Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD08-00763
StatusFinaled
Name STEELWOOD ENTERPRISES LLC
Site Address 1817 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(TENANT SHELL - STEELWOOD FLEX CONDOS - BUILDING #1 - UNIT 48) This building is fire sprinklered for area and story increase. To construct interior improvements within an existing 1,410 square foot warehouse tenant space. The walls creating this tenant space were constructed under permit BLD04-02470. Work is to include a restroom accessible to the disabled. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20094/3/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/22/20081/2/2009 DONE
BLD-Final12/22/200812/22/200812/22/2008PPASS
DetailsJim Sly
ron Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  12/22/2008 DONE
DetailsAlexandra L. DeYoung
FIRE-Final Inspection11/26/200811/28/200811/28/2008APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection7/17/20087/17/20087/17/2008PCANC
DetailsTroy Cobbley
The tenant space was not ready for an inspection. Contractor is going to reschedule.
BLD-Framing/Rough-in6/19/20086/20/20086/20/2008APASS
DetailsJim Sly
Ron Phone #: ###-####
Telephone call  5/23/2008 DONE
t/c w elizabeth at ###-#### x 4 - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  5/23/2008 DONE
Issue PAID IN FULL permit  5/23/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/22/2008 DONE
Print Occupancy Form  5/22/2008 DONE
Plan assigned to (CJW)4/18/2008 5/22/2008 PASS
DetailsCarl Westfall
5/22/2008 10:01:29 CJW - activity updated through activity BLDA022 from case BLD08-00763.
Routing - PLAN CHECK5/13/2008 5/21/2008 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
Routing - PUBLIC WORKS5/21/2008 5/21/2008 DONE
Added another drinking fountain. Reviewed by Connie.
Route to Impact Fee Review5/13/20085/16/20085/15/2008 PASS
DetailsCindy M. Gould
Tennet improvement no fees permit before 5/1
Plan resubmittals received  5/15/2008  
DetailsCarl Westfall
Received 1 cover-response letter dated 5-14-08 from Elizabeth Cooper, 2 copies of sheets A1.0, A2.0 and taken to Carl Westfalls desk 5-15-08 @ 10:45am BAS
Routing - FIRE5/9/20085/9/20085/13/2008 PASS
DetailsScott Arellano
See fire plan review notes.
1st review completed  5/13/2008 FAIL
Failed plan check
Routing - PLAN CHECK4/21/2008 5/9/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 9, 2008 and was finished the same day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS4/18/2008 4/21/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating4/21/2008 4/21/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS4/16/2008 4/18/2008 DONE
DetailsMarlene Southard
4/18/2008 12:11:56 MYS - activity updated through activity BLDA172 from case BLD08-00763.
Plans ACCEPTED BY PLAN TECH  4/16/2008 DONE
Recd Pcfee & Taken To Pln CK  4/16/2008 DONE
Application received  4/16/2008