Third Notice | | 6/9/2010 | 6/23/2010 | | DONE |
|
|
|
signed off due to final inspection passed 1 1/2 yrs ago
|
Second Notice | | 6/4/2010 | 6/4/2010 | | DONE |
|
|
|
|
First Notice | 5/17/2010 | 5/17/2010 | 5/25/2010 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/14/2010 | 5/14/2010 | 5/17/2010 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Dave Hannah
|
|
|
travis - please call 1/2 hr prior for access Phone #: ###-####
|
BLD-Conference | 11/12/2008 | 11/12/2008 | 11/13/2008 | P | CANC |
Tony Young
|
|
|
Travis- call 30 mins prior for access Phone #: ###-####
|
BLD-Final | 11/12/2008 | 11/13/2008 | 11/13/2008 | A | FAIL |
Tony Young
|
|
|
Travis- call 30 mins prior for access Phone #: ###-#### hand rails and guard rails not per plan
|
Zoning Approval | 11/7/2008 | 11/7/2008 | 11/10/2008 | | PASS |
Sue Cummings
|
|
|
|
BLD-Final | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | NR |
Dave Hannah
|
|
|
Travis- call for access Phone #: ###-#### needs code enforcement final
|
FIRE-Final Inspection | 11/6/2008 | 11/7/2008 | 11/7/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled for tomorrow.
|
BLD-Final | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | NR |
Tony Young
|
|
|
travis perry Phone #: ###-#### need f/l/s 1st,, no inspection made
|
FIRE-Final Inspection | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | FAIL |
Troy Cobbley
|
|
|
Provide address and fire extinguisher as per the approved plans and telephone discussion.
|
BLD-Final | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | NR |
Tony Young
|
|
|
travis perry Phone #: ###-#### need f/l/s 1st,, called travis
|
Inspection Record Card- Bld | | | 8/28/2008 | | DONE |
|
|
|
|
BLD-Energy code compliance | 8/7/2008 | 8/7/2008 | 8/7/2008 | P | PASS |
Tony Young
|
|
|
TRAVIS Phone #: ###-####
|
BLD-Framing/Rough-in | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PASS |
Tony Young
|
|
|
travis Phone #: ###-####
|
BLD-Framing/Rough-in | 7/30/2008 | 7/31/2008 | 7/31/2008 | A | FAIL |
Tony Young
|
|
|
travis Phone #: ###-#### c/n posted,, trus problems,, backwards?
|
BLD-Footing | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PART |
Tony Young
|
|
|
Jared Phone #: ###-#### small ftg
|
BLD-Foundation | 6/23/2008 | 6/24/2008 | 6/24/2008 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 6:13:09 PM. Contact: ###-####. ok pending special inspection report
|
BLD-Footing | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Tony Young
|
|
|
Jared Phone #: ###-####
|
(F) Reprint permit | | | 5/28/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/23/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/16/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2008 | | DONE |
|
|
|
left vm for eric anderson at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 5/16/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/14/2008 | | 5/15/2008 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 4/1/2008 | | 5/15/2008 | | PASS |
Tim L. Woodard
|
|
|
5/15/2008 13:55:53 TLW - activity updated through activity BLDA022 from case BLD08-00601.
|
Routing - Erosion and Sediment | 5/13/2008 | | 5/14/2008 | | PASS |
Steven Webb
|
|
|
approved with attached conditions; reference esc08-00230 that was issued with the grading/drainage permit
|
Routing - PUBLIC WORKS | 5/13/2008 | | 5/13/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 5/13/2008 | | 5/13/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 5/5/2008 | | 5/12/2008 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 5/2/2008 | | FAIL |
|
|
|
|
Routing - FIRE | 4/30/2008 | | 5/2/2008 | | PASS |
Scott Arellano
|
|
|
PDS fire inspector will field verify.
|
Plan resubmittals received | | | 5/2/2008 | | |
|
|
|
received letter from brs arch& letter from stapley eng (4) pages with "2" sets each----"2" sets each of S1.1, A1.1, A5.1, A5.2, & A5.3-- plans taken back to fire with Scott Arellano
|
Routing - PLAN CHECK | 4/14/2008 | | 4/29/2008 | | FAIL |
Tim L. Woodard
|
|
|
Corrections noted in plan review report.
|
Plan resubmittals received | | | 4/18/2008 | | |
Brian Murphy
|
|
|
Receiveed 1 cover transmittal addressed to Brian Murphy, 2 copies of O&M plan, 2 copies of Swift Wells treatment Facility Drainage Plan, 2 copies of calcs, 5 copies of sheet C2.0 and taken to Time Woodards desk to insert///4-18-08 @ 12:17pm BAS
|
Routing - PLANNING | 4/11/2008 | | 4/14/2008 | | PASS |
Sue Hansen
|
|
|
Cup07-00183 Sue Hansen Please see redlines on site plan.
|
Routing - PLUMBING | 4/7/2008 | | 4/11/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Drainage | 4/2/2008 | | 4/7/2008 | | FAIL |
Brian Murphy
|
|
|
3 foot speration to groundwater 100 foot seperation from well no rapid sand filter
|
Routing PW Sewer Rating | | | 4/7/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - Erosion and Sediment | 4/7/2008 | | 4/7/2008 | | FAIL |
Steven Webb
|
|
|
refer to ESC08-00230. Applicant needs to submit an ESC plan which is needed for review.
|
Routing - PUBLIC WORKS | 4/2/2008 | | 4/7/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing - PLANNING Land Div | 4/1/2008 | | 4/2/2008 | | PASS |
Todd Tucker
|
|
|
parcel is a platted lot in a subdivision.
|
Routing - Addressing | 4/2/2008 | | 4/2/2008 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/1/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/1/2008 | | |
Tisha Gallop
|
|
|
|
Pending Assignment by MYS | 3/31/2008 | | 4/1/2008 | | DONE |
John Menard
|
|
|
4/1/2008 11:33:52 JCM - activity updated through activity BLDA185 from case BLD08-00601.
|
Application received | | | 3/31/2008 | | |
Tisha Gallop
|
|
|
|