Third Notice | | 7/24/2009 | 8/17/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/6/2009 | 3/6/2009 | 7/24/2009 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/24/2009 | 3/6/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/24/2009 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Forrest France
|
|
|
Inspection passed per activity notes 7/16/08, fire life safety finaled.
|
Case Summary (BLD) | | | 12/22/2008 | | |
|
|
|
|
BLD-Final | 7/15/2008 | 7/16/2008 | 7/16/2008 | P | PASS |
Dave Hannah
|
|
|
rick - as early as possible please Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 7/15/2008 | 7/16/2008 | 7/16/2008 | A | PASS |
Forrest France
|
|
|
All items on the correction notice verified for compliance, project related fire alarm and sprinkler work is finished, fire life safety finaled.
|
BLD-Final | 7/14/2008 | 7/15/2008 | 7/15/2008 | P | NR |
Dave Hannah
|
|
|
rick Phone #: ###-####
|
FIRE-Final Inspection | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | FAIL |
Forrest France
|
|
|
Need project related fire alarm work requested for field inspection/approval prior to building life safety final, all items on C/N must be completed.
|
BLD-Final | 7/7/2008 | 7/8/2008 | 7/8/2008 | P | NR |
Dave Hannah
|
|
|
Rick Phone #: ###-#### needs other trades to final first
|
FIRE-Final Inspection | 7/7/2008 | 7/8/2008 | 7/8/2008 | A | FAIL |
Forrest France
|
|
|
Missing two exit signs as shown on stamped plan set, provide and post one fire extinguisher with a current certification tag, noted one storage room lacking proper fire sprinkler coverage, tenant expansion into the adjacent space will require extension of the building fire alarm system to maintain proper notification coverage-see details pertaining to fire alarm and sprinkler permits on the approved plan set fire code review notes.
|
BLD-Framing/Rough-in | 6/4/2008 | 6/5/2008 | 6/5/2008 | A | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok to cover store front
|
Plan assigned to (R_H) | 4/10/2008 | | 5/15/2008 | | PASS |
Ron Hill
|
|
|
5/15/2008 06:44:48 RMH - activity updated through activity BLDA022 from case BLD08-00658.
|
Routing - PLAN CHECK | 5/7/2008 | | 5/15/2008 | | PASS |
Ron Hill
|
|
|
|
1st review completed | | | 5/15/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/15/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2008 | | DONE |
|
|
|
left message w kay for andrew erstad at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/15/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2008 | | DONE |
|
|
|
|
Routing - FIRE | 5/1/2008 | | 5/7/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire plan review notes.
|
Plan resubmittals received | | | 5/2/2008 | | DONE |
|
|
|
received 1 transmittal, and 3 copies of sheets A0.01,A2.01,A2.11,A2.30,A6.10 taken to Ron H.
|
Case Summary (BLD) | | | 5/1/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/1/2008 | | 5/1/2008 | | FAIL |
Ron Hill
|
|
|
faxed report to architect
|
Plan resubmittals received | | | 4/23/2008 | | |
|
|
|
received transmittal from erstad arch & "2" sheets each of a2.11-- plans taken to Ron Hill
|
Pending Assignment by MYS | 4/4/2008 | | 4/10/2008 | | DONE |
Ron Hill
|
|
|
4/10/2008 07:00:39 RMH - activity updated through activity BLDA175 from case BLD08-00658.
|
Plans ACCEPTED BY PLAN TECH | | | 4/7/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2008 | | |
|
|
|
|
Application received | | | 4/4/2008 | | |
|
|
|
|