BLD-Final | 5/26/2008 | 5/27/2008 | 5/27/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/26/2008 at 2:56:07 PM. per eng
|
DOC - Permit Finaled | 5/27/2008 | 5/27/2008 | 5/27/2008 | P | PASS |
Tom Arcoraci
|
|
|
per eng
|
BLD-Framing/Rough-in | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
walter Phone #: ###-####
|
BLD-Footing | 4/18/2008 | 4/18/2008 | 4/18/2008 | P | PASS |
Dave Hannah
|
|
|
walter Phone #: ###-####
|
Plan assigned to (BSP) | 4/17/2008 | 4/17/2008 | 4/17/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
Routing Walk-In (Zoning) | 4/17/2008 | 4/17/2008 | 4/17/2008 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 4/17/2008 | 4/17/2008 | 4/17/2008 | A | DONE |
Ben S. Pavelka
|
|
|
4/17/2008 11:28:51 BSP - activity updated through activity BLDA022 from case BLD08-00780.
|
Case Summary (BLD) | | | 4/17/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/17/2008 | | |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/17/2008 | | DONE |
Ben S. Pavelka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2008 | | DONE |
|
|
|
|
Application received | | | 4/17/2008 | | |
|
|
|
|