Case Summary (BLD) | | | 3/16/2011 | | |
|
|
|
|
Third Notice | | 7/24/2009 | 8/17/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/6/2009 | 3/6/2009 | 7/24/2009 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/24/2009 | 3/6/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/24/2009 | | |
Barbara Stitt
|
|
|
|
BLD-Final | 2/20/2009 | 2/23/2009 | 2/23/2009 | A | PASS |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PASS |
Forrest France
|
|
|
Noted correction items verified for compliance, fire life safety passed.
|
Case Summary (BLD) | | | 12/22/2008 | | |
|
|
|
|
BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Dave Hannah
|
|
|
Rick Phone #: ###-#### ok for temp needs to change door on upper level
|
FIRE-Final Inspection | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PART |
Forrest France
|
|
|
Fire life safety final pending door hardware at the main level second exit door and extension of the existing building fire alarm system to include notification throughout the tenant space.
|
BLD-Final | 7/2/2008 | 7/3/2008 | 7/3/2008 | P | NR |
Dave Hannah
|
|
|
Rick Phone #: ###-#### needs fire finals
|
FIRE-Final Inspection | 7/2/2008 | 7/3/2008 | 7/3/2008 | A | FAIL |
Forrest France
|
|
|
Noted project related fire sprinkler permit has not been issued and must be approved and finaled prior to building life safety final, noted heads improperly spaced above the new stairway. Reviewed additional items with the contractor including where to post two required fire extinguishers, door hardware at the second exit main level, EM lights and exit signs tested okay, stairway handrails under repair.
|
BLD-Final | 7/1/2008 | 7/2/2008 | 7/3/2008 | P | FAIL |
Dave Hannah
|
|
|
rick Note: please inspect before 3:30 Phone #: ###-#### needs all of fires finals walked project with contractor made him apunch list
|
BLD-Framing/Rough-in | 6/3/2008 | 6/3/2008 | 6/4/2008 | P | PART |
Dave Hannah
|
|
|
rick Phone #: ###-#### ok to cover store fronts
|
Plan assigned to (R_H) | 4/10/2008 | | 5/15/2008 | | PASS |
Ron Hill
|
|
|
5/15/2008 07:52:59 RMH - activity updated through activity BLDA022 from case BLD08-00659.
|
Routing - PLAN CHECK | 5/8/2008 | | 5/15/2008 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 5/15/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/15/2008 | | DONE |
|
|
|
|
1st review completed | | | 5/15/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/15/2008 | | DONE |
|
|
|
left message w kay for andrew erstad at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/15/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/15/2008 | | DONE |
|
|
|
|
Routing - FIRE | 5/2/2008 | | 5/8/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire plan review notes.
|
Plan resubmittals received | | | 5/7/2008 | | DONE |
|
|
|
received 1 transmittal,and 3 copies of sheets A0.01,A2.10,A2.11,A6.10 taken to Ron H.
|
Case Summary (BLD) | | | 5/2/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/4/2008 | | 5/2/2008 | | FAIL |
Ron Hill
|
|
|
Emailed corrections to Tegan
|
Plan resubmittals received | | | 4/24/2008 | | |
Ron Hill
|
|
|
Received 1 cover transmittal, 2 copies structureal calculations, 2 copies of sheets A0.01, A2.00, A2.01, A2.10, A2.11, A6.10 and taken to Ron Hill///4-24-08 @ 4:55pm BAS
|
Pending Assignment by MYS | 4/4/2008 | | 4/10/2008 | | DONE |
Ron Hill
|
|
|
4/10/2008 07:01:02 RMH - activity updated through activity BLDA175 from case BLD08-00659.
|
Plans ACCEPTED BY PLAN TECH | | | 4/7/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2008 | | |
|
|
|
|
Application received | | | 4/4/2008 | | |
|
|
|
|