Case Summary (BLD) | | | 5/21/2010 | | |
|
|
|
|
Case Summary (BLD) | | | 5/21/2010 | | |
|
|
|
|
Second Notice | | 7/23/2009 | 8/14/2009 | | DONE |
|
|
|
|
First Notice | | 4/30/2009 | 7/23/2009 | | DONE |
|
|
|
|
BLD-Final | 4/30/2009 | 4/30/2009 | 4/30/2009 | P | PASS |
Tony Young
|
|
|
Curt Phone #: ###-####,, rewalk job final ok now
|
BLD-Conference | 4/29/2009 | 4/30/2009 | 4/30/2009 | A | PASS |
Tony Young
|
|
|
Curt Phone #: ###-####,, rewalk job
|
BLD-Conference | 4/28/2009 | 4/29/2009 | 4/30/2009 | P | PASS |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final
|
Permanent Occupancy | | | 4/30/2009 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 4/28/2009 | 4/28/2009 | 4/29/2009 | | PASS |
Josh Wilson
|
|
|
OK for permanent occupancy- all construction per DRH08-00008
|
BLD-Final | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Tony Young
|
|
|
curt Phone #: ###-#### temp occupancy ok for the lower 3 levels only,, c/n on upper levels include landing areas greater than 4" openings on n/e corner tower,, ,, guardrails on n/west corner tower section over 4",, handrail into door landing area n/w main level,, section of parapets on west and south of 3rd and 4th lower than 42",, upper level parapets / guardrails more than 4" openings at steel joints w/in 42"
|
FIRE-Final Inspection | 4/24/2009 | 4/27/2009 | 4/27/2009 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. NOTE: Elevator recall functions are car and hoistway specific- fire alarm system initiating and notification has not been required, therefore no fire alarm permit work is project attatched, notification devices at the elevator lobbys have been removed to meet these parameters.
|
FIRE-Conference | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | DONE |
Forrest France
|
|
|
Regarding fire life safety requirements for project final.
|
Plan Reviewer's activity | | | 4/2/2009 | | PASS |
John Menard
|
|
|
Reviewed and approved new first level parking layout. The revised layout rearranges some of the handicapped parking space locations. There is no reduction in standard or handicapped spaces. I also discussed the layout with Josh Wilson and he indicated that he had no problem with it. (Plan Sheet A-201) JCM
|
BLD-Conference | 3/19/2009 | 3/19/2009 | 3/19/2009 | P | PART |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final
|
BLD-Conference | 3/18/2009 | 3/19/2009 | 3/19/2009 | A | PART |
Tony Young
|
|
|
Curt Phone #: ###-#### ?s on final,, may want to get temp occ for the 1st two floors.. need all required sign offs,, need a letter of final ok on all structural elements from the structural engineer of record,, need hand rail and guard rails per code..
|
Inspection Record Card- Bld | | | 3/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Plan resubmittals requested | | | 2/6/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting copies of the stairway handrail structural plans and details. JCM
|
FIRE-Conference | 2/2/2009 | 2/2/2009 | 2/3/2009 | P | DONE |
Forrest France
|
|
|
Regarding seismic clearance for vertical standpipe runs.
|
Plan resubmittals received | | | 1/26/2009 | | DONE |
|
|
|
received 1 letter of transmittal, and 2 copies of stair calcs taken to John M.
|
Plan resubmittals requested | | | 1/20/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting copies of the stairway structural calculations. JCM
|
BLD-Conference | 12/10/2008 | 12/11/2008 | 12/11/2008 | A | PASS |
Tony Young
|
|
|
kirt Phone #: ###-#### need to make wall min 42"
|
BLD-Conference | 12/8/2008 | 12/9/2008 | 12/10/2008 | A | PART |
Tony Young
|
|
|
kirt Phone #: ###-#### research,, called plan reviewer
|
BLD-Conference | 12/8/2008 | 12/8/2008 | 12/9/2008 | P | PART |
Tony Young
|
|
|
kirt Phone #: ###-#### need to research wall height
|
BLD-Conference | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | CANC |
Tony Young
|
|
|
kirt Phone #: ###-####
|
Plan Reviewer's activity | | | 11/14/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved structural calcs, window details, and revised plans sheets for the store front window glazing. JCM
|
Plan resubmittals received | | | 11/13/2008 | | |
|
|
|
received 1 transmittal, and 3 copies of sheets A-601,A-602,A-603,A-901 this permit was issued 6-17-08 taken to John M.
|
Plan resubmittals received | | | 11/13/2008 | | |
|
|
|
received letter of transmittal from zga arch & "2" copies of custom glass inc automatic entrances of idaho & "2" copies of calcs from LW engineering p c.--took plans to John Menard
|
Plan resubmittals received | | | 10/28/2008 | | |
Barbara Stitt
|
|
|
1 copy of sheets G-002, A-601, A-602, A-603, A-901, page with NE tower section (A & B) all stamped but not signed, 1 copy of letter to Jason Blais dated 10-27-08 from Thomas Zabala (2 pages), 1 copy of 2006 IBC 1007.3 (5 pgs), 1 copy of 2006 IBC 1012 (9 pgs), 1 copy of 2006 IBC 1607.7 (2 pgs), 1 copy of 2006 IBC 2405.5.1 (12 pgs) taken to Jason Blais 10-28-08 @ 10:00am BAS
|
BLD-Conference | 10/15/2008 | 10/16/2008 | 10/16/2008 | A | PART |
Tony Young
|
|
|
justin - please call 1/2 prior to inspection Phone #: ###-#### on site conf on guardrails,, w/ architect,, need to meet intent of code for designs
|
BLD-Footing | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | PART |
Tony Young
|
|
|
Justin- concrete at 11 Phone #: ###-#### talked w/ strata guys,, ok on front/north ftg pads columns
|
BLD-Footing | 6/20/2008 | 6/23/2008 | 6/23/2008 | A | PART |
Tony Young
|
|
|
Justin- laying concrete at 11 Phone #: ###-#### pending S. ?I. report
|
(F) Reprint permit | | | 6/19/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/17/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/13/2008 | | DONE |
Patricia Smith
|
|
|
t/c w tom zabala at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/13/2008 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/11/2008 | 4/11/2008 | 6/12/2008 | | PASS |
John Menard
|
|
|
6/12/2008 15:09:19 JCM - activity updated through activity BLDA022 from case BLD08-00712.
|
Routing - FIRE | 6/10/2008 | | 6/12/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 6/12/2008 | | 6/12/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/12/2008 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 6/12/2008 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/10/2008 | | 6/12/2008 | | PASS |
John Menard
|
|
|
Sent one copy of response letter and one set of updated structural calculations. - Received letter from consulting structural engineer approving pre-cast concrete resubmittals. JCM
|
Plan Reviewer's activity | | | 6/10/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved nonstructural revisions. JCM
|
Routing - PLAN CHECK | 5/22/2008 | | 6/10/2008 | | PASS |
John Menard
|
|
|
|
Plan resubmittals received | | | 6/9/2008 | | DONE |
|
|
|
Received 1 transmittal letter,3 letters,3 calcs, 2 copies of sheet A-901,4 copies of sheet A-201, and 2 copies of sheets G-002,A-202,A-203,A-204,M1.1 inserted by Thomas Zabala from ZGA Architects
|
Plan resubmittals requested | | | 5/27/2008 | | DONE |
|
|
|
E-mailed the architect a copy of structural review for the pre-cast concrete requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 5/9/2008 | | 5/27/2008 | | FAIL |
John Menard
|
|
|
called action courier for pickup - Deferred submittal Precast Details Plans - Received comment list requesting revisions. JCM
|
Routing - FIRE | 5/20/2008 | 5/20/2008 | 5/22/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 5/22/2008 | | FAIL |
|
|
|
Failed Structural, Plan Check, Fire
|
Route to Impact Fee Review | 5/20/2008 | 5/23/2008 | 5/20/2008 | | PASS |
Cindy M. Gould
|
|
|
No fees prior to 5/1
|
Plan resubmittals requested | | | 5/20/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 4/23/2008 | | 5/20/2008 | | FAIL |
John Menard
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 5/7/2008 | | 5/13/2008 | | PASS |
John Menard
|
|
|
Jason B. e-mailed a copy of the structural response to the consulting structural engineer for review (calculations and response letter only, no plan revisions required). JCM - Received e-mail from consulting structural engineer approving resubmittals. JCM
|
Plan resubmittals received | | | 5/9/2008 | | DONE |
Marsha Smylie
|
|
|
received letter of tranmittal from zga arch & "3" each of bars & plates (42) pages & bar & plates (7) pages & bars & plates (4) pages, (2) pages of pre-cast t drawings. "3" sets of stucturals cals part "1" & part "2"--- "3" sets of plans with each sheet of O.1, 1.O, 1.1, 1.2, 1.3, 2.1, 2.2, 2.3, 3.1, 3.2, 3.3, 4.1, 4.2, 4.3, 4.4, 4.5, & 4.6-- plans taken back to john menard-- inserted is tom zabala
|
Plan resubmittals received | | | 5/7/2008 | | DONE |
Jason Blais
|
|
|
Received 5/7/08 written response from architect. Received 5/6/08 written response and additional structural calculation page from the design engineer. Forwarded information electronically via e-mail to the outside structural review engineer.
|
Plan resubmittals requested | | | 5/5/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 4/11/2008 | | 4/25/2008 | | FAIL |
John Menard
|
|
|
Called Action Courier for pick up 4-11-08 @ 9:35am BAS
|
Routing - PLANNING | 4/22/2008 | | 4/23/2008 | | PASS |
Josh Wilson
|
|
|
DRH08-00008-Josh Wilson
|
Routing - PLUMBING | 4/21/2008 | | 4/22/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 4/16/2008 | | 4/21/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions under ESC08-00178.
|
Routing PW Environmental | 4/16/2008 | | 4/17/2008 | | PASS |
Walt Baumgartner
|
|
|
OK, top uncovered floor drain routes to SW system. Remaining covered floors route to sewer via flamm incpt.
|
Routing - PUBLIC WORKS | 4/14/2008 | | 4/16/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Sewer Design | 4/14/2008 | | 4/16/2008 | | PASS |
Jon R. Gunnerson
|
|
|
|
Routing PW Sewer Rating | 4/15/2008 | | 4/16/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | 4/16/2008 | | 4/16/2008 | | PASS |
Peter J. McCullough
|
|
|
Solid waste to be taken to off-site container.
|
Routing PW Street Lights | 4/15/2008 | | 4/15/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Drainage | 4/14/2008 | | 4/14/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/11/2008 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 4/11/2008 | | 4/11/2008 | | PASS |
Joan Johnson
|
|
|
|
Application received | | | 4/10/2008 | | |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/10/2008 | | DONE |
Barbara Stitt
|
|
|
|