Permit Information
Permit NumberBLD08-00594
StatusFinaled
Name INTERMOUNTAIN PROPERTY DEVELOPMENT
Site Address 3858 N GARDEN CENTER WAY STE 301
Project NameGARDEN CENTER
Customer Number 
ePlanReviewNo
Description
(THE TERTELING COMPANY, INC. - 3RD STORY) This building is fire sprinklered for code trade-offs. To construct a 6,330 square foot whole floor office tenant space on the 3rd story of a new 21,000 square foot 3 story building. Work is to include interior nonbearing walls, interior doors, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. The restrooms, drinking fountain, and service sink were installed under the shell permit (BLD07-03134). The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW** 7-30-09 FINAL CERT OF VALUE $ 286,250.72 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/24/20097/30/2009 DONE
First Notice 6/5/20097/24/2009 DONE
Permanent Occupancy  6/5/2009 DONE
Zoning Approval5/15/20095/15/20095/15/2009 DONE
DetailsSarah Schafer
All conditions of the DR have been met for this structure.
BLD-Final5/13/20095/13/20095/13/2009PNR
DetailsTom Arcoraci
dan Phone #: ###-#### pending zoning
Temporary Occupancy1/30/20094/30/20091/30/2009 DONE
DetailsAlexandra L. DeYoung
BLD-Final1/28/20091/29/20091/29/2009PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Jessica Noland
temp ok,, need full final on shell and core prior to full c of o
FIRE-Final Inspection1/28/20091/29/20091/29/2009APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection1/27/20091/28/20091/28/2009PCANC
DetailsTroy Cobbley
fire life safety Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
FIRE-Final Inspection1/26/20091/27/20091/27/2009PCANC
DetailsTroy Cobbley
The life safety can be finaled when the project related fire sprinkler permit is finaled.
FIRE-Final Inspection1/23/20091/26/20091/26/2009PCANC
DetailsTroy Cobbley
Need the project related fire alarm and fire sprinkler permits finaled first. I also ran out of time for the inspection today.
BLD-Framing/Rough-in12/30/200812/30/200812/30/2008PPART
DetailsTony Young
above ceiling grid Phone #: ###-#### Internet Inspection Request from: Jessica Noland
3rd floor ok
BLD-Framing/Rough-in11/6/200811/7/200811/7/2008PPASS
DetailsTony Young
inspection to cover Phone #: ###-#### Internet Inspection Request from: Jessica Noland
all walls ok to cover pending trades
FIRE-Conference7/14/20087/15/20087/15/2008PDONE
DetailsTroy Cobbley
This conference was for whether the doors from the tenant spaces to the stairwell can lock. Per the 2006 IFC these doors can not lock except if the meet the three exceptions. I let Dan know.
BLD-Other5/14/20085/16/20085/15/2008ACANC
DetailsTony Young
7am rebar placement and grout pour Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD-Other5/14/20085/15/20085/15/2008APART
DetailsJim Sly
Threaded Rebar Inspection - Masonry Phone #: ###-#### Internet Inspection Request from: Jessica Noland
OK pending MTI special inspection....tests....and approvals.
Issue PAID IN FULL permit  5/14/2008 DONE
Print Occupancy Form  5/6/2008 DONE
Telephone call  5/6/2008 DONE
t/c w bill beckman at ###-#### - permit ready and fees given
Permit Ready to Issue  5/6/2008 DONE
Routing - PLAN CHECK5/2/2008 5/5/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/5/2008 DONE
Plan assigned to (CJW)4/2/2008 5/5/2008 PASS
DetailsCarl Westfall
5/5/2008 16:11:59 CJW - activity updated through activity BLDA022 from case BLD08-00594.
Routing - FIRE4/29/20084/29/20085/2/2008 PASS
DetailsScott Arellano
See attached review notes.
1st review completed  5/2/2008 PASS
Route to Impact Fee Review4/30/20085/5/20085/1/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK4/7/2008 4/29/2008 PASS
DetailsCarl Westfall
The IBC plan review was started on April 28, 2008 and finished the next day. The drawings were approved with "red lines". See the plan review report.
Routing - PUBLIC WORKS4/2/2008 4/7/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating  4/7/2008 PASS
DetailsLouise Waldorf
Routing PW Flood Plain4/4/2008 4/4/2008 PASS
DetailsJim Wyllie
Construction on tenant improvement shall not commence until after an Elevation Certificate has been submitted to and approved by Public Works. Building framing inspection shall not be scheduled until after Elevation Certificate has been submitted to and reviewed by Public Works.
Routing - Addressing4/2/2008 4/2/2008 PASS
Pending Assignment by MYS3/31/2008 4/2/2008 DONE
DetailsMarlene Southard
4/2/2008 11:41:38 MYS - activity updated through activity BLDA172 from case BLD08-00594.
Recd Pcfee & Taken To Pln CK  3/31/2008 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  3/31/2008  
DetailsTisha Gallop
Application received  3/28/2008  
DetailsTisha Gallop