Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-00736
StatusFinaled
Name JACQUELINE ROSE
Site Address 8770 W OVERLAND RD
Project NameHEAVEN ESSENCE
Customer Number 
ePlanReviewNo
Description
9-19-08 Building owner to be the GC To convert 1,829 sq. ft. portion (includes 350 sq. ft. mezzanine) of a one story, 3,109 sq. ft. dwelling with a 600 sq. ft. free standing garage. the 1,829 sq. ft. portion including mezzanine to be used as a retail sales "M" occupancy and support office area. The remaining 1,280 sq. ft. area (Phase II) will remain vacant and non-complying until such time as separate application and plans are submitted for code compliance upgrade per Letter of Agreement on file (copy attached to plans) and a permit for said upgrade is issued. Additional fee's will be due for ACHD at that time. The live load for the mezzanine level is restricted to 50 PSF with no concentrated loading per engineering analysis and note on plans. A permanent sign stating this maximum live load restriction is to be posted at the top of the stairs as indicated on plans and the tenant / owner is responsible for enforcement of loading compliance. This permit will establish a Certificate of Occupancy for 'Heaven Essence' floral shop when this scope of work is completed. Permit includes indicated site work, parking lot, accessible parking and accessible route & signage and all red-lined conditions noted on plans and all attached plan review conditions of all reviewing agencies. DRH07-00312, DRH07-00424 and CAR06-00029. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Agreement of Future work9/15/20089/9/20115/5/2011 DONE
DetailsDan Stuart
#1 - From the date of the building permit, BLD08-00736, issued 9/9/08, Mr. Rose has three years to complete the change of occupancy house conversion of Phase II to include submittal of applications, plans and receive a building permit to upgrade the remaining portion of the original residential occupancy to comply with current code requirements for a change of occupancy as a "B" occupancy, to be completed no later than 9/9/2011.
#2 - To post a bond for an approved amount +15%, to complete the occupancy use conversion before the end of one year from 9/9/08, if Phase II is not completed within one year.
#3 - If not completed within 2 years of 9/9/08 the bond amount will be increased by an additional 15% on or before 9/9/10.
#4 - If the phase II is not completed by 9/9/2011, the bond may be cashed in order to complete the scope of work covered in the upgrade agreement.
12/15/09 - Copy of upgrade agreement e-mailed to Duston Rose as notification of requirements he previously agreed too and the need to post the required bond. Copy to Jason Blais, Jenifer Gilliland, Bob Archibald, Mark Senteno and Scott Arellano.
An upgrade agreement has been proposed and accepted by Duston Rose, owner; Dave Henneman, BCFD Fire Marshal and George Slane, Building Official, as defined in Boise city Code, Section 4-02-28, IBC Building Code Amendment, Section 116, Upgrade Agreements. Dave Henneman signed the agreement on 9/10/08 and George slane signed agreement on 9/15/08.
BLD08-00736, Heaven Essence, 8770 W. Overland, known as Phase I in this upgrade agreement, will be for the conversion of a 1,829 sq. ft. portion (includes 350 sq. ft. mezzanine) of an existing 3,109 sq. ft. single family dwelling to commercial retail use as a flower shop.
Those portions of the building, the remaining 1,280 sq. ft., known as Phase II in the upgrade agreement, as indicated on ASI 1, "will not be altered from their current state or occupied for use without first submitting drawings, prepared and stamped by an Idaho licensed architect, showing compliance with then current adopted codes and ordinances of Boise City and a permit given to do so."
A copy of the signed upgrade agreement is attached to each set of plans and as a document, attached to BLD08-00736. A copy of the approved agreement has been provided to Bob Archibald, Boise City special projects manager, to record with the property at the Ada County Assessor's Office..

5/11/11 Notice of Compliance recorded at the Ada County Recorder's Office. Upgrade Agreement no longer valid. Issues changed and cleared up under a separate permit (BLD11-00072).
Third Notice BLD1/29/20091/29/20093/17/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
(F) Reprint permit  1/14/2009 DONE
Case Summary (BLD)  1/14/2009  
First Notice 12/16/20081/2/2009 DONE
BLD-Final12/16/200812/16/200812/16/2008PPASS
DetailsMike Jordan
dustin Note: if possible around 3:00 pm Phone #: ###-####. ok for perm occ.
PubWorks Occupancy Approval12/16/200812/16/200812/16/2008 DONE
DetailsBrian Murphy
Approved based on engineer inspection letter per Brian Murphy///12-16-08 BAS
Zoning Approval12/16/200812/16/200812/16/2008 PASS
DetailsSarah Schafer
Approved. The applicant had Turf's Up seeding go out and hydro seed the property on Friday, Dec. 12, just before it snowed. The landscape architects we have on staff do not believe the hydroseed will take, however we have agreed to allow the occupancy with Planning Staff following up in the fall on the germenation of the grass. The owner has agreed to reseed if necessary in the spring and we will be documenting this with a follow up letter today.
Permanent Occupancy UNPAID FEE  12/16/2008 DONE
DetailsBarbara Stitt
Telephone call  12/15/2008 DONE
DetailsSarah Schafer
Dustin Rose called again today for an inspection. He was able to get Chad Roberts with Turf's Up Seeding Service (###-####) to hydroseed the property on Friday, just before the snow. I called Chad to find out if the hydroseed would actually work in the spring and he said that because of the tactifier that was in the spray, it wold germenate in the spring.

Landscape Architects on staff here at the City say that maybe 50% of the are will germenate.
Plan resubmittals received  12/15/2008 DONE
received construction site improvements plans issued 9-19-08 taken to Brian M.
FIRE-Final Inspection12/8/200812/9/200812/10/2008APASS
DetailsTroy Cobbley
Life safety passed.
Telephone call  12/9/2008 DONE
DetailsSarah Schafer
Dustin Rose wants to come in and change the landscape plan and then wants to change the irrigation for the lawn from the flood irrigation to the well water. He will be coming into the office to discuss the changes to the landscape plan. He will contact Brian Murphy regarding the irrigation.
BLD-Final12/4/200812/4/200812/4/2008PNR
DetailsMike Jordan
judy Note: please call 1/2 hr prior to inspection Phone #: ###-####. Still needs zoning, public works and life/safety.
Telephone call  12/4/2008 DONE
DetailsSarah Schafer
Judy requested an inspection of the property for occupancy. I drive past the property everyday coming into work so I asked if they had the two bids for the landscape bond. She said they did not but she would work on it and would call me out for an inspection at that time. I will not be going out for the inspection request made on 12-4-08. Jackie Rose then called to ask what needed to be done for the bond. I explained the process to her and she informed me they would probably not be able to bond but would try to get the landscape in. She will call back when ready for an inspection.
BLD-Framing/Rough-in11/28/200812/1/200812/1/2008PPASS
DetailsMike Jordan
Jackie phone # ###-####
also conf. on final
BLD-Framing/Rough-in11/28/200811/28/200811/28/2008PNR
DetailsTony Young
dustin Phone #: ###-####
will wait for 450 on 12/1/08, phone conf. only,, needs plumbing also,, needs a conf on final as well as frame on underfloor beams
Telephone call  11/17/2008 DONE
Dustin Rose called concerning need for plumbing permit. Told him the fee's he paid when he picked up the permit did not include the separate permits required of his plumber, electrician or mechanical contractors. A separate permit is required for each trade. I notified Rita DeYoung that the plumber would be applying for a permit.
Zoning Approval10/27/200810/27/200810/27/2008 FAIL
DetailsSarah Schafer
Meet Frank Turk on site. There is still paving (curbm, gutter and access points) to be installed. The fencing is not complete and they are going to need to bond for landscape improvements. The parking stalls are not striped and staff did not see the trash enclosure. There is still work to be done and he will call when they have completed the site.
BLD-Concrete10/22/200810/22/200810/22/2008PNR
DetailsMike Jordan
john Phone #: ###-####
BLD-Other10/14/200810/14/200810/14/2008PPASS
DetailsMike Jordan
Fred Phone #: ###-####. Installation of additional beams for upgrade in load.
BLD-Other10/6/200810/6/200810/6/2008PPASS
DetailsMike Jordan
fred Note: beams Phone #: ###-####
BLD-Conference9/19/20089/23/20089/23/2008PDONE
DetailsMike Jordan
duston Phone #: ###-####
Print Occupancy Form  9/19/2008 DONE
Details
Telephone call  9/19/2008 DONE
Details
left vm for duston rose at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
Telephone call  9/19/2008 DONE
Details
left vm for rob cooper at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
Issue PAID IN FULL permit  9/19/2008 DONE
Permit Ready to Issue  9/19/2008 DONE
Plan Reviewer's activity  9/18/2008 DONE
Copy of final plan review clarifications and conditions not clearly answered on plan resubmittals have been red-lined on plans and appropriate code sections referenced. Copy of final review e-mailed to architect and owner.
PLANS/APPL TAKEN TO FRONT DESK  9/18/2008 PASS
Approved based on red-line conditions, code sections and all attached plan review conditions of all reviewing agencies.
Plan assigned to (DRS)4/18/2008 9/18/2008 PASS
DetailsDan Stuart
9/18/2008 18:06:47 DRS - activity updated through activity BLDA022 from case BLD08-00736.
Routing - PLAN CHECK6/9/2008 9/18/2008 PASS
DetailsDan Stuart
Plans approved based on condition of tenant / owner complying with red-lined conditions & code section referenced on plans and the attached plan review conditions of all reviewing agencies.
Plan resubmittals received  9/17/2008  
DetailsDan Stuart
Received two copies of structural calculations and details on Manufactured Home Support Pier; taken to Dan Stuart
Plan resubmittals received  9/16/2008 DONE
DetailsTisha Gallop
Received response letter and two copies of plan sheets T1.0, A0.5, A1.1, A1.3, A1.4, A2.1, A3.1, S1.1; inserted into plans by arch. rep. and taken back to Dan Stuart
Plan Reviewer's activity  9/15/2008 DONE
Received copy of Upgrade Agreement signed and dated by Dave Hanneman, Boise City FD Fire Marshal; George Slane, Boise city Building Official; and Duston Rose, property owner. E-amiled PDF copy to Duston Rose and attached to this BLD as DOC_UPGRADE 9-15-08.
Plan Reviewer's activity  9/10/2008 DONE
Fourth proposed copy of Upgrade Agreement was submitted by Duston Rose on 9/9/08 in accordance with requested changes per letter of 9/8/08 hand delivered to Mr. Rose at Boise PDS Dept. Made copy of proposal and placed proposed upgrade agreement on Building Official, George Slane's desk.
Meeting  9/8/2008 DONE
Met with Duston Rose in lobby to review the proposed requested changes to the proposed upgrade agreement. I gave him a copy of the reuested changes letter of 9/5/08 that had been reviewed by George Slane, Sam Rogers, Jason Blais and Bob Archibald. Their suggestions were included in the letter given to duston Rose.
Telephone call  9/8/2008  
Telephone call  9/5/2008 DONE
Talked with Duston to let him know additional clarification was needed and that I had e-mailed him a copy with strikeouts and underlined items to be added.
Plan Reviewer's activity  9/4/2008 DONE
I followed up with George Slane concerning the upgrade agreement. Further clarification is needed and I was ask to reformat the proposed agreement. Idid so and then sent copy to Jason Blai, Jenifer gilliand, George Slane, Sam rogers and Bob Archibald. I discussed each persons review for any added information or alterations needed. Bob Archibald wanted the parcel number included. Jenifer is on vacation. All others did not have further comments at this time. I e-mailed copy to Duston Rose for his review and action for resubmitting.
Plan Reviewer's activity  8/22/2008 DONE
Review of upgrade proposal with George Slane. He had reviewed with Sam Rogers and the format of the agreement was not clear to them as to what was being agreed to and one of the attachments had modified the boundary of the Phase I and Phase II areas. I called John Reseigh, architect, to see if changes were intended. He did not know of any change but would call Duston to review proposal with him and I told him I would have Duston pick up the proposal and bring to his office so they could review and modify letter or plans as they determined. Duston picked up proposal letter andtook to architect.
Plan Reviewer's activity  8/21/2008 DONE
Jenifer Gilliland e-mailed requirements for an upgrade letter to Duston after we met with him in our reception area on 8/20/08. Jenifer added specific wording concerning the bond she wanted Duston to add.
Plan Reviewer's activity  8/20/2008 DONE
Duston provided proposed upgrade letter to the building official, George Slane. George placed letter on my desk with note - What do I think of this. I reviewed with him on 8/22/08. Items addressed in proposal attachments were different than original reviewed plans.
Telephone call  8/19/2008 DONE
Duston rose called concerning activity of his upgrade agreement proposal of 8/13/08. I told him I had sent e-mail to George Slane and Jenifer Gilliand asking if they had considered the upgrade agreement proposal.
Plan Reviewer's activity  8/15/2008 DONE
Request for specific consideration by building official and fire chief concerning Dwelling Conversion code upgrades for vacant portion of building was received 8/14/08. Copy of letter and floor plan with a cover letter from me given to George Slane, Building Official, for consideration and routing to FD. George took letter to Jenifer Gilliland, PDS Building Div. Manager.
Telephone call  6/20/2008 DONE
Judy Smith called concerning a permit. Told I had talked with Tim Johnson, structural engineer 6/12/08 & Dustin Rose on 6/9/08 concerning resubmittals and need to provide new plans from architect showing code compliance for loads & support structure; areas proposed for use.
Telephone call  6/12/2008 DONE
Talked with Tim Johnson concerning structural review for building for 1st floor area & upper level and possible option of designing post & beam support for upper level to reduce spans such that he would be comfortable with the added stength to certify load & support requirements per current code. First floor retail needs to comply with chapter 16 for loads.
Telephone call  6/9/2008 DONE
Talked with Mr. Rose concerning his project on converting the house to commercial. Wants to convert the full building to commercial with only the front portion complying with 2006 IBC for proposed use as a retail floral shop to comply with current code; to close of the upper level to be an attic with an attic access door only and the plans clearly marked as attic use only; and to provide a letter to George Slane & fire marshall requesting acceptance of his proposal that the rear portion (formerly the apartment) is to be left vacant with no commercial upgrade change under this permit. He will put in writing that he understands and will comply with all required upgrades for compliance with code in effect at time of remodel before any tenant or occupancy can occur in the remainder of the building.
He is also looking at the possibility to see if the second level will qualify as a mezzanine instead of a story in accordance with Section 505, 2006 IBC. He will review this pssibility with the architect.
There is no basement only a mechanical service room for the building.
He needs a structural engineers analysis and design for structural upgrade if necessary for the first floor at 100psf and the second level based on the occupancy use proposed if the area is to be used.
I explained to Mr. Rose that his design professional needed to look at the conversion as if this was a new building for the proposed occupancy uses and provide all details showijng compliance with current code for each proposed use. If the building is considered two stories with the "M" & S1" occupancies, the building is required to be 1-hour fire-resistive throughout or sprinklered throughout for either of these occupancies to be located in a 2 story structure per Table 503 IBC. The architect needs to carefully review the building to show compliance with code.
The structural engineer might review the existing construction and propose additional structural support reducing the joist spans by using post & beam to grade structural units to be sure the floor system will support proposed uses.
Mr. Rose will provide description of his proposal to limit conversion to phases consisting of the retail area as phase 1, the rear future commercial area and the upper level as separate phase with aknowledgement he understand what is required in the way of application, plans and structural analysis & design before any work or use of areas not in phase 1 can legally be performed. The building official grants has authority to grant code alternates per 104 IBC.
Routing PW Drainage6/9/2008 6/9/2008 PASS
DetailsBrian Murphy
Letitia Gallop e-mailed me that new O&M manual and drainage plans were submitted to Brian Murphy in Public Works and to route plans back to him. Checking the computer entry, Brian approved the plans on 5/21/08. I hand carried the plans to Brian to see if he needed them. He has approved the plans on 5/21/08 but had required the design professional provide him with an O&M manual.
Plan resubmittals received  6/6/2008  
DetailsTisha Gallop
Received transmittal, two copies of drainage calcs and O & M Manual; inserted into plans by LEG
Routing - Erosion and Sediment5/22/2008 5/23/2008 PASS
DetailsSteven Webb
ESC approved with attached conditions. ESC-8=00294
Route to Impact Fee Review5/21/20085/27/20085/22/2008 PASS
DetailsCindy M. Gould
No impact fee prior to 5/1
Routing - PUBLIC WORKS5/22/2008 5/22/2008 PASS
DetailsBeverly Hall
Telephone call  5/22/2008 DONE
Talked with John Roseigh, architect. Needs structural engineering analysis and design data for code compliance based on proposed use; determination if 2-story structure or one story with mezz. If 2 story needs to be 1-hour constrcution or sprinklered. If Mezzanine must comply with mezzanine section of code. He needs to get with Mr. Rose and determine next step for project.
Routing PW Drainage5/15/2008 5/21/2008 PASS
DetailsBrian Murphy
Plan resubmittals received  5/15/2008  
Received two copies of sheets 3 of 14 and 7 of 14; inserted into plans by LEG and taken back to (Dan Stuart?) Public Works.
Routing - FIRE5/9/20085/9/20085/14/2008 PASS
DetailsKenneth R Roule
See fire plan review notes.
Plan resubmittals received  5/14/2008  
Received transmittal and three copies of drainage narrative and sheets 3 of 14, 7 of 14; inserted by LEG and taken plans back to Ken Roule. Called Centra(company on the transmittal) and told them need two more copies of plan sheets.
1st review completed  5/14/2008 FAIL
Failed Plan Check/ PW/ Erosion and sediment/ PW Drainage.
Routing - PLAN CHECK4/24/2008 5/9/2008 FAIL
DetailsDan Stuart
Copy of plan review e-mailed to architect. Resubmittals required. Routing plans to fire code analyst.
Routing - PLANNING4/22/2008 4/24/2008 PASS
DetailsSarah Schafer
Sarah Schafer DRH07-00312, mod DRH07-00424

Approved per the DRs.
Routing - PUBLIC WORKS4/18/2008 4/22/2008 FAIL
DetailsLouise Waldorf
Routing - Erosion and Sediment4/22/2008 4/22/2008 FAIL
DetailsSteven Webb
ESC narrative does not meet standards per BMC 8-17. Refer to plan designer manual and ordinance for details. ESC08-00294.
Routing PW Sewer Rating  4/22/2008 PASS
DetailsLouise Waldorf
Routing PW Drainage4/18/2008 4/21/2008 FAIL
DetailsBrian Murphy
NO DRAINAGE REPORT, OAND M PLAN,GEOTECH . SIDE SLOPES 2 TO 1 AND SWALE 2 FEET DEEP. GRADES LESS THAN 1 PERCENT.
Routing PW Street Lights  4/21/2008 PASS
DetailsBill Colson
Pending Assignment by MYS4/15/2008 4/18/2008 DONE
DetailsMarlene Southard
4/18/2008 08:01:50 MYS - activity updated through activity BLDA168 from case BLD08-00736.
Plans ACCEPTED BY PLAN TECH  4/15/2008  
Recd Pcfee & Taken To Pln CK  4/15/2008 DONE
Application received  4/14/2008  
Zoning Approval10/24/200810/24/2008   
Sarah Schafer
Routing - PLAN CHECK     
DetailsDan Stuart