Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00633
StatusFinaled
Name WELLMAN CONSTRUCTION
Site Address 8137 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
(chillberry changed to "COLD FUZION FROZEN YOGURT" - SHOPKO PLAZA) To construct a 1,000 sq.ft. frozen yogurt shop with seating within a portion of new shell building (BLD07-02145) per approved plans. Work includes construction of a 2-hour fire barrier wall on the east side perimeter of this space. There is an existing 2-hour fire barrier wall located as the west wall of this tenant space. To construct interior walls to create two accessible restrooms, prep kitchen, service area, dining area and accessible route to all areas; installation of a suspended ceiling grid system, interior finishes; accessible counters, doors, clear floor space, door hardware & drinking fountains; and electrical, mechanical and plumbing work. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/3/20108/16/2010 DONE
signed off due to final inspection passed over 2 yrs ago
Second Notice 7/25/20107/29/2010 DONE
First Notice7/6/20107/6/20107/15/2010 DONE
DetailsMike Jordan
BLD-Aging Inspection7/2/20107/2/20107/6/2010 CANC
DetailsMike Jordan
DOC - Permit Finaled7/6/20107/6/20107/6/2010PPASS
DetailsMike Jordan
All inspections were passed, ok for perm occ. Owner needs to pick up occupancy at city hall.
BLD-Final6/19/20086/20/20086/20/2008APASS
DetailsJim Sly
jim - first thing in the morning please Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection6/19/20086/20/20086/20/2008APASS
DetailsTroy Cobbley
fire life passed
BLD-Framing/Rough-in6/19/20086/19/20086/19/2008PPASS
DetailsJim Sly
Jim- ceiling grid Phone #: ###-####
FIRE-Final Inspection6/19/20086/19/20086/19/2008PFAIL
DetailsTroy Cobbley
Mount and tage the fire extinguishers and repair the exit discharge light at the rear exit.
Telephone call  6/19/2008 DONE
Phone call from Troy Cobbley saying the sign on tenant space / building business name has been changed to COLD FUZION FROZEN YOGURT.
BLD-Wall cover5/30/20085/30/20085/30/2008PPART
DetailsMike Jordan
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Nailing on 2hr. firewall.
BLD-Framing/Rough-in5/28/20085/28/20085/29/2008APART
DetailsMike Jordan
Interior framed walls and 2hr. firewalls. Noted issues with aproach clearances to mens restroom. Contractor to call architect for solution.
BLD-Framing/Rough-in5/28/20085/28/20085/28/2008PCANC
DetailsMike Jordan
jim Phone #: ###-####
Issue PAID IN FULL permit  5/6/2008 DONE
Routing - PLAN CHECK5/2/2008 5/2/2008 PASS
DetailsDan Stuart
Added resubmittals of 5/1/08 to original plans. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  5/2/2008 PASS
Print Occupancy Form  5/2/2008 DONE
Telephone call  5/2/2008 DONE
t/c w chad slichter at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  5/2/2008 DONE
Plan assigned to (DRS)4/14/2008 5/2/2008 PASS
DetailsDan Stuart
5/2/2008 09:35:00 DRS - activity updated through activity BLDA022 from case BLD08-00633.
Routing - Erosion and Sediment5/1/2008 5/2/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00239
Route to Impact Fee Review4/29/20085/2/20085/1/2008 PASS
DetailsCindy M. Gould
Routing - FIRE4/28/20084/28/20085/1/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/1/2008 FAIL
Failed Plan Check
Routing - PLAN CHECK5/1/2008 5/1/2008 FAIL
DetailsDan Stuart
Routing to ESC for review. Resubmittals of 4/30/08 were not correct for the drinking fountain accessibility requirments. Call to architect to discuss. Left message to call me back. E-mailed copy of plan review with remaining item #1 needing to be corrected. Provided additional info on review.
Plan resubmittals requested  5/1/2008 FAIL
Copy of remaining item #1 needing to be corrected on drinking fountains (two required - standing and whell chair front approach). Also talked with Jeff on phone.
Telephone call  5/1/2008 DONE
Call to Jeff Geiber, slichter Arch to discuss requirements for drinking fountains and resubmittal requirments.
Plan resubmittals received  5/1/2008  
received transmittal from slichter arch & letter..Also "2" sheets each of A2.1, & Pl.1-- plans taken to Dan Stuart
Plan resubmittals received  4/30/2008  
DetailsDan Stuart
Received 1 cover transmittal, 1 response letter dated 4-29-08, 2 copies of A5.1, A7.1, A7.2, A8.1and taken to Dan Stuart 4-30-08 @ 11:09am BAS
Routing - PLAN CHECK4/17/2008 4/28/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to architect. routing plans to fire code analyst then ESC for review.
Routing - PLUMBING4/16/2008 4/17/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS4/14/2008 4/16/2008 PASS
DetailsBeverly Hall
Routing PW Environmental4/14/2008 4/15/2008 PASS
DetailsWalt Baumgartner
kitchen prep area wastewater all routes to grease line put in under shell and core. Gandolfo's NY deli on same GI.
Pending Assignment by MYS4/2/2008 4/14/2008 DONE
DetailsMarlene Southard
4/14/2008 11:20:15 MYS - activity updated through activity BLDA168 from case BLD08-00633.
Routing PW Sewer Rating4/14/2008 4/14/2008 PASS
DetailsLouise Waldorf
Plans ACCEPTED BY PLAN TECH  4/3/2008  
Application received  4/2/2008  
Recd Pcfee & Taken To Pln CK  4/2/2008 DONE