BLD-Final | 10/8/2008 | 10/9/2008 | 10/9/2008 | A | PASS |
Mike Jordan
|
|
|
michael - Phone #: ###-####
|
DOC - Permit Finaled | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Mike Jordan
|
|
|
Cert. of occ. issued. Verified all signatures. Final insp. ok.
|
Code Occupancy Approval | | | 10/8/2008 | | DONE |
|
|
|
|
BLD-Final | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | NR |
Dave Hannah
|
|
|
mike Phone #: ###-#### needs zoning final
|
BLD-Framing/Rough-in | 6/2/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Dave Hannah
|
|
|
mike Phone #: ###-#### also ext perm insulation around foundation ok to back fill
|
Issue PAID IN FULL permit | | | 5/22/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/20/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/20/2008 | | DONE |
|
|
|
left vm for michael pickett at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/20/2008 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/14/2008 | 5/14/2008 | 5/19/2008 | P | DONE |
Perry Paine
|
|
|
5/19/2008 16:45:17 PEP - activity updated through activity BLDA022 from case BLD08-00857.
|
Plan assigned to (PEP) | 4/25/2008 | 4/25/2008 | 5/19/2008 | | PASS |
Perry Paine
|
|
|
5/19/2008 16:45:16 PEP - activity updated through activity BLDA022 from case BLD08-00857.
|
Case Summary (BLD) | | | 5/19/2008 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/19/2008 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2008 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 5/1/2008 | 5/1/2008 | 5/1/2008 | A | CANC |
Perry Paine
|
|
|
need MIS08-00075 inspection by 415
|
Telephone call | | | 4/30/2008 | | DONE |
|
|
|
called Michael to tell him tha after meeting with George Slane he is reuired to get a MIS permit to determine requirements for proceeding from the existing condition...Work done without approvals.
|
Routing - PLANNING | 4/28/2008 | | 4/28/2008 | | PASS |
David Moser
|
|
|
CAA08-00018 David Moser, Approved as redlined - the 9' wide driveway with 3' landscape area off of Bannock shall be paved. The 16' wide driveway for the alley load accessory bldg shall be paved. Routed to Public Works on 4-28-08
|
Routing - Addressing | 4/25/2008 | | 4/25/2008 | | PASS |
Chris Pichardo
|
|
|
|
Application received | | 4/25/2008 | | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/28/2008 | | | | |
|
|
|
|
Routing - PLAN CHECK | | | | | |
Perry Paine
|
|
|
Perry Paine
|