Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD08-00567
StatusFinaled
Name WRIGHT BROTHERS THE BLDG CO
Site Address 2600 S LIBERTY RD
Project NameCMC Construction Serv/Conesco
Customer Number 
ePlanReviewNo
Description
(CMC CONSTRUCTION SERVICES) Permit to construct a new 6,328 square foot office/warehouse building. Non-separated uses section 508.3.2 of the IBC was used and the most restrictive was the "S-1" occupancy. Office space encompasses 1,697 square feet and the warehouse makes up 3,953 square feet. The additional square footage is accessory use areas and a workroom on the second floor. Scope of work includes: a new foundation, construction of a Steel frame with curtain walls in between columns, metal skinned with w/4 foot exposed concrete stem walls, a metal canopy extending 4 feet over public entrance, [installation of interior non bearing walls to create two restrooms, three offices, a reception area, a workroom, a storage closet, and the warehouse area], Installation of interior bearing walls to support second floor joists over office space, installation of a a mechanical unit w/ related ducts and diffusers, installation of interior finishes, installation of plumbing and related fixtures, and installation of electrical and related fixtures. This building is not sprinklered.**TLW** PLAN MODIFICATION 3-25-09: Owner wanted a different name on C of O so that planning will issue a sign permit for that name. No occupancy permit is required due to haveing the same owner. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  3/25/2009 DONE
DetailsTim L. Woodard
PLAN MODIFICATION 3-25-09: Owner wanted a different name on C of O so that planning will issue a sign permit for that name. No occupancy permit is required due to haveing the same owner. TLW
Permanent Occupancy  3/25/2009 DONE
New cert of occupancy issued as same owner different project name-approved by Tim Woodard
Second Notice BLD1/2/20091/2/20091/13/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 11/21/20081/2/2009 DONE
Permanent Occupancy  11/21/2008 DONE
(F) Reprint permit  11/20/2008  
BLD-Final11/16/200811/17/200811/17/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/16/2008 at 6:40:27 PM. Contact: ###-####.
FIRE-Final Inspection11/13/200811/14/200811/14/2008PPASS
DetailsForrest France
Life safety inspection passed.
Zoning Approval11/13/200811/13/200811/13/2008 PASS
DetailsJosh Wilson
OK per DRH07-00499
PubWorks Occupancy Approval11/21/200811/21/200811/12/2008 DONE
Final inspection completed 11/12/08.
BLD-Other11/6/200811/7/200811/7/2008APASS
DetailsTom Arcoraci
Craig- ceiling grid Phone #: ###-####
BLD-Framing/Rough-in10/8/200810/8/200810/8/2008PPART
DetailsJim Sly
C/N Non comply run at stairs, Need Eng and detail from Arch for balcony....and how to maintain 1hr at balcony. Need 1hr wall to extend all the way to Ext walls. Gave them OK to rock areas not affected by corrections.
BLD-Framing/Rough-in10/7/200810/8/200810/8/2008ADEFR
DetailsMike Jordan
rex - late morning please Phone #: ###-####. Rescheduled for this afternoon.
BLD-Other9/18/20089/18/20089/18/2008ADONE
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/18/2008 at 6:47:48 AM. Contact: ###-####.
Talked to Contr....Need detail and UL listing from Architect for 1hr wall / roof deck to maintain 1hr rating.
BLD-Foundation8/29/20088/29/20088/29/2008PPASS
DetailsJim Storey
Craig Phone #: ###-####pending si reoort
BLD-Foundation8/14/20088/15/20088/15/2008APART
DetailsMike Jordan
craig Phone #: ###-####. wip on perimeter stemwall. interior forms not yet placed. Needs to adjust #3 rings at column locations. Will have special insp.
BLD-Footing8/11/20088/12/20088/12/2008APART
DetailsJim Sly
Craig Phone #: ###-####
inspected rebar... appears ok Except plans do not show deeper footing with taller wall at South 1/2 of East wall.....Architect to address this area. Contractor proceeding at own risk.....I verified typical horizontal bar in footing with #5 at 16" oc verts in this area.
Override - People Holds  7/28/2008  
Issue PAID IN FULL permit  7/28/2008 DONE
DetailsBarbara Stitt
this is an engineer
OVERRIDE  7/25/2008  
Print Occupancy Form  7/25/2008 DONE
Details
Telephone call  7/25/2008 DONE
Details
t/c w tim miller at ###-#### - permit ready and fees given
Override - People Holds  7/25/2008  
Permit Ready to Issue  7/25/2008 DONE
Details
Routing - PLAN CHECK7/22/2008 7/24/2008 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/24/2008 DONE
Plan assigned to (TLW)3/28/2008 7/24/2008 PASS
DetailsTim L. Woodard
7/24/2008 16:38:08 TLW - activity updated through activity BLDA022 from case BLD08-00567.
Routing - FIRE7/22/2008 7/22/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK7/8/2008 7/21/2008 PASS
DetailsTim L. Woodard
Plan resubmittals received  7/11/2008 DONE
received 1 transmittal letter and 4 copies of sheet A101, A201 inserted by Brooke Compton with CTA and returned to Tim W.
Routing - PUBLIC WORKS7/7/2008 7/8/2008 PASS
DetailsLouise Waldorf
Routing PW Drainage7/8/2008 7/8/2008 PASS
DetailsBrian Murphy
Routing PW Sewer Rating7/8/2008 7/8/2008 PASS
DetailsLouise Waldorf
Plan resubmittals received  7/7/2008  
DetailsTim L. Woodard
Received five copies of sheets C4.01, C6.02; inserted by arch. rep. and taken back to Tim Woodard
Routing - PLAN CHECK6/18/2008 6/20/2008 FAIL
DetailsTim L. Woodard
Refer to plan review report labled IBC 2nd Review for corrections.
Routing - PLUMBING6/16/2008 6/18/2008 PASS
DetailsBill VanDegrift
increase venting in 1st floor ceiling to 3" at the junction of the two horizontal 2" vents.
Routing - PUBLIC WORKS6/5/2008 6/16/2008 FAIL
DetailsLouise Waldorf
Routing PW Sewer Design6/12/2008 6/16/2008 PASS
DetailsJon R. Gunnerson
Connect to existing sanitary sewer service provided.
Plan resubmittals received  6/16/2008  
DetailsTim L. Woodard
Received 1 cover transmittal, 2 copies of sheets A101, S101, s202 and taken to Tim Woodards desk///6-16-08 @ 10:25am BAS
Routing PW Drainage6/5/2008 6/13/2008 FAIL
DetailsBrian Murphy
NEED O AND M PLAN REVISION BRIAN MURPHY ###-####
Routing - PLAN CHECK4/28/2008 6/5/2008 PEND
DetailsTim L. Woodard
Routed plans to PW.
Plan resubmittals received  5/30/2008 DONE
received 1 transmittal ,1 response letter, 2 structural calcs,2 design structural calcs,and 2 copies of sheets 1 of 18,C5.00,A101,A201,A401,A901,M101,P101 inserted by Tracy Read from CTA Architects plans returned to Tim W.
Telephone call  5/20/2008 DONE
DetailsScott Arellano
Contacted Ken Nguyen regarding fire dept vehicle access. FD access will be from the north along Malad street. Two existing fire hydrants are located along Liberty street within maximum spacing requirements for this building.
1st review completed  4/28/2008 FAIL
Failed PW, Plumbing, Planning, Plan Check, Fire
Routing - FIRE4/24/2008 4/28/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK4/17/2008 4/24/2008 FAIL
DetailsTim L. Woodard
Corrections noted in plan review report. Tim W.
Routing - PLANNING4/17/2008 4/17/2008 PASS
DetailsJosh Wilson
Josh W.
Routing - PLUMBING4/16/2008 4/17/2008 FAIL
DetailsBill VanDegrift
replace R.P. on the water service with a DCVA or increase floor drain to a 4". show location and piping to the required mop sink and drinking fountain. provide a site plan showing approved location of the sewer service, water service to match plumbing plans.
Plan resubmittals received  4/17/2008  
Received via e-mail to Brian Murphy copy of geo tech and drainage calcs and taken and inserted to plans///4-17-08 bas
Routing - Erosion and Sediment4/14/2008 4/16/2008 PASS
DetailsJames Rogers
Routing - PUBLIC WORKS3/28/2008 4/14/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage4/4/2008 4/14/2008 FAIL
DetailsBrian Murphy
NO O AND M OR GEOTECH. call brian murphy ###-####
Routing PW Sewer Rating  4/14/2008 FAIL
DetailsLouise Waldorf
Routing Off Site - STRUCTURAL3/28/2008 4/10/2008 FAIL
DetailsTim L. Woodard
Called Actopn Couriers for pick up
Routing PW Solid Waste  4/7/2008 PASS
DetailsPeter J. McCullough
Property is fully fenced, no enclosure proposed.
Routing PW Environmental4/7/2008 4/7/2008 PASS
DetailsWalt Baumgartner
Warehouse and office supporting concrete contractors. Storage of Pre-fab specialized concrete forms for use by contractors.
Routing PW Sewer Design3/28/2008 4/4/2008 FAIL
DetailsJon R. Gunnerson
Engineer will re-submit site plan and connect to existing sewer service contact Jon Gunnerson ###-####
Routing PW Street Lights4/4/2008 4/4/2008 PASS
DetailsBill Colson
Plans ACCEPTED BY PLAN TECH  3/28/2008  
Plans show Envelope Compliance Certificate 03
Mechanical Compliance 03
LightingCompliance 03
Plans ok by Tim W.
Plan routing begun/NEW & ADDTN  3/28/2008 DONE
Routing - PLANNING Land Div3/28/2008 3/28/2008 PASS
DetailsJoan Johnson
Randall Acres sub
Application received  3/26/2008