Third Notice | | 7/24/2009 | 8/17/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 7/24/2009 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 3/3/2009 | 3/3/2009 | 7/24/2009 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
First Notice | 2/17/2009 | 2/17/2009 | 3/4/2009 | | DONE |
Jim Storey
|
|
|
|
PubWorks Occupancy Approval | 3/3/2009 | 3/3/2009 | 3/3/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PASS |
Jim Storey
|
|
|
l/c isued
|
DOC - Permit Finaled | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/3/2009 | 2/4/2009 | 2/5/2009 | P | PART |
Jim Storey
|
|
|
dale Phone #: ###-#### bld ok need public works to sign off for final.
|
FIRE-Final Inspection | 2/3/2009 | 2/4/2009 | 2/4/2009 | A | PASS |
Forrest France
|
|
|
Shell building life safety inspection passed, inspection card previously signed.
|
CHANGE STATUS TO (ISS) | | | 1/15/2009 | | DONE |
|
|
|
plan mod fee paid nad put back to issue
|
(F) Reprint permit | | | 1/15/2009 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/13/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/13/2009 | | DONE |
|
|
|
left vm for ross erickson at ###-#### - plan mod ready to pick up and fees given
|
Permit Ready to Issue | | | 1/13/2009 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 1/6/2009 | 1/6/2009 | 1/12/2009 | | PASS |
John Menard
|
|
|
1/12/2009 16:28:07 JCM - activity updated through activity BLDA022 from case BLD08-00595.
|
Plan Reviewer's activity | | | 1/12/2009 | | PASS |
John Menard
|
|
|
This permit was modified to move the building approximately 15 feet to the north. This involved some site layout and landscaping changes. There were no building modifications. This modification was approved on 1/12/09. JCM
|
Routing - PLANNING | 1/12/2009 | | 1/12/2009 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2009 | | DONE |
John Menard
|
|
|
|
Plan Modification Accepted | | | 1/6/2009 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted for the building being shifted north approximately 15'. Only minor site layout and landscaping changes and no building appearance changes. Sheets C2.1 & L1.0 submitted per approval from John Menard 1-6-09 BAS
|
Plan resubmittals received | | | 12/8/2008 | | |
Brian Murphy
|
|
|
Rec'd three copies of sheet C2.1; taken to Brian M
|
Plan resubmittals received | | | 12/5/2008 | | |
Brian Murphy
|
|
|
Rec'd one transmittal letter, and two copies of sheets C2.1; taken to Brian M
|
FIRE-Final Inspection | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Forrest France
|
|
|
Shell permit fire life safety inspection passed.
|
Zoning Approval | 11/20/2008 | 11/20/2008 | 11/20/2008 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | NR |
Jim Storey
|
|
|
dale Phone #: ###-#### conf.
|
BLD-Framing/Rough-in | 10/6/2008 | 10/7/2008 | 10/7/2008 | A | PASS |
Jim Storey
|
|
|
dale Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | CANC |
Jim Storey
|
|
|
dale Phone #: ###-#### wet slb on grade.
|
BLD-Framing/Rough-in | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | PASS |
Jim Storey
|
|
|
dale Phone #: ###-#### rebar first lift ok si ok
|
BLD-Foundation | 7/16/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Jim Storey
|
|
|
Dale Phone #: ###-####
|
BLD-Footing | 7/10/2008 | 7/10/2008 | 7/10/2008 | P | PASS |
Jim Storey
|
|
|
dale Phone #: ###-####
|
(F) Reprint permit | | | 6/20/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/19/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/16/2008 | | 6/17/2008 | | PASS |
John Menard
|
|
|
John Menard
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 6/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/17/2008 | | DONE |
|
|
|
called left voise message permit ready and fee given Also Need GC/RCE number,RP AND ACHD
|
Plan assigned to (JCM) | 4/1/2008 | | 6/17/2008 | | PASS |
John Menard
|
|
|
6/17/2008 08:46:37 JCM - activity updated through activity BLDA022 from case BLD08-00595.
|
Routing - PLAN CHECK | 6/6/2008 | | 6/16/2008 | | |
John Menard
|
|
|
Routed to Plumbing due to resubmittal
|
Plan resubmittals received | | | 6/16/2008 | | |
John Menard
|
|
|
Received 1 cover transmittal and 2 copies of sheet C2.1 and inserted into plans then routed to Plumbing per John Menard///6-16-08 @ 11:21am BAS
|
Routing - PLUMBING | 6/16/2008 | | 6/16/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Plan Reviewer's activity | | | 6/9/2008 | | PASS |
|
|
|
Reviewed and approved structural response and calculations. JCM
|
Routing - FIRE | 6/6/2008 | | 6/6/2008 | | PASS |
Kenneth R Roule
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 5/20/2008 | | 6/6/2008 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/3/2008 | | |
|
|
|
Reiceved a resubmittal of page C1.1 and C3.1 on my desk on Monday June 2nd 2008.the paper work that was submitted was for Wintercreek subdivision and not the family center.Called and left a messsage for Mike Dahlberg with Thorton Oliver Keller to locate the correct paper work.
|
Plan resubmittals received | | | 6/3/2008 | | |
|
|
|
received 1 transmittal letter,1 response letter, and 3 calcs inserted by Mike Dahlberg and plans taken back to John M.
|
Routing - PUBLIC WORKS | 5/19/2008 | | 5/20/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING | 5/20/2008 | | 5/20/2008 | | PASS |
Josh Wilson
|
|
|
Revised elevations comply with conditions of approval JGW
|
Routing PW Environmental | 5/19/2008 | | 5/19/2008 | | PASS |
Walt Baumgartner
|
|
|
segragated grease line serving all tenant spaces. OK
|
Routing - PLAN CHECK | 5/13/2008 | | 5/19/2008 | | |
John Menard
|
|
|
|
Routing - PLAN CHECK | 5/9/2008 | | 5/13/2008 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 5/13/2008 | | DONE |
|
|
|
received 1 transmittal letter,and 2 copies of sheets C1.1,C3.1 inserted by Candice Ranson and returned to John M.
|
Routing - PLUMBING | 5/13/2008 | | 5/13/2008 | | FAIL |
Bill VanDegrift
|
|
|
show rain water piping to site system on civil plans
|
Routing - FIRE | 5/2/2008 | 5/2/2008 | 5/9/2008 | | FAIL |
Sam Rogers
|
|
|
Faxed a copy of fire plan review notes to Architect.
|
1st review completed | | | 5/9/2008 | | FAIL |
|
|
|
Failed, PW / Planning / Plumbing /Structural / PW Drainage / PW Enviromental / Fire
|
Plan resubmittals received | | | 5/7/2008 | | |
|
|
|
received letter of transmillal from thornton, oliver, keller & "2" copies of P-1 & "2" copies of C/3.1--plans taken back to Scott Arellano-- person inserting plans is Candice Ranson from thornton oliver keller
|
Route to Impact Fee Review | 5/2/2008 | 5/7/2008 | 5/5/2008 | | PASS |
Cindy M. Gould
|
|
|
Commercial prior to 5/1 no impact fees
|
Routing - PLAN CHECK | 5/2/2008 | | 5/2/2008 | | PASS |
John Menard
|
|
|
John Menard
|
Routing - PUBLIC WORKS | 5/2/2008 | | 5/2/2008 | | FAIL |
Connie Baumgartner
|
|
|
|
Plan resubmittals requested | | | 5/2/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Plan Reviewer's activity | | | 5/2/2008 | | PASS |
|
|
|
Reviewed and approved plans with attached comment list. E-mailed a copy of the comment list to the architect for his information and records. JCM
|
Routing PW Drainage | 4/25/2008 | | 5/1/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 4/15/2008 | | 4/25/2008 | | |
John Menard
|
|
|
Took from John Menards desk to Brian Muphy's desk///4-25-08 @ 3:05pm BAS
|
Plan resubmittals received | | | 4/18/2008 | | |
John Menard
|
|
|
Received 1 cover transmittal and 2 copies of sheets A2, inserted into plans and taken back to John Menard 4-18-08 @ 3:00pm BAS
|
Routing - PLANNING | 4/14/2008 | | 4/15/2008 | | FAIL |
Josh Wilson
|
|
|
Rear elevation (west) does not match conditions of approval- contacted applicant
|
Routing - PLUMBING | 4/14/2008 | | 4/14/2008 | | FAIL |
Bill VanDegrift
|
|
|
plumbing plans do not match civil plans- waste and water. show rain water piping to site system on civil palns.
|
Routing Off Site - STRUCTURAL | 4/1/2008 | | 4/14/2008 | | FAIL |
John Menard
|
|
|
called action courier for pickup ###-#### - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - Erosion and Sediment | 4/11/2008 | | 4/14/2008 | | PASS |
James Rogers
|
|
|
ESC plan approved with attached conditions. ESC08-00225
|
Routing - PUBLIC WORKS | | | 4/11/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 4/7/2008 | | 4/11/2008 | | PASS |
Peter J. McCullough
|
|
|
Development will use existing trash enclosure, may need to increase size of receptacle to 8-yd. Access to enclosure may not be restricted during or after construction.
|
Routing PW Environmental | 4/7/2008 | | 4/7/2008 | | FAIL |
Walt Baumgartner
|
|
|
DR application contained PW condition for segregated grease line to serve tenant spaces. Applicant contacted for clarification and possible variance from condition.
|
Routing PW Sewer Rating | 4/7/2008 | | 4/7/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Sewer Design | 4/2/2008 | | 4/2/2008 | | PASS |
Jon R. Gunnerson
|
|
|
|
Routing PW Street Lights | 4/2/2008 | | 4/2/2008 | | PASS |
Bill Colson
|
|
|
|
Routing - PLANNING Land Div | 3/31/2008 | | 4/1/2008 | | PASS |
Joan Johnson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/31/2008 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/31/2008 | | |
Joan Johnson
|
|
|
|
Application received | | | 3/28/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/28/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 1/12/2009 | | 1/12/2008 | | |
John Menard
|
|
|
|
Routing PW Drainage | 4/2/2008 | | | | FAIL |
Brian Murphy
|
|
|
GEOTECH QUESTIONS O AND M QUESTIONS C-33 DETAIL SIDE WALLS. BRIAN MURPHY ###-####
|