Permit Information
Permit NumberBLD08-00643
StatusFinaled
Name CBH
Site Address 1095 N DOVE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a 1642 sq. ft. new two story single family dwelling. The main floor is 600 sq. ft. with one bathroom and an attached garage of 484 sq. ft. The second story is 1042 sq. ft. with three bedrooms and two bathrooms. There is a covered front porch of 32 sq. ft. THE PERMIT HOLDER is responsible to comply with R602.10 for wall bracing or comply with an engineered design. Built per all approved plans, red lining and plan review report. R-1C zoning district and building setbacks per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/17/20086/18/20086/18/2008PPASS
DetailsJim Sly
Ray Phone #: ###-####
C/C issued
DOC - Permit Finaled6/18/20086/18/20086/18/2008PPASS
DetailsJim Sly
BLD-Energy code compliance5/27/20085/28/20085/28/2008APASS
DetailsMike Jordan
corey Phone #: ###-####
BLD-Framing/Rough-in5/23/20085/27/20085/27/2008APASS
DetailsMike Jordan
ray Phone #: ###-####. All issues were resolved. ok to insul.
BLD-Framing/Rough-in5/22/20085/22/20085/22/2008PFAIL
DetailsJim Storey
jay Phone #: ###-####TABLE R602.3(5)
SIZE, HEIGHT AND SPACING OF WOOD STUDSa

STUD SIZE
(inches) BEARING WALLS NONBEARING WALLS
Laterally unsupported stud heighta
(feet) Maximum spacing when supporting roof and ceiling only
(inches) Maximum spacing when supporting one floor, roof and ceiling
(inches) Maximum spacing when supporting two floors, roof and ceiling
(inches) Maximum spacing when supporting one floor only
(inches) Laterally unsupported stud heighta
(feet) Maximum spacing
(inches)
2 × 3b — — — — — 10 16
2 × 4 10 24 16 — 24 14 24
3 × 4 10 24 24 16 24 14 24
2 × 5 10 24 24 — 24 16 24
2 × 6 10 24 24 16 24 20 24
max stud spacing 24 on 2x6/ 16 on 2x4

floor hanger hangers over nailled justify.
BLD-Foundation5/8/20085/8/20085/8/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/8/2008 at 7:49:38 AM. Contact: ###-####.
BLD-Footing5/7/20085/7/20085/7/2008PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/7/2008 at 10:28:20 AM. Contact: ###-####.
Issue PAID IN FULL permit  5/2/2008 DONE
Inspection Record Card- Bld  4/14/2008 DONE
Telephone call  4/14/2008 DONE
left message w christine for carrie hammett at ###-#### - permit ready and fees given
Permit Ready to Issue  4/14/2008 DONE
Plan assigned to (BSP)4/10/20084/10/20084/11/2008 PASS
DetailsBen S. Pavelka
4/11/2008 10:41:11 BSP - activity updated through activity BLDA022 from case BLD08-00643.
Case Summary (BLD)  4/11/2008  
PLANS/APPL TAKEN TO FRONT DESK  4/11/2008  
Routing - PLAN CHECK4/4/2008 4/11/2008 PASS
DetailsBen S. Pavelka
Plans ACCEPTED BY PLAN CHECK  4/10/2008 DONE
DetailsBen S. Pavelka
Routing - PLANNING4/3/2008 4/4/2008 PASS
DetailsColleen T Carroll
Routing - PUBLIC WORKS4/4/2008 4/4/2008 PASS
DetailsLouise Waldorf
Application received  4/3/2008  
DetailsTisha Gallop
Routing - Addressing4/3/2008 4/3/2008 PASS
DetailsChris Pichardo