Phone #: ###-#### needs fire final first
|
Issue PAID IN FULL permit | | | 3/25/2008 | | |
|
|
|
|
Print Occupancy Form | | | 3/24/2008 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2008 | | DONE |
|
|
|
Called and left voice message for Pete Conlon that permits are ready & fees///3-24-08 BAS
|
Telephone call | | | 3/24/2008 | | DONE |
|
|
|
Spoke with Pete Rutherford and told him that permit is ready& fees///3-24-08 BAS
|
Plan assigned to (R_H) | 3/18/2008 | | 3/21/2008 | | PASS |
Ron Hill
|
|
|
3/21/2008 16:05:11 RMH - activity updated through activity BLDA022 from case BLD08-00480.
|
Routing - PLAN CHECK | 3/18/2008 | | 3/21/2008 | | PASS |
Ron Hill
|
|
|
|
1st review completed | | | 3/21/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/21/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/19/2008 | | DONE |
|
|
|
|
Application received | | | 3/18/2008 | | |
|
|
|
|