BLD-Final | 3/2/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/2/2009 at 5:17:47 PM. Contact: ###-####. c/n made ok l/c on site.
|
DOC - Permit Finaled | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 2/24/2009 | 2/24/2009 | 2/25/2009 | P | FAIL |
Dave Hannah
|
|
|
Monica Phone #: ###-#### needs temp glass rest room guist house and hand rail on front stairs
|
BLD-Final | 2/20/2009 | 2/23/2009 | 2/24/2009 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/20/2009 at 7:41:18 PM. Contact: ###-####. needs hillside ord final
|
BLD-Grading Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | DONE |
Terry Records
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 10/6/2008 | 10/7/2008 | 10/7/2008 | P | PASS |
Dave Hannah
|
|
|
monica Phone #: ###-####
|
BLD-Framing/Rough-in | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | FAIL |
Mike Jordan
|
|
|
monica Phone #: ###-####. Complete lateral bracing on all T6 and T7 trusses. Install correct header over window were LVL sits. Strap top plate at plumbing penetration and beam at front entry. Check for air seal on energy code. ok to insul.
|
BLD-Framing/Rough-in | 9/22/2008 | 9/23/2008 | 9/23/2008 | P | PART |
Dave Hannah
|
|
|
monica Phone #: ###-#### ok to cover ext
|
BLD-Other | 9/18/2008 | 9/19/2008 | 9/20/2008 | A | FAIL |
Dave Hannah
|
|
|
monica Note: shear Phone #: ###-#### need to go over shear pannels and stapel per plans
|
BLD-Conference | 9/16/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Dave Hannah
|
|
|
monica Phone #: ###-####
|
BLD-Other | 8/4/2008 | 8/4/2008 | 8/5/2008 | P | CANC |
Dave Hannah
|
|
|
Verify that guest suite complys with approved plans for elevation and setbacks. all per plans
|
BLD-Foundation | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/11/2008 at 6:56:41 PM. Contact: ###-####.
|
BLD-Footing | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/9/2008 at 10:01:46 PM. Contact: ###-####.
|
PubWorks Subgrade Approval | 6/10/2008 | 6/10/2008 | 6/10/2008 | | DONE |
Terry Records
|
|
|
footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | CANC |
Dave Hannah
|
|
|
logan Phone #: ###-#### cancelled by logan
|
Issue PAID IN FULL permit | | | 5/7/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/6/2008 | | DONE |
|
|
|
t/c w monica sorensen at ###-#### - permit ready and fees given - also need gc name and rce#
|
Plan assigned to (CDM) | 5/5/2008 | 5/5/2008 | 5/5/2008 | | DONE |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 5/5/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2008 | | |
|
|
|
|
Pending Assignment by SRZ | 4/24/2008 | | 5/5/2008 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/28/2008 | | 5/5/2008 | | PASS |
Carl D Madsen
|
|
|
|
Route to Impact Fee Review | 4/24/2008 | 4/29/2008 | 5/1/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - Erosion and Sediment | | | 4/28/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00342
|
Routing - FIRE | 4/28/2008 | | 4/28/2008 | | PASS |
Sam Rogers
|
|
|
No fire sprinklers are required (Nativa Terrace Sub, Lot 12, Block 6)
|
Routing - PUBLIC WORKS | 4/25/2008 | | 4/25/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 4/25/2008 | | 4/25/2008 | | PASS |
Joshua Johnson
|
|
|
Routed to Erosion Sediment Control
|
Routing - Addressing | 4/24/2008 | | 4/24/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/24/2008 | | 4/24/2008 | | PASS |
Terry Records
|
|
|
Approved as Category 1 by CFH08-00011
|
Application received | | 4/24/2008 | | | |
Tisha Gallop
|
|
|
|
Telephone call | | | | | |
|
|
|
Talked to client about reduced roof pitch on guest unit, ok from planning and grading standpoint, new elevations passed on to plan review
|