Third Notice BLD | 1/29/2009 | 1/29/2009 | 4/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/10/2008 | 1/2/2009 | | DONE |
|
|
|
|
BLD-Final | 12/10/2008 | 12/10/2008 | 12/10/2008 | A | PASS |
Jim Sly
|
|
|
OK for Perm Occ.
|
BLD-Final | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | CANC |
Jim Sly
|
|
|
Ron Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 12/10/2008 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PART |
Jim Sly
|
|
|
ron Phone #: ###-#### OK for Temp........OK for Perm when fire damper installed in cold air Ret.....Ceiling.
|
FIRE-Final Inspection | 11/26/2008 | 11/28/2008 | 11/28/2008 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
BLD-Final | 11/26/2008 | 11/28/2008 | 11/28/2008 | A | FAIL |
Jim Sly
|
|
|
ron Phone #: ###-#### Handrails and dampers
|
BLD-Framing/Rough-in | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PASS |
Jim Sly
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 10/13/2008 | 10/14/2008 | 10/14/2008 | A | CANC |
Jim Sly
|
|
|
ron Phone #: ###-####
|
BLD-Framing/Rough-in | 10/10/2008 | 10/13/2008 | 10/13/2008 | A | PART |
Jim Sly
|
|
|
ron Phone #: ###-#### OK to insulate....advised Contr....fire dampers at floor/ceiling assembly.
|
BLD-Conference | 10/7/2008 | 10/8/2008 | 10/8/2008 | A | DONE |
Jim Sly
|
|
|
kevin - please call 1/2 hr prior to inspection Phone #: ###-####
|
FIRE-Conference | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | CANC |
Troy Cobbley
|
|
|
The conference was not required on site and was taken care of over the phone.
|
BLD-Conference | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | DONE |
Jim Sly
|
|
|
Ron Phone #: ###-####
|
BLD-Other | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | CANC |
Jim Sly
|
|
|
ron - please call for access Phone #: ###-####
|
BLD-Other | 8/19/2008 | 8/19/2008 | 8/19/2008 | P | PASS |
Jim Sly
|
|
|
ron - grout - please call for access Phone #: ###-#### Non shrink grout under columns....OK
|
BLD-Other | 8/14/2008 | 8/15/2008 | 8/15/2008 | A | NR |
Jim Sly
|
|
|
Ron- welding- call for access Phone #: ###-#### Need to inspect non shrink grout under steel columns prior to placing concrete.
|
BLD-Framing/Rough-in | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PART |
Mike Jordan
|
|
|
Ron Phone #: ###-####.. verified anchor bolts in ts column base plates. Told Ron to place non shrink grout unser baseplates prior to placing remaining conc.
|
BLD-Foundation | 8/7/2008 | 8/8/2008 | 8/8/2008 | A | PART |
Mike Jordan
|
|
|
Ian Phone #: ###-####wip. Special insp. to verify reinforcement for interior column pad footings, also will do epoxy insp.
|
Issue PAID IN FULL permit | | | 7/28/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2008 | | DONE |
|
|
|
left vm for elizabeth cooper at ###-#### x 4 - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 7/25/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/3/2008 | | 7/24/2008 | | PASS |
Carl Westfall
|
|
|
7/24/2008 16:09:25 CJW - activity updated through activity BLDA022 from case BLD08-00622.
|
Routing - PLAN CHECK | 5/12/2008 | | 7/24/2008 | | PASS |
Carl Westfall
|
|
|
(6-3-08) Completed the resubmittal review. Plans failed. E-mailed list of items that need to be resolved. Drawings on hold at the desk of Carl J. Westfall. (7-24-08) After 2nd resubmittal review, drawings approved with "red lines".
|
Routing - PUBLIC WORKS | 7/24/2008 | | 7/24/2008 | | DONE |
Louise Waldorf
|
|
|
Additional plumbing fixtures.
|
Routing - PLAN CHECK | 7/24/2008 | | 7/24/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/21/2008 | | |
Carl Westfall
|
|
|
Received response letter and two coipes of sheets A1.0, A1.1, A2.0, A3.0, S1.0, S2.0, S3.0, S4.0, S5.0, H1.0, P1.0, P1.1; taken to Carl Westfall
|
Plan resubmittals received | | | 5/21/2008 | | |
|
|
|
Received response letter and two copies of sheets A0.0, 1.0, A1.1, A2.0, A2.1, A3.0, P1.0, P1.1, H1.0; taken to Carl Westfall
|
Routing - FIRE | 5/7/2008 | 5/7/2008 | 5/12/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/12/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 5/8/2008 | 5/13/2008 | 5/9/2008 | | PASS |
Cindy M. Gould
|
|
|
Commercial permit received prior to 5/1
|
Routing - PLAN CHECK | 4/7/2008 | | 5/7/2008 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on May 6, 2008 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 4/4/2008 | | 4/7/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH04-00230, DRH05-00028, and DRH07-00002.
|
Routing - PUBLIC WORKS | 4/3/2008 | | 4/4/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 4/4/2008 | | 4/4/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00234.
|
Routing PW Sewer Rating | 4/4/2008 | | 4/4/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 4/2/2008 | | 4/3/2008 | | DONE |
Marlene Southard
|
|
|
4/3/2008 10:04:15 MYS - activity updated through activity BLDA172 from case BLD08-00622.
|
Routing - PLANNING Land Div | 4/3/2008 | | 4/3/2008 | | PASS |
Dave Abo
|
|
|
Units 18 and 19 combined per Section 27.2 of Steelwood Flex Condominium Declarations.
|
Plans ACCEPTED BY PLAN TECH | | | 4/2/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/2/2008 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 4/1/2008 | | |
Tisha Gallop
|
|
|
|