Permit Information
Permit NumberBLD08-00890
StatusFinaled
Name NORTHWEST TECHNOLOGIES
Site Address 11911 W FRANKLIN RD
Project NameNorthwest Technologies Inc
Customer Number 
ePlanReviewNo
Description
(NORTHWEST TECHNOLOGIES INC) (CUP06-00014) These buildings are NOT fire sprinklered. To convert a single family dwelling to an office building and to construct a 580 square foot addition. After the addition, this building will have a total floor area of about 2,962 square feet. Work is to include 2 restrooms accessible to the disabled, brick veneer, exterior windows, exterior doors, interior nonbearing walls, interior doors, millwork, and finishes. The new addition includes concrete footings, concrete foundations, wood floor, wood exterior walls, exterior brick veneer, exterior plaster, glass block masonry, wood trusses, wood roof deck, and asphalt shingles. A 922 square foot garage/shop building will also be constructed under this permit. Work is to include concrete footings, concrete foundations, concrete slab on grade, wood exterior walls, wood trusses, wood roof sheathing, and asphalt shingles. A structural concrete slab will be placed over an existing concrete well vault. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/4/20081/2/2009 DONE
BLD-Final12/4/200812/4/200812/4/2008PPASS
DetailsJim Sly
Brett ###-####
OK for Perm Occ.
BLD-Final12/3/200812/4/200812/4/2008ANR
DetailsJim Sly
brett Phone #: ###-####
FIRE-Final Inspection12/2/200812/4/200812/4/2008APASS
DetailsTroy Cobbley
Life safety passed
Routing Walk-In (BLD)12/4/200812/4/200812/4/2008PPASS
DetailsSusan Riggs
12/4/2008 13:19:48 SAR - activity updated through activity BLDI252 from case BLD08-00890. Did site inspection to day for compliance with CUP08-00014. Everything look good.
Permanent Occupancy  12/4/2008 DONE
BLD-Final12/2/200812/3/200812/3/2008ANR
DetailsJim Sly
Bert Phone #: ###-####
Need Zoning....
Meeting  12/3/2008 DONE
The following email was received 12/2/08 from the project civil engineer: "Randy,
As you requested, I spoke with Sam Rogers of Boise City Fire Review regarding the storm drain size for the south portion of the site that contains the fire department turnaround. I am also copying him on this message. I stated that the storm drain system receiving water from this area should have enough capacity to handle the stormwater runoff, even after the turnaround is paved. The runoff coefficient used in this area is conservative enough to be representative of both asphalt and gravel when
compared to the rest of the undeveloped portion in this drainage area. Per Sam's request, I left a detailed voicemail message with Jim Wiley of Public Works that states the same thing.
In talking to Sam, it is my understanding that the City is requiring the turnaround to be paved as shown on the architectural plans.
Please call with any questions. Thanks,
Lance Warnick
Treasure Valley Engineers, Inc.
1204 6th Street North
Nampa, Idaho 83687
Phone: ###-####
Fax: ###-####
PubWorks Occupancy Approval12/2/200812/2/200812/2/2008 DONE
DetailsTiffany Lowery
Project final inspection completed by R. Rokovitz.
Meeting  12/2/2008 DONE
I met with PW's, Jim Wiley. He's not sure how the civil plans became separated from the building plans, but he determined the runoff/drainage bed was sized based on a runoff coefficient for gravel, and indicated the engineer would need to provide confirmation that the bed design is adequate for a paved runoff surface or submit plans to modify the bed. I subsequently relayed this information to the architect and then to the engineer, Lance Warnick, TV Engineers. Lance indicated he oversized the bed so it would be large enough in the event they decided to pave the roadway, so it will not need to be rebuilt. He agreed to contact Jim Willey to discuss what documentation public works will need for their approval of the change to pavement.
Telephone call  12/2/2008 DONE
Received call from Dave Holman, owner NW industries, ###-####. He is ready to lay pavement tomorrow morning. I confirmed that would be satisfactory to PDS/Fire to pave the roadway to meet our requirements, based on the telephone confirmation I had from the Engineer, Lance Warnick, who indicated that the pavement will not create a need to redesign the runoff retention bed. However, I told him that the engineer still needs to submit proper verification to Public Works to get their approval of the modification (paved surface).
Meeting  12/1/2008 DONE
Met with Mark Senteno, Fire Marshal, to see if we will allow a time frame for paving. We called a large asphalt contractor who indicated they are still laying asphalt and will continue doing so until overnight temps are in the 20's consecutively for several nights. Work is slow now, so they can do jobs quickly at this time and they have asphalt supplies in stock. Therefore, we expect the paving work to be completed at this time, as shown on the approved Building plans, rather than waiting until Spring.
I also checked with Terry Records, PW's, who found the Civil plans on OnBase showing that Bryan M had reviewed and approved the Civil plans 5/13/08 for Drainage, with a gravel surface shown on the civil plans. Apparently all civil plans were removed from the building plan sets and issued by PW's separately, as they were not routed on to the Building dept for approval.
FIRE-Final Inspection11/25/200811/26/200811/26/2008PFAIL
DetailsTroy Cobbley
See the city approved drawings, sheet A0.0 for the written correction notice which includes deadbolts need to be removed, exit discharge lighting required, building address required, provide sticker at the main exit and provide complete paving and curbing of the fire dept turn around.
Telephone call  11/26/2008 DONE
Telcon from Dave Holman, contractor (###-####). He has approved Civil plans showing the FD turnaround extension without a paved surface. He showed those plans to our fire inspector, Troy Cobbley who also called me for approval to fail the inspection for the lack of paving. He can't get it paved in time for opening on Dec 5, and needs an extension. Since it appeared it was our oversight, I agreed we would work out a reasonable timeframe with him and I would discuss it with our Fire Marshal after the Thanksgiving holiday and get back in touch with him with the Fire Marshal's decision. (11/28/08- I subsequently pulled our copy of the issued plan set and found that the extension is clearly noted on sheet A1.0 "to be paved per FD requirements" and we do not have any Civil drawings in the BLD plan set. I advised Mark Senteno by phone message to contact me to discuss.
BLD-Conference11/19/200811/19/200811/19/2008PDONE
DetailsMike Jordan
burt Phone #: ###-#### Note:
BLD-Energy code compliance8/14/20088/15/20088/15/2008APASS
DetailsJim Sly
Tommy Phone #: ###-####
BLD-Energy code compliance8/14/20088/14/20088/14/2008PNR
DetailsMike Jordan
Tommy Phone #: ###-####
BLD-Conference8/1/20088/4/20088/4/2008ADONE
DetailsJim Sly
Craig Phone #: ###-####
BLD-Framing/Rough-in7/28/20087/28/20087/28/2008PPART
DetailsTom Arcoraci
craig - shear Phone #: ###-#### wip ok
BLD-Framing/Rough-in7/22/20087/23/20087/23/2008ANR
DetailsJim Sly
craig - shear Phone #: ###-####
Hold downs in wong place....not complete
BLD-Foundation7/11/20087/14/20087/16/2008PPART
DetailsMike Jordan
craig - pouring at 2:00 Phone #: ###-####
BLD-Foundation7/9/20087/10/20087/10/2008APART
DetailsJim Sly
Craig Phone #: ###-####
Wall at front addition OK
BLD-Foundation7/7/20087/8/20087/8/2008PPASS
DetailsTom Arcoraci
Craig- pouring at 2 Phone #: ###-#### footing ok
BLD-Conference6/30/20087/1/20087/1/2008ADONE
DetailsJim Sly
Craig Phone #: ###-####
Met with Craig.....Pre-Constr Conference.
Wanted to change exterior...ie. brick all the way up.....Need approval from Susan Riggs.
Issue PAID IN FULL permit  6/20/2008 DONE
Print Occupancy Form  6/19/2008 DONE
DetailsAlexandra L. DeYoung
Permit Ready to Issue  6/19/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  6/19/2008  
DetailsAlexandra L. DeYoung
called craig, permit ready, fees given
Routing - PLAN CHECK6/17/2008 6/18/2008 PASS
DetailsCarl Westfall
Plans taken to permit desk for issuance.
PLANS/APPL TAKEN TO FRONT DESK  6/18/2008 DONE
Plan assigned to (CJW)5/8/2008 6/18/2008 PASS
DetailsMarlene Southard
6/18/2008 15:34:56 MYS - activity updated through activity BLDA022 from case BLD08-00890.
Routing - FIRE6/17/2008 6/17/2008 PASS
DetailsKenneth R Roule
See fire plan review notes.
Routing - PLANNING6/12/2008 6/17/2008 PASS
DetailsSusan Riggs
Changes to exterior ramps and the accessible parking stall.
Routing - PUBLIC WORKS6/12/2008 6/12/2008 PASS
DetailsLouise Waldorf
Plumbing fixtures changes. Re-evaluate fees.: Updated credits 6-12-08 lw
Routing - PLAN CHECK6/4/2008 6/12/2008 PASS
DetailsCarl Westfall
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  6/11/2008  
DetailsCarl Westfall
Received 3 copies of Structural Calculations from Pinnacle,1 copy of response letter dated 6-10-08 from Architecture Northwest, 1 copy of United Water flow information, 2 copies of C1.0, C2.0, E-1, E-2, E-3, A-0.0, A-1.0, A-1.1, A-2.0, A-3.0, A-3.1, A-4.0, A-5.0, G-1.0 and taken to Carl Westfall///6-11-08 @ 8:30am BAS
Routing - PUBLIC WORKS6/4/2008 6/4/2008 PASS
DetailsBeverly Hall
Added fixtures and 2nd review by Solid Waste.
Routing - PLAN CHECK6/3/2008 6/4/2008  
Back to PW.
Routing PW Solid Waste6/4/2008 6/4/2008 PASS
DetailsPeter J. McCullough
Routing - FIRE6/2/20086/2/20086/3/2008 FAIL
DetailsKenneth R Roule
Faxed a copy of fire plan review to architect.
1st review completed  6/3/2008 FAIL
Failed Plan Check/ PW/ PW Solid Waste/ Fire
Route to Impact Fee Review6/2/20086/5/20086/2/2008 PASS
DetailsCindy M. Gould
Routing - PLAN CHECK5/19/2008 6/2/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 23, 2008 and was finished on June 2, 2008. Revised drawings were required. See the plan review report.
Plan resubmittals received  5/20/2008  
DetailsCarl Westfall
Received 3 copies of sheet A1.1 and taken to Carl Westfall 5-20-08 @ 10:33am BAS
Routing - PLANNING5/14/2008 5/19/2008 PASS
DetailsSusan Riggs
CUP06-00014
The applicant has approval to upgrade to brick veneer. SR
Plan resubmittals received  5/16/2008  
DetailsTisha Gallop
Received three copies of sheet A-1.0; inserted by LEG and taken back to Susan Riggs
Plan resubmittals received  5/14/2008  
Details
Received 3 copies of sheet A-1.0 (Site Plan) and taken and attached to plans in Susan Riggs office///5-14-08 @ 3:11pm BAS
Routing - PLANNING Land Div5/13/2008 5/14/2008 PASS
DetailsDave Abo
Parcel A2 on ROS04-00032. Record of Survey recorded as #6534.
Routing - Erosion and Sediment5/14/2008 5/14/2008 PASS
DetailsSteven Webb
ESC approved with attached conditions. ESC08-00361
Routing - PUBLIC WORKS5/1/2008 5/13/2008 FAIL
DetailsConnie Baumgartner
Routing PW Drainage5/5/2008 5/13/2008 PASS
DetailsBrian Murphy
Routing PW Solid Waste5/13/2008 5/13/2008 FAIL
DetailsPeter J. McCullough
Increase width of trash enclosure gate opening to 12'. Ensure gates of enclosure are shown to open 120 degrees.

Peter McCullough, ###-####.
Routing PW Sewer Rating5/12/2008 5/13/2008 PASS
DetailsConnie Baumgartner
Pending Assignment by MYS4/29/2008 5/8/2008 DONE
DetailsMarlene Southard
5/8/2008 16:34:56 MYS - activity updated through activity BLDA172 from case BLD08-00890.
Routing PW Street Lights5/2/2008 5/2/2008 PASS
DetailsBill Colson
Plans ACCEPTED BY PLAN TECH  4/30/2008  
DetailsMarsha Smylie
Application received 4/29/2008