Second Notice BLD | 1/29/2009 | 1/29/2009 | 2/25/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/9/2009 | 1/29/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/9/2009 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 1/6/2009 | 1/6/2009 | 1/8/2009 | | PASS |
Matthew A Halitsky
|
|
|
|
BLD-Aging Inspection | 12/31/2008 | 12/31/2008 | 12/31/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 10/29/2008 | 10/29/2008 | 11/3/2008 | P | PASS |
Tom Arcoraci
|
|
|
vince Phone #: ###-####-ok for perm after code enforcement sign off
|
BLD-Final | 7/17/2008 | 7/18/2008 | 7/17/2008 | A | PART |
Tom Arcoraci
|
|
|
vince Phone #: ###-#### ok for temp occ need comment list for plans
|
Code Occupancy Approval Temp | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PASS |
Dena Gambrel
|
|
|
7-17-08 TEMP ONLY. BOND RECEIVED.
|
FIRE-Final Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
Code Occupancy Approval | 7/15/2008 | 7/15/2008 | 7/15/2008 | P | FAIL |
Dena Gambrel
|
|
|
7-14-08 1405 Failed. Lanscape not finished. What was installed is not what was approved. Correction Notice left.
|
FIRE-Final Inspection | 7/11/2008 | 7/14/2008 | 7/14/2008 | A | FAIL |
Troy Cobbley
|
|
|
Pick a door that is to be the main entrance/exit. This door will need the thumbturn lock removed and keyed provided. All of the other doors will need the thumbturn locks removed. The provided fire extinguisher is too small. Provide a 2a10bc with a current inspection tag from a local licenced fire extinguisher contractor.
|
BLD-Final | 7/11/2008 | 7/14/2008 | 7/14/2008 | P | NR |
Tom Arcoraci
|
|
|
vince Phone #: ###-#### needs zoning sign off
|
BLD-Framing/Rough-in | 6/23/2008 | 6/24/2008 | 6/24/2008 | A | PASS |
Tom Arcoraci
|
|
|
vince Phone #: ###-####
|
BLD-Energy code compliance | 6/19/2008 | 6/20/2008 | 6/20/2008 | P | PASS |
Jim Sly
|
|
|
vince Phone #: ###-####
|
BLD-Framing/Rough-in | 6/18/2008 | 6/19/2008 | 6/19/2008 | A | PASS |
Jim Sly
|
|
|
vince Phone #: ###-####
|
BLD-Footing | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
BEN Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/29/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/23/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/23/2008 | | DONE |
|
|
|
t/c w dana kauffman at ###-#### - permit ready and fees given - also need gc name, rce#, rp name and ACHD receipt
|
Permit Ready to Issue | | | 5/23/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2008 | | DONE |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 4/22/2008 | | 5/22/2008 | | PASS |
Sam Zahorka
|
|
|
5/22/2008 13:44:50 SRZ - activity updated through activity BLDA022 from case BLD08-00802.
|
Routing - PLAN CHECK | 5/13/2008 | | 5/22/2008 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 5/20/2008 | | |
Sam Zahorka
|
|
|
Received 2 copies of sheets S2.0, A2.0, A4.0, A5.0 and response letter from Dana Lauffman dates 5-14-08 and inserted by Dana Kauffman then taken back to Sam Zahorka's desk 5-20-08 @ 9:30am BAS
|
Routing - FIRE | 5/9/2008 | 5/9/2008 | 5/13/2008 | | PASS |
Sam Rogers
|
|
|
See fire plan review notes.
|
1st review completed | | | 5/13/2008 | | DONE |
Kenneth R Roule
|
|
|
|
Route to Impact Fee Review | 5/9/2008 | 5/14/2008 | 5/9/2008 | | PASS |
Cindy M. Gould
|
|
|
Commercial permit received prior to 5/1
|
Routing - PLAN CHECK | 5/8/2008 | | 5/9/2008 | | FAIL |
Sam Zahorka
|
|
|
Sent Correction letter to Architect. Routed to Fire.
|
Routing - PLANNING | 5/5/2008 | | 5/8/2008 | | PASS |
Matthew A Halitsky
|
|
|
drh08-0006- Matt Halitsky
|
Case Summary (BLD) | | | 5/7/2008 | | DONE |
|
|
|
|
Routing - PLUMBING | 4/30/2008 | | 5/5/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - Erosion and Sediment | 4/28/2008 | | 4/30/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00325
|
Routing - PUBLIC WORKS | 4/28/2008 | | 4/28/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING Land Div | 4/22/2008 | | 4/28/2008 | | PASS |
Todd Tucker
|
|
|
|
Routing PW Sewer Rating | 4/28/2008 | | 4/28/2008 | | PASS |
Louise Waldorf
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/22/2008 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/22/2008 | | |
Joan Johnson
|
|
|
|
Pending Assignment by MYS | 4/18/2008 | | 4/22/2008 | | DONE |
John Menard
|
|
|
4/22/2008 09:45:43 JCM - activity updated through activity BLDA160 from case BLD08-00802.
|
Application received | | | 4/18/2008 | | |
|
|
|
|