To replace damaged roadways, curbs and surfaces within Julia Davis park. Recycle and overlay existing roadway asphalt, add new sidewalks, upgrade drainage systems and reconstruct parking areas. This permit is for grading and drainage only. No building construction shall be allowed under this permit. *SJA*
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/5/20101/5/20101/5/2010 PASS
DetailsDave Hannah
DOC - Permit Finaled1/5/20101/5/20101/5/2010APASS
DetailsDave Hannah
PubWorks Occupancy Approval12/30/200912/30/200912/30/2009 DONE
DetailsTiffany Lowery
Plan resubmittals received  10/10/2008  
received letter of transmittal from j u b engineers & letter from Brad Watson-- also "3" sets of plans with each sheet L1.5, L2.5, & LO.5, --took plans to Brian Murphy
Plan resubmittals received  10/9/2008  
DetailsBrian Murphy
Received 1 cover transmittal to Brian Murphy, 1copyof agreement for miscellaneous civil engineering services (RFP 05-084), 3 copies of AquaShield's Aqua Swril Concentrator System, 4 copies of sheets L1.5, L2.5, L0.5and taken to Brian Murphy's desk 10-11-08 @ 8:20am BAS
BLD-Aging Inspection7/8/20087/8/20087/8/2008 PASS
DetailsDave Hannah
wip
Routing - PLAN CHECK4/7/2008 4/8/2008 PASS
DetailsBethany Sullins
Permit Ready to Issue  4/8/2008 DONE
Telephone call  4/8/2008 DONE
Called John Priester and told him permit is ready & fees///4-8-08 BAS
Telephone call  4/8/2008 DONE
Left voice message for Greg Pulley that permit is ready, fees, need GC and RP about to expire next week///4-8-08 BAS
Issue PAID IN FULL permit  4/8/2008 DONE
Plan resubmittals received  4/7/2008 DONE
DetailsBarbara Stitt
Recieved letter from Johmn Priester authorizing the red line modifications to plans. Removing/striking shown traffic calming devices from plans.
Routing - FIRE4/7/2008 4/7/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Telephone call  4/4/2008 DONE
DetailsScott Arellano
Received voice mail message from Dave Selvage of parks & recreation department, informing PDS/Fire that the (8) traffic claming devices shown on submitted plans, along julia Davis park Road, will no longer be installed.
1st review completed  4/3/2008 FAIL
Failed Fire.
Routing - PUBLIC WORKS3/27/2008 4/3/2008 PASS
DetailsBeverly Hall
Routing - PLUMBING4/3/2008 4/3/2008 PASS
DetailsBill VanDegrift
NO PLUMBING
Routing - FIRE4/3/2008 4/3/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing PW Drainage3/27/2008 4/3/2008 PASS
DetailsBrian Murphy
Routing PW Sewer Rating  4/3/2008 PASS
DetailsLouise Waldorf
Routing PW Sewer Design3/28/2008 4/3/2008 PASS
DetailsJon R. Gunnerson
Plan resubmittals received  4/3/2008  
Received 5 copies of sheets L2.D, L2.2, L2.3, L1.3, L1.2 and 1 copy of an addendum, inserted into plans by me and taken back to Brian Murphy's desk///4-3-08 @ 9:00am BAS
Routing - PLANNING3/27/2008 3/27/2008 PASS
DetailsCody Riddle
Routing - PLANNING Land Div3/26/2008 3/26/2008 PASS
DetailsJoan Johnson
grading and drainage only
Application received  3/26/2008  
DetailsBethany Sullins
Plans ACCEPTED BY PLAN TECH  3/26/2008 PASS
DetailsBethany Sullins
Plan routing begun/NEW & ADDTN  3/26/2008  
DetailsBethany Sullins
Routing - Erosion and Sediment3/21/2008 3/21/2008 PASS
DetailsSteven Webb
Routing - Erosion and Sediment3/21/2008 3/21/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
First Notice1/5/20101/5/2010   
DetailsDave Hannah
Routing - PUBLIC WORKS10/10/2008    
DetailsBrian Murphy