Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00508
StatusFinaled
Name ZZZZ VENTURES LLC
Site Address 3082 S BOWN WAY Unit: 100
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(HABITAT PET CLINIC - TENANT EXPANSION - BOWN CROSSING MARKET PLACE - BLDG C) (1-25-10 PLAN MODIFICATION TO SCALE BACK THE PROJECT WITHIN THE EXPANSION AREA AND TO RECONFIGURE THE RAMP.) This building is fire sprinklered for story and height increase. To expand an existing tenant space located on the 1st story of an existing building into an adjacent area. After the expansion, this tenant space will have a total floor area of about 2,741 square feet. Work is to include an interior ramp, interior nonbearing walls, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board soffits, interior windows, interior doors, millwork, and finishes. The restrooms are existing and shall be maintained accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 5/28/20106/4/2010 DONE
Permanent Occupancy  5/18/2010 DONE
BLD-Final4/19/20104/20/20104/21/2010PPASS
DetailsJim Storey
Steve Phone #: ###-####
FIRE-Final Inspection4/19/20104/20/20104/20/2010APASS
DetailsForrest France
Fire life safety inspection passed. Note; no changes to HVAC as indicated on plans- fire alarm permit to add duct detector N/A.
BLD-Final4/19/20104/20/20104/20/2010APASS
DetailsJim Storey
Steve Phone #: ###-####final ok mech n/a
BLD-Final4/16/20104/19/20104/19/2010ACANC
DetailsJim Storey
Steve Phone #: ###-#### - after 9
BLD-Aging Inspection4/16/20104/16/20104/16/2010PDONE
DetailsForrest France
On site visit with Reed regarding items needed for final, project completion schedule and project related fire sprinkler and alarm work.
BLD-Framing/Rough-in2/22/20102/22/20102/23/2010PPASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Aging Inspection2/22/20102/22/20102/22/2010 DONE
DetailsJim Storey
Telephone call  1/26/2010  
DetailsTisha Gallop
spoke to Reed and told him plan mod fees, need complete revised Cert of Value.
CHANGE STATUS TO (ISS)  1/26/2010 DONE
DetailsTisha Gallop
plan mod paid for and picked up
Received Certificate of Value  1/26/2010 DONE
DetailsTisha Gallop
revised cert of vaule from Plan mod is prj $50,000; ele $6,500; plm $3,500; mech $3,000; fire spr $1,500; fire alarm -0-//1/26/10 LEG
Plan assigned to (CJW)1/8/20101/8/20101/25/2010 PASS
DetailsCarl Westfall
1/25/2010 11:41:17 CJW - activity updated through activity BLDA022 from case BLD08-00508.
Routing - PLAN CHECK1/21/2010 1/25/2010 PASS
DetailsCarl Westfall
Approved the plan modification.
PLANS/APPL TAKEN TO FRONT DESK  1/25/2010 PASS
Plan modification approved.
Print Occupancy Form  1/25/2010 DONE
DetailsTisha Gallop
Telephone call  1/25/2010 DONE
DetailsTisha Gallop
called Reed and left vm plan mod is ready and to call me.
Permit Ready to Issue  1/25/2010 DONE
DetailsTisha Gallop
Routing - PUBLIC WORKS1/20/2010 1/21/2010 DONE
DetailsConnie Baumgartner
Check sewer fees.
Routing - PLAN CHECK1/15/2010 1/20/2010  
DetailsCarl Westfall
Sent back to PW for sewer fee check.
Plan Modification Accepted  1/15/2010  
DetailsCarl Westfall
Rec'd Plan mod to change ramp design, remodel of existing retail space to add two exam rooms, remodel of new space to add a ramp, x-ray room and cage room; two copies of sheet A-3.1
BLD-Conference12/22/200912/23/200912/23/2009APASS
DetailsJim Storey
Kevin Phone #: ###-#### resubmitals in progress.
BLD-Framing/Rough-in12/23/200912/23/200912/23/2009APART
DetailsJim Storey
ok to cover sm area north side of project walls. resubmitals in progress thru planreview.
BLD-Framing/Rough-in12/22/200912/22/200912/22/2009PPART
DetailsJim Storey
Kevin Phone #: ###-#### wiil meet tomarow.
Telephone call  11/2/2009  
DetailsTisha Gallop
received phone call from John Cotner wanting to inquire on status of permit. Told him buidling inspector did not want to expire permit. Owner needs to submit letter to assign GC to new contractor, plumbing permit needs final inspection, and no mechanical permit pullled yet.
BLD-Aging Inspection10/26/200910/26/200910/26/2009 PASS
DetailsJim Storey
no call for insp. pending plm.
BLD-Aging Inspection8/24/20098/24/20098/27/2009 PASS
DetailsJim Storey
no call for insp. pending plm.
BLD-Aging Inspection6/23/20096/23/20096/23/2009 NR
DetailsJim Storey
BLD-Aging Inspection4/14/20094/14/20094/14/2009 NR
DetailsJim Storey
BLD-Aging Inspection2/10/20092/10/20092/10/2009 PASS
DetailsJim Storey
wip ele finaled/ plm ri
FIRE-Conference12/8/200812/8/200812/8/2008PNR
DetailsForrest France
Reed Phone#: ###-####
BLD-Conference10/23/200810/27/200810/27/2008PPASS
DetailsJim Storey
reed Phone #: ###-####
Issue PAID IN FULL permit  10/23/2008 DONE
Telephone call  10/8/2008 DONE
left mess for reed linenberger at ###-#### that permit is ready & need gc & rce
Ready Permit EXTENDED  9/22/2008  
extend to march 18th 2009
Telephone call  8/25/2008 DONE
DetailsTisha Gallop
returned phone call from Reid Linenberger, left message that permit is ready, fees due, exp date is 9-18-08 and need GC, RCE
Telephone call  8/15/2008 DONE
left mess for Dan patton at ###-####, permit ready
Print Occupancy Form  6/19/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  6/19/2008  
DetailsAlexandra L. DeYoung
Called Dan at###-####, permit ready, fees given
Permit Ready to Issue  6/19/2008 DONE
DetailsAlexandra L. DeYoung
Routing - PLAN CHECK6/16/2008 6/18/2008 PASS
DetailsCarl Westfall
Plans taken to permit desk to issue on 6/18/2008.
Routing - PLANNING6/4/2008 6/18/2008 PASS
DetailsDavid Moser
Planning 10 day appeal period is over. Route back to plan check.
PLANS/APPL TAKEN TO FRONT DESK  6/18/2008 DONE
Plan assigned to (CJW)3/21/2008 6/18/2008 PASS
DetailsMarlene Southard
6/18/2008 15:26:20 MYS - activity updated through activity BLDA022 from case BLD08-00508.
Routing - PLANNING6/3/2008 6/4/2008 FAIL
DetailsDavid Moser
Failed plans because Hearing Examiner meeting is 6-4-08 and the 10 day appeal period starts tomorrow if project is approved.
Routing - PLUMBING6/2/2008 6/3/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLAN CHECK4/30/2008 6/2/2008 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Routing - PUBLIC WORKS6/2/2008 6/2/2008 DONE
Added fixtures. Additional fees assessed.
Plan resubmittals received  5/21/2008  
DetailsTisha Gallop
Received two copies of sheets A3.1, A8.2, A9.3, P1.0, P1.1, E2.0L, E2.0P, E3.1; taken to Carl Westfall
Route to Impact Fee Review4/30/20085/5/20085/1/2008 PASS
DetailsCindy M. Gould
Routing - FIRE4/26/20084/26/20084/30/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/30/2008 FAIL
Failed Planning, Plan Check
Routing - PLAN CHECK4/4/2008 4/26/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 24, 2006 and was finished on April 26, 2006. Revised drawings were required. See the plan review report.
Routing - PLANNING4/3/2008 4/4/2008 FAIL
DetailsCody Riddle
Cody Riddle. Verification that a small animal veterinary hospital is allowed in a P-CD District.
A veterinary clinic will require conditional use approval in the PC-D zone. Spoke with architect at 11:00 today. Will be meeting to discuss CUP process. CER
Plan resubmittals received  4/4/2008  
DetailsMarsha Smylie
received "1" sheet each of P1.O, P1.1, & P2.1-- plans taken to Carl Westfall
Routing - PLUMBING3/25/2008 4/3/2008 FAIL
DetailsBill VanDegrift
all water to treatment area to be fed through R.P.'s located with drainage. vent TD-1.
Routing - PUBLIC WORKS3/21/2008 3/25/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating3/24/2008 3/24/2008 PASS
DetailsLouise Waldorf
Routing PW Environmental3/24/2008 3/24/2008 PASS
DetailsWalt Baumgartner
digital xray, small solids separator, OK
Pending Assignment by MYS3/19/2008 3/21/2008 DONE
DetailsMarlene Southard
3/21/2008 09:03:31 MYS - activity updated through activity BLDA172 from case BLD08-00508.
Plans ACCEPTED BY PLAN TECH  3/19/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  3/19/2008 DONE
DetailsTisha Gallop
Application received  3/19/2008  
DetailsTisha Gallop