Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00854
StatusFinaled
Name EKC INC
Site Address 503 S AMERICANA BLVD
Project Name 
Customer Number 
ePlanReviewNo
Description
(ELLSWORTH KINCAID CONSTRUCTION, INC.) This building is NOT fire sprinklered. To remodel an existing 4,136 square foot building. Work is to include interior nonbearing walls, interior doors, interior windows, a new exterior window, millwork, and finishes. The existing accessible restrooms were created under permit BLD98-01754. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/200812/3/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 9/3/20089/22/2008 DONE
Permanent Occupancy UNPAID FEE  9/3/2008 DONE
DetailsTisha Gallop
BLD-Final8/28/20088/29/20088/29/2008APASS
DetailsDave Hannah
Phone #: ###-#### ok for perm occ
Code Occupancy Approval  8/27/2008 DONE
BLD-Final8/18/20088/19/20088/19/2008PNR
DetailsMike Jordan
larry Phone #: ###-####. Contacted Larry w/EKC to see if code enforcement issues have been resolved. Larry noted that they were not and may have to post a bond. Will call and reschedule.
FIRE-Final Inspection8/18/20088/19/20088/19/2008APASS
DetailsForrest France
Noted corrections verified for compliance, life safety inspection passed.
BLD-Framing/Rough-in8/18/20088/19/20088/19/2008ACANC
DetailsDave Hannah
larry Phone #: ###-####
Code Occupancy Approval  8/19/2008 FAIL
Staff went out on site to examine the improvements. The applicant has installed a vinyl window as opposed to a metal encasement window as stated in CZC08-00057. Also, the applicant does not have the parking striped per the approved plans and has an unauthorized razor wire fence that has been installed which interferes with the site circulation. To remedy the situation, the applicant is going to submit a new CZC showing the gate (to be opened during operating hours), will stripe the parking to match the submitted site plan, and will modify the CZC to reflect that the window will be vinyl as opposed to metal. Once this has been completed, staff will reinspect the site for final approval.
FIRE-Final Inspection8/18/20088/18/20088/18/2008PFAIL
DetailsForrest France
Provide approved hardware at several locations throughout including office and restroom doors, install additonal exit sign/EM light as discussed or provide compliant hardware at the horizontal slider door at the warehouse area.
FIRE-Final Inspection8/15/20088/18/20088/18/2008ACANC
DetailsForrest France
Larry- fire life safety Phone #: ###-####
BLD-Final8/15/20088/18/20088/18/2008PCANC
DetailsDave Hannah
Larry Phone #: ###-####
BLD-Framing/Rough-in7/11/20087/11/20087/11/2008PPASS
DetailsDave Hannah
larry Phone #: ###-#### ok to cover walls
Issue PAID IN FULL permit  6/11/2008 DONE
Print Occupancy Form  6/5/2008 DONE
Details
Telephone call  6/5/2008 DONE
Details
t/c w doug cooper at ###-#### - permit ready and fees given
Permit Ready to Issue  6/5/2008 DONE
Details
Routing - PLAN CHECK5/19/2008 6/4/2008 PASS
DetailsCarl Westfall
Drawings approved after the resubittal review.
Plan assigned to (CJW)4/28/2008 6/4/2008 PASS
DetailsCarl Westfall
6/4/2008 16:28:23 CJW - activity updated through activity BLDA022 from case BLD08-00854.
PLANS/APPL TAKEN TO FRONT DESK  6/4/2008 DONE
Plan resubmittals received  5/29/2008 DONE
received 1 response,1 sturctural calc, and 2 copies of sheets A2.1,A2.3,A7.0,A8.0,S1.0 taken to Carl W.
Routing - FIRE5/15/20085/15/20085/19/2008 PASS
DetailsScott Arellano
See fire plan review notes.
1st review completed  5/19/2008 FAIL
Failed Plan Check
Route to Impact Fee Review5/15/20085/20/20085/15/2008 PASS
DetailsCindy M. Gould
tenet improvement no impact fees
Routing - PLAN CHECK4/28/2008 5/15/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 13, 2008 and was finished on May 15, 2008. Revised drawings and additional information was required. See the plan review report.
Routing - PLANNING4/28/2008 4/28/2008 PASS
DetailsAndrea Tuning
Approved per CZC08-00057. ANT
Routing - PUBLIC WORKS4/28/2008 4/28/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating4/28/2008 4/28/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS4/25/2008 4/28/2008 DONE
DetailsMarlene Southard
4/28/2008 09:49:10 MYS - activity updated through activity BLDA172 from case BLD08-00854.
Plans ACCEPTED BY PLAN TECH  4/25/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  4/25/2008 DONE
DetailsTisha Gallop
Application received 4/25/2008   
DetailsTisha Gallop