BLD-Final | 4/20/2009 | 4/21/2009 | 4/21/2009 | A | PASS |
Dave Hannah
|
|
|
roddy Phone #: ###-####
|
DOC - Permit Finaled | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 3/9/2009 | 3/9/2009 | 3/9/2009 | P | PASS |
Jim Storey
|
|
|
reviewed handrail ok to have one rail to landing. two risers from landing to bonus rm. handrail not required/ shape and size of handrail tubing ok for const. back door of garage needs to swing our or need landing in the garage for door swinging over landing to exstend.
|
BLD-Energy code compliance | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PASS |
Dave Hannah
|
|
|
Roddy Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2008 | 12/19/2008 | 12/19/2008 | P | PASS |
Dave Hannah
|
|
|
robby Phone #: ###-#### all c/n items completed ok to insulate
|
BLD-Framing/Rough-in | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | FAIL |
Jim Sly
|
|
|
RODDY Phone #: ###-#### C/N.....Truss corr.....posted
|
BLD-Other | 9/10/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Tony Young
|
|
|
Roddy- pre grout for fire place Phone #: ###-#### lower portion ok
|
BLD-Foundation | 7/21/2008 | 7/22/2008 | 7/22/2008 | A | PASS |
Dave Hannah
|
|
|
tom - stem wall Phone #: ###-####
|
BLD-Footing | 7/14/2008 | 7/15/2008 | 7/15/2008 | A | PASS |
Jim Storey
|
|
|
roddy Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/26/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/25/2008 | | DONE |
|
|
|
left vm for roddy lockett at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/25/2008 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 6/19/2008 | 6/19/2008 | 6/24/2008 | | PASS |
Carl D Madsen
|
|
|
6/24/2008 11:18:04 CDM - activity updated through activity BLDA022 from case BLD08-00789.
|
Case Summary (BLD) | | | 6/24/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/19/2008 | | 6/24/2008 | | PASS |
Carl D Madsen
|
|
|
|
Pending Assignment by SRZ | 4/17/2008 | | 6/19/2008 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2008 | | 6/19/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing - PLANNING | 6/17/2008 | | 6/19/2008 | | PASS |
Sue Cummings
|
|
|
O.K. as per variance # CVA08-00018.
|
Routing - Addressing | 4/21/2008 | | 4/21/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | | 4/17/2008 | | DONE |
Bethany Sullins
|
|
|
|
Case Summary (BLD) | | | 4/17/2008 | | DONE |
|
|
|
|
Routing - PLANNING | 4/21/2008 | | | | FAIL |
|
|
|
garage does not meet setbacks. Called applicant and Architect 4/23/08 ctc
|