Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00870
StatusIssued
Name BOOMERANG BUILDING COMPANY
Site Address 1450 S EAGLE FLIGHT WAY Unit: 200
Project Name 
Customer Number 
ePlanReviewNo
Description
(Solution Pro)(Ste # 200) To remodel a 446 square foot area located with in a 10,046 square foot second floor office tenant space. Work to include: removal of suspended ceilings and related lighting, miscellaneous related interior finishes, construction of raised floor and stairs off that area adjacent to double doors and installation of new handrails per section 1012 of the 2006 IBC. This building is fully fire sprinklered per NFPA 13 to substitute for rated corridors. Any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/17/20159/18/20159/18/2015APEND
DetailsJim Sly
Need fire final.
BLD-Aging Inspection9/16/20159/16/20159/17/2015 CANC
DetailsJim Sly
BLD-Aging Inspection4/16/20154/16/20154/16/2015 PEND
DetailsMike Jordan
pending fire.
BLD-Aging Inspection7/24/20147/24/20147/25/2014 PEND
DetailsMike Jordan
BLD-Aging Inspection2/7/20132/7/20132/8/2013 PEND
DetailsMike Jordan
BLD-Aging Inspection10/30/201210/30/201210/31/2012 PEND
DetailsMike Jordan
PEnding fire.
BLD-Aging Inspection7/30/20127/30/20127/30/2012 PEND
DetailsMike Jordan
FIRE-Conference3/6/20123/6/20123/14/2012PDONE
DetailsTroy Cobbley
I spoke to Mark, with Allied General, today at another job site and he stated that he had spoken to Ken and they were in the process of getting the permit taken care of. I scheduled a folowup inspection for two weeks from now.
FIRE-Conference3/7/20123/7/20123/7/2012PDONE
DetailsTroy Cobbley
I spoke to Mark ###-####, at Allied General, about getting a fire permit for the work that has been performed. He stated that he would follow up on the work and get a permit .
BLD-Aging Inspection1/9/20121/9/20121/10/2012 PEND
DetailsMike Jordan
FIRE-Conference8/31/20119/1/20119/6/2011ADONE
DetailsTroy Cobbley
I left message for Ken at Allied General and also spoke to Todd at Solution Pro about getting the fire alarm permit for this project. I set up a follow up inspection for two weeks from today.
BLD-Aging Inspection2/3/20112/3/20112/4/2011 PEND
DetailsMike Jordan
Pending life/safety final.
BLD-Aging Inspection11/25/201011/25/201011/29/2010 PEND
DetailsMike Jordan
FIRE-Final Inspection6/27/20086/27/20086/27/2008PFAIL
DetailsForrest France
A sprinkler permit was pulled to relocate heads FIR08-00272 and has been passed. A smoke detector was relocate without a permit by Allied General. They will be pulling a quick permit for testing before we can final life safety on building permit. KR
BLD-Other6/26/20086/27/20086/27/2008ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/26/2008 at 1:32:19 PM. Contact: ###-####. Spoke to contractor, noted that he needed a life safety insp. and that it did not appear that permits for sprinkler and alarm work were not obtained.
Case Summary (BLD)  6/25/2008  
BLD-Final6/23/20086/24/20086/24/2008PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/23/2008 at 1:28:07 PM. Needs Fire/Life/Safety finals. Contacted Eric and left message.
BLD-Framing/Rough-in5/12/20085/12/20085/12/2008PPASS
DetailsMike Jordan
todd Phone #: ###-####. Steel stud for interior framed wall for meck. room add on.
Telephone call  5/5/2008 DONE
t/c w eric ruppel at ###-#### - permit ready and fees given
Permit Ready to Issue  5/5/2008 DONE
Issue PAID IN FULL permit  5/5/2008 DONE
Application received 4/28/20085/2/2008 DONE
DetailsTim L. Woodard
Plan assigned to (R_H)4/28/20084/28/20085/2/2008 DEFR
DetailsTim L. Woodard
Review Deffered to Tim Woodard
Plan assigned to (TLW)4/30/2008 5/2/2008 PASS
DetailsTim L. Woodard
5/2/2008 10:23:38 TLW - activity updated through activity BLDA022 from case BLD08-00870.
Routing - FIRE  5/2/2008 PASS
2006 IFC requirements to be verified in field.
1st review completed  5/2/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/2/2008 DONE
Inspection Record Card- Bld  5/2/2008 DONE
Plans ACCEPTED BY PLAN TECH  4/28/2008  
Recd Pcfee & Taken To Pln CK  4/28/2008  
FIRE-Conference1/15/20141/15/2014 P 
DetailsTroy Cobbley
Could you check this out and see if it is resolved so we can close permit?
FIRE-Conference3/14/20123/28/2012 A 
DetailsTroy Cobbley
Please check on this and let Barb @ permit desk know status-want to try to close out permit-Thanks
FIRE-Conference9/6/201111/3/2011 A 
DetailsTroy Cobbley
Follow up on conversation with Todd at Solution Pro. Could you please this and see if it ever was resolved? BARB @ Permit Desk Phone #: ###-####