Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00712
StatusFinaled
Name WENSEL CONSTRUCTION
Site Address 1223 W JEFFERSON ST
Project NameBOISE PLAZA PARKING GARAGE
Customer Number 
ePlanReviewNo
Description
BOISE PLAZA PARKING GARAGE-Phase 3- To construct a new 276,775 square foot, eight tier, open parking garage with 946 parking spaces. This permit also includes related site improvements. The footings, foundation and underground utilities for this parking structure are being constructed under building permit BLD08-00474. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  5/21/2010  
Case Summary (BLD)  5/21/2010  
Second Notice 7/23/20098/14/2009 DONE
First Notice 4/30/20097/23/2009 DONE
BLD-Final4/30/20094/30/20094/30/2009PPASS
DetailsTony Young
Curt Phone #: ###-####,, rewalk job
final ok now
BLD-Conference4/29/20094/30/20094/30/2009APASS
DetailsTony Young
Curt Phone #: ###-####,, rewalk job
BLD-Conference4/28/20094/29/20094/30/2009PPASS
DetailsTony Young
Curt Phone #: ###-####
?s on final
Permanent Occupancy  4/30/2009 DONE
DetailsTisha Gallop
Zoning Approval4/28/20094/28/20094/29/2009 PASS
DetailsJosh Wilson
OK for permanent occupancy- all construction per DRH08-00008
BLD-Final4/27/20094/28/20094/28/2009APART
DetailsTony Young
curt Phone #: ###-####
temp occupancy ok for the lower 3 levels only,, c/n on upper levels include landing areas greater than 4" openings on n/e corner tower,, ,, guardrails on n/west corner tower section over 4",, handrail into door landing area n/w main level,, section of parapets on west and south of 3rd and 4th lower than 42",, upper level parapets / guardrails more than 4" openings at steel joints w/in 42"
FIRE-Final Inspection4/24/20094/27/20094/27/2009PPASS
DetailsForrest France
Fire life safety inspection passed. NOTE: Elevator recall functions are car and hoistway specific- fire alarm system initiating and notification has not been required, therefore no fire alarm permit work is project attatched, notification devices at the elevator lobbys have been removed to meet these parameters.
FIRE-Conference4/22/20094/22/20094/22/2009PDONE
DetailsForrest France
Regarding fire life safety requirements for project final.
Plan Reviewer's activity  4/2/2009 PASS
DetailsJohn Menard
Reviewed and approved new first level parking layout. The revised layout rearranges some of the handicapped parking space locations. There is no reduction in standard or handicapped spaces. I also discussed the layout with Josh Wilson and he indicated that he had no problem with it. (Plan Sheet A-201) JCM
BLD-Conference3/19/20093/19/20093/19/2009PPART
DetailsTony Young
Curt Phone #: ###-####
?s on final
BLD-Conference3/18/20093/19/20093/19/2009APART
DetailsTony Young
Curt Phone #: ###-####
?s on final,, may want to get temp occ for the 1st two floors.. need all required sign offs,, need a letter of final ok on all structural elements from the structural engineer of record,, need hand rail and guard rails per code..
Inspection Record Card- Bld  3/13/2009 DONE
DetailsAlexandra L. DeYoung
Plan resubmittals requested  2/6/2009 DONE
DetailsJohn Menard
E-mailed the architect requesting copies of the stairway handrail structural plans and details. JCM
FIRE-Conference2/2/20092/2/20092/3/2009PDONE
DetailsForrest France
Regarding seismic clearance for vertical standpipe runs.
Plan resubmittals received  1/26/2009 DONE
received 1 letter of transmittal, and 2 copies of stair calcs taken to John M.
Plan resubmittals requested  1/20/2009 DONE
DetailsJohn Menard
E-mailed the architect requesting copies of the stairway structural calculations. JCM
BLD-Conference12/10/200812/11/200812/11/2008APASS
DetailsTony Young
kirt Phone #: ###-####
need to make wall min 42"
BLD-Conference12/8/200812/9/200812/10/2008APART
DetailsTony Young
kirt Phone #: ###-####
research,, called plan reviewer
BLD-Conference12/8/200812/8/200812/9/2008PPART
DetailsTony Young
kirt Phone #: ###-####
need to research wall height
BLD-Conference12/5/200812/8/200812/8/2008ACANC
DetailsTony Young
kirt Phone #: ###-####
Plan Reviewer's activity  11/14/2008 PASS
DetailsJohn Menard
Reviewed and approved structural calcs, window details, and revised plans sheets for the store front window glazing. JCM
Plan resubmittals received  11/13/2008  
received 1 transmittal, and 3 copies of sheets A-601,A-602,A-603,A-901 this permit was issued 6-17-08 taken to John M.
Plan resubmittals received  11/13/2008  
received letter of transmittal from zga arch & "2" copies of custom glass inc automatic entrances of idaho & "2" copies of calcs from LW engineering p c.--took plans to John Menard
Plan resubmittals received  10/28/2008  
DetailsBarbara Stitt
1 copy of sheets G-002, A-601, A-602, A-603, A-901, page with NE tower section (A & B) all stamped but not signed, 1 copy of letter to Jason Blais dated 10-27-08 from Thomas Zabala (2 pages), 1 copy of 2006 IBC 1007.3 (5 pgs), 1 copy of 2006 IBC 1012 (9 pgs), 1 copy of 2006 IBC 1607.7 (2 pgs), 1 copy of 2006 IBC 2405.5.1 (12 pgs) taken to Jason Blais 10-28-08 @ 10:00am BAS
BLD-Conference10/15/200810/16/200810/16/2008APART
DetailsTony Young
justin - please call 1/2 prior to inspection Phone #: ###-####
on site conf on guardrails,, w/ architect,, need to meet intent of code for designs
BLD-Footing6/23/20086/24/20086/24/2008APART
DetailsTony Young
Justin- concrete at 11 Phone #: ###-####
talked w/ strata guys,, ok on front/north ftg pads columns
BLD-Footing6/20/20086/23/20086/23/2008APART
DetailsTony Young
Justin- laying concrete at 11 Phone #: ###-####
pending S. ?I. report
(F) Reprint permit  6/19/2008  
Issue PAID IN FULL permit  6/17/2008 DONE
Telephone call  6/13/2008 DONE
DetailsPatricia Smith
t/c w tom zabala at ###-#### - permit ready and fees given
Permit Ready to Issue  6/13/2008 DONE
Details
Plan assigned to (JCM)4/11/20084/11/20086/12/2008 PASS
DetailsJohn Menard
6/12/2008 15:09:19 JCM - activity updated through activity BLDA022 from case BLD08-00712.
Routing - FIRE6/10/2008 6/12/2008 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK6/12/2008 6/12/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  6/12/2008 DONE
DetailsJohn Menard
Print Occupancy Form  6/12/2008 DONE
Routing Off Site - STRUCTURAL6/10/2008 6/12/2008 PASS
DetailsJohn Menard
Sent one copy of response letter and one set of updated structural calculations. - Received letter from consulting structural engineer approving pre-cast concrete resubmittals. JCM
Plan Reviewer's activity  6/10/2008 PASS
DetailsJohn Menard
Reviewed and approved nonstructural revisions. JCM
Routing - PLAN CHECK5/22/2008 6/10/2008 PASS
DetailsJohn Menard
Plan resubmittals received  6/9/2008 DONE
Received 1 transmittal letter,3 letters,3 calcs, 2 copies of sheet A-901,4 copies of sheet A-201, and 2 copies of sheets G-002,A-202,A-203,A-204,M1.1 inserted by Thomas Zabala from ZGA Architects
Plan resubmittals requested  5/27/2008 DONE
E-mailed the architect a copy of structural review for the pre-cast concrete requesting revisions. JCM
Routing Off Site - STRUCTURAL5/9/2008 5/27/2008 FAIL
DetailsJohn Menard
called action courier for pickup - Deferred submittal Precast Details Plans - Received comment list requesting revisions. JCM
Routing - FIRE5/20/20085/20/20085/22/2008 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  5/22/2008 FAIL
Failed Structural, Plan Check, Fire
Route to Impact Fee Review5/20/20085/23/20085/20/2008 PASS
DetailsCindy M. Gould
No fees prior to 5/1
Plan resubmittals requested  5/20/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK4/23/2008 5/20/2008 FAIL
DetailsJohn Menard
John Menard
Routing Off Site - STRUCTURAL5/7/2008 5/13/2008 PASS
DetailsJohn Menard
Jason B. e-mailed a copy of the structural response to the consulting structural engineer for review (calculations and response letter only, no plan revisions required). JCM - Received e-mail from consulting structural engineer approving resubmittals. JCM
Plan resubmittals received  5/9/2008 DONE
DetailsMarsha Smylie
received letter of tranmittal from zga arch & "3" each of bars & plates (42) pages & bar & plates (7) pages & bars & plates (4) pages, (2) pages of pre-cast t drawings. "3" sets of stucturals cals part "1" & part "2"--- "3" sets of plans with each sheet of O.1, 1.O, 1.1, 1.2, 1.3, 2.1, 2.2, 2.3, 3.1, 3.2, 3.3, 4.1, 4.2, 4.3, 4.4, 4.5, & 4.6-- plans taken back to john menard-- inserted is tom zabala
Plan resubmittals received  5/7/2008 DONE
DetailsJason Blais
Received 5/7/08 written response from architect. Received 5/6/08 written response and additional structural calculation page from the design engineer. Forwarded information electronically via e-mail to the outside structural review engineer.
Plan resubmittals requested  5/5/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL4/11/2008 4/25/2008 FAIL
DetailsJohn Menard
Called Action Courier for pick up 4-11-08 @ 9:35am BAS
Routing - PLANNING4/22/2008 4/23/2008 PASS
DetailsJosh Wilson
DRH08-00008-Josh Wilson
Routing - PLUMBING4/21/2008 4/22/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - Erosion and Sediment4/16/2008 4/21/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions under ESC08-00178.
Routing PW Environmental4/16/2008 4/17/2008 PASS
DetailsWalt Baumgartner
OK, top uncovered floor drain routes to SW system. Remaining covered floors route to sewer via flamm incpt.
Routing - PUBLIC WORKS4/14/2008 4/16/2008 PASS
DetailsLouise Waldorf
Routing PW Sewer Design4/14/2008 4/16/2008 PASS
DetailsJon R. Gunnerson
Routing PW Sewer Rating4/15/2008 4/16/2008 PASS
DetailsLouise Waldorf
Routing PW Solid Waste4/16/2008 4/16/2008 PASS
DetailsPeter J. McCullough
Solid waste to be taken to off-site container.
Routing PW Street Lights4/15/2008 4/15/2008 PASS
DetailsBill Colson
Routing PW Drainage4/14/2008 4/14/2008 PASS
DetailsBrian Murphy
Plan routing begun/NEW & ADDTN  4/11/2008 DONE
Routing - PLANNING Land Div4/11/2008 4/11/2008 PASS
DetailsJoan Johnson
Application received  4/10/2008  
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  4/10/2008 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  4/10/2008 DONE
DetailsBarbara Stitt