Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00729
StatusFinaled
Name R SQUARED CONSTRUCTION
Site Address 1219 S BROADWAY AVE
Project NameALBERTSONS #119
Customer Number 
ePlanReviewNo
Description
(ALBERTSONS 119 - PHARMACY REMODEL) To remodel a 280 square foot portion of an existing 27,850 square foot mercantile building. Work to include: [demolition of existing flooring, existing partitions, existing doors, and interior finishes,] construction of new partitions to isolate pharmacy area, installation of new lighting, repair and replace existing suspended ceiling system as needed, relocate existing drain, and install interior finishes in compliance with chapter 8 of the IBC. This building is fully fire sprinkled alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be maintained per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/14/2016 DONE
Second Notice BLD3/4/20093/4/20093/5/2009 DONE
DetailsPatricia Smith
First Notice has not been responded to.
First Notice2/10/20092/10/20093/4/2009 DONE
DetailsJim Storey
BLD-Aging Inspection2/10/20092/10/20092/10/2009 DONE
DetailsJim Storey
DOC - Permit Finaled2/10/20092/10/20092/10/2009PPASS
DetailsJim Storey
BLD-Final6/4/20086/5/20086/5/2008APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/4/2008 at 2:05:46 PM.
FIRE-Final Inspection6/4/20086/4/20086/4/2008PPASS
DetailsForrest France
Fire life safety passed, PFE to be posted as discussed.
BLD-Other5/28/20085/29/20085/29/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/28/2008 at 2:55:41 PM. Contact: ###-####. - ceiling grid pending ele
BLD-Framing/Rough-in5/19/20085/19/20085/19/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/19/2008 at 7:46:35 AM. Contact: ###-####.
Issue PAID IN FULL permit  5/7/2008 DONE
Routing - FIRE  5/6/2008 PASS
Field Verify - Modifications to sprinkler system shall be in accordance with the NFPA #13 guidelines, and all work shall comply with the 2006 IFC.
1st review completed  5/6/2008 PASS
Plan assigned to (TLW)4/17/2008 5/6/2008 PASS
DetailsTim L. Woodard
5/6/2008 10:26:27 TLW - activity updated through activity BLDA022 from case BLD08-00729.
Routing - PLAN CHECK4/18/2008 5/6/2008 PASS
DetailsTim L. Woodard
Plans approved per redlines and plan review report.
PLANS/APPL TAKEN TO FRONT DESK  5/6/2008 DONE
Case Summary (BLD)  5/6/2008 DONE
Inspection Record Card- Bld  5/6/2008 DONE
Telephone call  5/6/2008 DONE
left vm for william beckman at ###-#### - permit ready and fees given
Permit Ready to Issue  5/6/2008 DONE
Routing - PUBLIC WORKS4/17/2008 4/18/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating4/18/2008 4/18/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS4/14/2008 4/17/2008 DONE
DetailsMarlene Southard
4/17/2008 16:40:55 MYS - activity updated through activity BLDA185 from case BLD08-00729.
Plans ACCEPTED BY PLAN TECH  4/14/2008  
Recd Pcfee & Taken To Pln CK  4/14/2008 DONE
Application received  4/14/2008