Permit NumberBLD08-00839
StatusFinaled
Name RAISTRICK CONSTRUCTION
Site Address 5421 W KENDALL ST
Project NameALL AMERICAN PUBLISHING
Customer Number 
ePlanReviewNo
Description
(ALL AMERICAN PUBLISHING) To expand a 11,910 square foot first floor tenant into adjacent 4,656 square foot spaces to create 16,566 square foot lease space on the first floor per approved plans. Work to include, removal on interior nonbearing partitions, and construction of new interior nonbearing partitions to create a new conference room, create openings in existing interior nonbearing partition walls to allow passage from one space to the next, relocate existing ducks and diffusers, install new lighting in the conference room, new electrical work in relation to conference room, add suspended ceiling in new conference room, and interior finishes in compliance with chapter 8 of the 2006 IBC. This building is NOT fire sprinklered, NO WORK TO OCCUR ON THE SECOND FLOOR.**TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20083/12/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 10/9/200811/7/2008 DONE
Permanent Occupancy  10/9/2008 DONE
DetailsTisha Gallop
BLD-Final10/7/200810/7/200810/8/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/7/2008 at 8:43:14 AM. Contact: ###-####.ok for perm occ
FIRE-Final Inspection10/7/200810/7/200810/7/2008PPASS
DetailsTroy Cobbley
New double doors were installed. Life safety completed. See last inspection notes. KR
BLD-Final6/17/20086/17/20086/17/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/17/2008 at 6:20:43 AM. Contact: ###-####.
temp ok,, need lever door hardware on new door and f/l/s final concerns
FIRE-Final Inspection6/16/20086/16/20086/16/2008PPART
DetailsTroy Cobbley
A temporary occupancy was given with dave hannimans permission until the double doors are installed.
BLD-Framing/Rough-in5/16/20085/16/20085/16/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/16/2008 at 7:18:40 AM. Contact: ###-####.walls around new office area ok to cover after elec r/i is oked
CHANGE STATUS TO (ISS)  5/7/2008  
(F) Reprint permit  5/7/2008 DONE
Print Occupancy Form  4/25/2008  
Telephone call  4/25/2008 DONE
t/c w ian shewring at ###-#### - permit ready and fees given
Permit Ready to Issue  4/25/2008 DONE
1st review completed  4/24/2008 PASS
Recd Pcfee & Taken To Pln CK  4/24/2008 DONE
DetailsBethany Sullins
Plans ACCEPTED BY PLAN TECH  4/24/2008  
DetailsTisha Gallop
Plan assigned to (R_H)4/24/2008 4/24/2008 DEFR
DetailsTim L. Woodard
Transfered review to Tim Woodard
Plan assigned to (TLW)4/24/2008 4/24/2008 PASS
DetailsTim L. Woodard
4/24/2008 15:23:28 TLW - activity updated through activity BLDA022 from case BLD08-00839.
Routing - PLAN CHECK4/24/2008 4/24/2008 PASS
DetailsTim L. Woodard
Fire Ex. are to be provided in Compliance with 2006 IFC
Routing - FIRE  4/24/2008 PASS
Building is required to comply with 2006 IFC. This will be field verified.
PLANS/APPL TAKEN TO FRONT DESK  4/24/2008 DONE
Case Summary (BLD)  4/24/2008 DONE
Application received 4/24/2008  DONE
DetailsBethany Sullins