Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-00698
StatusFinaled
Name CCI CONSTRUCTION INC
Site Address 10681 W MCMILLAN RD
Project NameSpring Creek Boise Senior Livi
Customer Number 
ePlanReviewNo
Description
("SPRING CREEK BOISE" Senior Assisted Living) -This building is fully sprinklered for allowable area increase and occupancy use group. To construct a 16,311 sq. ft., Type VA construction, one story Assisted residential living facility building with 29 sleeping units with common associated use dining, kitchen, living room, salon, mechanical & accessible common use restroom / powder room support areas; construct a 1-hour fire-resistive rated exit corridor to serve all areas of the building, with fire rated protection of penetrations and self-closing, "S" label smoke/fire doors for opening protection; electrical, mechanical, plumbing, sprinkler and alarm installation; a minimum of 2 fully Accessible Units and all others complying as Type 'B' accessible units or better. All per approved plans to include red-line notes and all attached plan reviews of all reviewing agencies. DRH07-00476 CUP07-00175 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  9/13/2016 DONE
Case Summary (BLD)  6/29/2010 DONE
Third Notice BLD1/29/20091/29/20091/30/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/2/20081/2/2009 DONE
First Notice 12/2/20081/2/2009 DONE
BLD-Final12/1/200812/2/200812/2/2008APASS
DetailsJim Sly
cory Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy UNPAID FEE  12/2/2008  
FIRE-Final Inspection12/1/200812/1/200812/1/2008PPASS
DetailsTroy Cobbley
Life safety passed.
Zoning Approval12/1/200812/1/200812/1/2008 PASS
DetailsAndrea Tuning
FIRE-Final Inspection11/25/200811/26/200811/26/2008AFAIL
DetailsTroy Cobbley
See the correction notice for the items needing addressed which include providing the city approved drawings for a complete inspection, repair the exit signs, provide emergency lighting in the common areas as discussed, provide missing exit sign/emergency light from the dining area, mount fire extinguishers, complete the one hour fire sprinkler riser room, provide hardware on the exterior gate on the west side of building, provide 911 sticker for the fire sprinkler alarm bell
BLD-Final11/25/200811/26/200811/26/2008PNR
DetailsJim Sly
Corey Phone #: ###-####
BLD-Final10/28/200810/28/200810/28/2008PNR
DetailsJim Sly
Herb .... WIP
BLD-Conference9/24/20089/24/20089/24/2008PDONE
DetailsJim Sly
Doug- call 30 mins prior to going Phone #: ###-####
BLD-Energy code compliance9/12/20089/12/20089/12/2008PPASS
DetailsJim Sly
corey Phone #: ###-####
BLD-Energy code compliance9/11/20089/12/20089/12/2008ANR
DetailsJim Sly
COREY Phone #: ###-####
BLD-Energy code compliance9/10/20089/11/20089/11/2008PNR
DetailsJim Sly
Corey Phone #: ###-####
BLD-Framing/Rough-in9/8/20089/8/20089/8/2008PPART
DetailsJim Sly
cory Phone #: ###-####
Need to complete firestopping. OK to insulate.
BLD-Framing/Rough-in9/2/20089/3/20089/3/2008PNR
DetailsJim Sly
corey Phone #: ###-####
BLD-Conference8/27/20088/28/20088/28/2008ADONE
DetailsJim Sly
corey Phone #: ###-####
BLD-Framing/Rough-in8/26/20088/27/20088/27/2008PNR
DetailsJim Sly
Cory Phone #: ###-#### Walk thru with Contractor....... Subs not approved for Rough Ins.
BLD-Framing/Rough-in7/31/20088/1/20088/1/2008APART
DetailsJim Sly
cory- shear Phone #: ###-####
Shear nailing ok
BLD-Framing/Rough-in7/25/20087/28/20087/28/2008APART
DetailsJim Sly
Corey Phone #: ###-####
Met Corey.....Went through plans and details...
Additional plans submitted  6/9/2008 DONE
Architect brought in two new copies of structural plan Sheets S1.0A & SD2.0. Dimensions at front canopy were updated to match the architectural plan sheets - See A1.1 - and the depth of footing at column and foundation perimeter to 30". Plans inserted into office copy and set of plan to Jim Sly, Structural Inspector to deliver to job site for field copy.
Plan Reviewer's activity  6/9/2008 DONE
E-mail to Jim Sly teelling him of two structural plan sheets needing delivered to job site for this project.
BLD-Foundation6/5/20086/6/20086/6/2008APASS
DetailsJim Sly
corey - early as possible please Phone #: ###-####
BLD-Footing5/30/20086/2/20086/2/2008APASS
DetailsJim Sly
brian -early am if possible Phone #: ###-####
2500 psi design......OK
Plan resubmittals received  6/2/2008  
DetailsDan Stuart
Received transmittal and three copies of sheet S1.0A, SD2.0; taken to Dan Stuart
(F) Reprint permit  6/2/2008  
Route to Impact Fee Review5/21/20085/27/20085/30/2008 PASS
DetailsCindy M. Gould
Override - People Holds  5/30/2008  
Issue PAID IN FULL permit  5/30/2008 DONE
(F) Reprint permit  5/30/2008  
Routing - PLAN CHECK5/27/2008 5/28/2008 PASS
DetailsMarlene Southard
PLANS/APPL TAKEN TO FRONT DESK  5/28/2008 DONE
DetailsDan Stuart
Print Occupancy Form  5/28/2008 DONE
Plan assigned to (DRS)4/10/2008 5/28/2008 PASS
DetailsDan Stuart
5/28/2008 07:49:57 MYS - activity updated through activity BLDA022 from case BLD08-00698.
Routing - PLANNING5/23/2008 5/27/2008 PASS
DetailsAndrea Tuning
Approved per DRH07-00476
Routing - FIRE5/27/2008 5/27/2008 PASS
DetailsScott Arellano
See fire plan review notes.
Plan Reviewer's activity  5/23/2008 DONE
Copy of final plan review conditions e-mailed to Bob Hess.
Print Pending Permit.LaserJet4  5/23/2008  
Routing Off Site - STRUCTURAL5/21/2008 5/23/2008 PASS
DetailsDan Stuart
Received e-mail from third party structural engineer approving structural resubmittals for final review approval.
Routing - PLAN CHECK5/13/2008 5/23/2008 PEND
DetailsDan Stuart
No resubmittals required. Approved as red-lined on plans and attached plan review clarifications. Reviewed items ofr smoke detectors at ceiling not shown in certain areas and verticle grab bars in accessible units with Bob Hess on phone. Routing to Planning & Fire for re-review.
Plan resubmittals received  5/22/2008  
Received three copies of sheets P0.0A, P0.2A, P1.0A, P1.1A, P1.2A, P1.3A, P1.4A, P1.5A, M0.0A, M1.0A, M1.1A, 0, SP1.0, SP3.0, A1.0A, A1.1A, A1.2A, A4.1A, A5.0A, A5.1A, A5.2A, A6.0A, A7.0A, A7.1A, A7.2A, A8.0A, E1.1A, E2.1A, E3.1A, E5.1A; inserted into plans by arch. and taken back to Dan Stuart
Telephone call  5/21/2008 DONE
DetailsTisha Gallop
called Action Couriers for pick up of resubmittals
Plan resubmittals received  5/21/2008 DONE
Received (3) copies of structural engineering calcs and Sheets S2.0A, SD1.0, SD3.0 and SD4.0. Routing one set of plans and calcs for re-review by third party contract engineering firm.
Meeting  5/19/2008 DONE
Reviewed items of plan review for resubmittal requirements with Bob Hess, architect and Doug Clegg, Owner.
Routing - FIRE5/6/20085/6/20085/13/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  5/13/2008 FAIL
Failed PW, Plan Check, Fire
Plan resubmittals requested  5/7/2008 DONE
Copy of third party structural engineering review items needing to be addressed for this project were received on 5/6/08 and a copy e-mailed to Bob Hess for response.
Plan resubmittals requested  5/6/2008 DONE
E-mail to architect for review & response.
Routing Off Site - STRUCTURAL5/1/2008 5/6/2008 FAIL
DetailsDan Stuart
Called Action Courier for pick up-5-1-08 @ 11:00am BAS.
Outside engineering review of resubmittals of 4/30/08 had items still needing to be addressed. Copy of outside engineering review report e-mailed to Bob Hess for response.
Routing - PLAN CHECK5/1/2008 5/6/2008 FAIL
DetailsDan Stuart
Resubmittals required. Plans to fire code analyst for review. Copy of plan review e-mailed to architect.
Plan resubmittals received  5/2/2008  
Received transmittals, waste main loading calc sheet, letter from Landscape Architecture and four copies of sheets L1.0, L-1.1, L-1.2, L-1.3, P1.0A, P1.6A; inserted by architect
Routing - PUBLIC WORKS4/30/2008 5/1/2008 PASS
DetailsBeverly Hall
Routing PW Solid Waste4/30/2008 5/1/2008 PASS
DetailsPeter J. McCullough
Plan resubmittals received  5/1/2008  
Recevied 1 cover transmittal, 3 copies of response to Structural Plan check, 3 copies of sheets S1.0A, S2.0A, SD2.0, SD4.0
Telephone call  4/29/2008 DONE
Call from Bob Hess to review who has seen plans, who has failed plans and when I will look at them. He had downloaded the data on website but wasn't sure how to read.
Routing - PLANNING4/28/2008 4/29/2008 PASS
DetailsJoshua Johnson
Routed to Dan Stuart
Routing - PLUMBING4/21/2008 4/28/2008 PASS
DetailsBill VanDegrift
vent grease interceptor to nearest wall. 4" building drain is undersized, increase to 6" for the first 44 fixture units, through room 125.
Routing - PLANNING4/28/2008 4/28/2008 FAIL
DetailsAndrea Tuning
Failed. The submitted landscpae plan does not match the landscape plan that was approved with DRH07-00476. The applicnat was notified by fax on 4-28-08 -Andrea Tuning
Routing Off Site - STRUCTURAL4/11/2008 4/24/2008 FAIL
DetailsBethany Sullins
Called Action Courier for pick up 4-11-08 @ 8:33am BAS
4/24/08 - Hardcopy of structural engineering report by 3rd party engineer received. Copy of report requiring resubmittals e-mailed to Bob Hess, architect.
Plan resubmittals requested  4/23/2008 DONE
Copy of e-mailed 3rd party structural engineering report attached to e-mail to Bob Hess. Resubmittals are required.
Routing - Erosion and Sediment4/18/2008 4/21/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. Need certified rp priro to issuance of permit. ESC08-00267.
Routing PW Sewer Rating4/17/2008 4/18/2008 PASS
DetailsLouise Waldorf
Routing PW Solid Waste  4/18/2008 FAIL
DetailsPeter J. McCullough
Solid waste enclosure is not the minimum dimensions (12x10, ID). Contact Peter McCullough, ###-####.
Plan resubmittals received  4/18/2008  
Received 1 cover transmittal, 4 copies of sheet SP1.0 and taken and added to plans 4-18-08 @ 12:52pm BAS
Plan resubmittals received  4/18/2008  
received from erickson civil incorporated transmittal letter & sheets each of C4.1-- plans taken to Brian Murphy
Routing - PUBLIC WORKS4/11/2008 4/18/2008 FAIL
DetailsLouise Waldorf
Routing PW Drainage4/16/2008 4/17/2008 PASS
DetailsBrian Murphy
Routing PW Street Lights4/14/2008 4/15/2008 PASS
DetailsBill Colson
Routing PW Sewer Design4/11/2008 4/14/2008 PASS
DetailsJon R. Gunnerson
Routing - PLANNING Land Div4/11/2008 4/11/2008 PASS
DetailsJoan Johnson
ROS07-70
Plan routing begun/NEW & ADDTN  4/11/2008 DONE
Recd Pcfee & Taken To Pln CK  4/9/2008 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  4/9/2008 DONE
DetailsBethany Sullins
Application received  4/9/2008  
Third Notice BLD1/29/20091/29/2009   
Second Notice has not been responded to.