Permit Information
Permit NumberBLD08-00893
StatusFinaled
Name LIQUID LOUNGE - SHELL - RESTROOMS
Site Address 405 S 8TH ST Unit: 121
Project NameLIQUID LOUNGE
Customer Number 
ePlanReviewNo
Description
(LIQUID LOUNGE - 8TH STREET MARKETPLACE - BUILDING 405 - FORMER SUITE 121 - RESTROOMS) Fire sprinklers substitute for 1-hr. To construct restrooms within an existing tenant space in preparation for a future assembly tenant. In addition, to install a new exterior door that will serve a future deck that will be constructed under permit BLD08-00894. A compliant landing and threshold on the exterior side of the new exterior door is required to be provided under that permit. Work under this permit is to include a Men's restroom and a Women's restroom accessible to the disabled, an exterior glass door with a compliant landing and threshold on the inside, glass sidelights next to the new exterior door, and interior restroom finishes. This permit is a tenant shell permit. This permit does NOT establish a Certificate of Occupancy for any tenant. A future tenant improvement permit is required to establish occupancy. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20083/12/2009 DONE
DetailsAlexandra L. DeYoung
Second Notice has not been responded to.
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Case Summary (BLD)  12/22/2008 DONE
First Notice9/15/20089/15/200811/7/2008 DONE
DetailsDave Hannah
BLD-Final9/12/20089/12/20089/15/2008PPASS
DetailsDave Hannah
boyd Note: if possible between 11:00 and 1:30 please Phone #: ###-####
DOC - Permit Finaled9/15/20089/15/20089/15/2008PPASS
DetailsDave Hannah
BLD-Framing/Rough-in9/12/20089/12/20089/12/2008PPASS
DetailsDave Hannah
rick Phone #: ###-####
BLD-Final9/11/20089/12/20089/12/2008ADEFR
DetailsDave Hannah
boyd Note: if possible between 11:00 and 1:30 please Phone #: ###-#### rescheduled for pm
BLD-Framing/Rough-in9/11/20089/12/20089/12/2008ADEFR
DetailsDave Hannah
rick Phone #: ###-#### rescheduled for pm
FIRE-Final Inspection9/11/20089/12/20089/12/2008APASS
DetailsForrest France
Shell and restroom remodel fire life safety passed.
FIRE-Conference9/10/20089/10/20089/10/2008ADONE
DetailsForrest France
On site visit regarding project fire life safety requirements, fire code review notes, and details related to fire alarm and sprinkler work.
BLD-Framing/Rough-in7/25/20087/28/20087/28/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/25/2008 at 4:36:20 PM. Contact: ###-####. pending ele aproval
FIRE-Final Inspection7/24/20087/25/20087/25/2008ACANC
DetailsForrest France
Gary- fire life safety and sprinkler Phone #: ###-#### Wrong permit number called in for inspection, intended for a different project altogether.
Inspection Record Card- Bld  7/17/2008 DONE
Details
Telephone call  7/17/2008 DONE
Details
t/c w teagan at ###-#### - permit ready and fees given
Permit Ready to Issue  7/17/2008 DONE
Details
Issue PAID IN FULL permit  7/17/2008 DONE
Plan assigned to (CJW)5/1/2008 7/16/2008 PASS
DetailsMarlene Southard
7/16/2008 11:51:30 MYS - activity updated through activity BLDA022 from case BLD08-00893.
Routing - PLUMBING7/11/2008 7/16/2008 PASS
DetailsBill VanDegrift
no fixture schedule provided, based on the water pipe sizing, tank type toilets will be required. additional fixtures must not overload existing plumbing system.
Routing - PLAN CHECK7/16/2008 7/16/2008 PASS
DetailsCarl Westfall
Prep plans for permit issuance and forwarded to permit desk.
PLANS/APPL TAKEN TO FRONT DESK  7/16/2008 DONE
Routing - PLAN CHECK5/21/2008 7/11/2008 PASS
DetailsCarl Westfall
(7-3-08) Completed the resubmittal review. 3 items not resolved. E-mailed list to Tegan. (7-11-08) Completed the next resubmittal review. Drawings approved.
Plan resubmittals received  7/10/2008 DONE
received 1 transmittal,and 2 copies of sheet M1.00 taken to Carl W.
Plan resubmittals received  7/9/2008  
received letter of transmittal from erstad arch (3) pages, & "2" sets each of aO.O1, a2.10, a6.10, m1.00--plans taken to Carl Westfall
Plan resubmittals received  7/1/2008  
DetailsCarl Westfall
Received transmittal, two copies of structural calculations, two copies of sheets a0.01, a2.01, a2.10, a2.20, a2.30, a6.10; taken to Carl Westfall
Routing - FIRE5/20/20085/20/20085/21/2008 PASS
DetailsScott Arellano
This will be a field verify. No plan notes attached.
1st review completed  5/21/2008 FAIL
Route to Impact Fee Review5/20/20085/23/20085/20/2008 PASS
DetailsCindy M. Gould
No fees
Routing - PLAN CHECK5/6/2008 5/20/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 15, 2008 and was finished on May 20, 2008. Revised drawings were required. See the plan review report.
Routing - PLANNING5/2/2008 5/6/2008 PASS
DetailsJulie Archambeault
DRH08-00108
Routing - PUBLIC WORKS5/1/2008 5/2/2008 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating5/2/2008 5/2/2008 PASS
DetailsConnie Baumgartner
Pending Assignment by MYS4/30/2008 5/1/2008 DONE
DetailsMarlene Southard
5/1/2008 14:18:35 MYS - activity updated through activity BLDA172 from case BLD08-00893.
Application received 4/30/20084/30/2008 DONE
DetailsMarsha Smylie
Recd Pcfee & Taken To Pln CK  4/30/2008 DONE
DetailsMarsha Smylie
Plans ACCEPTED BY PLAN TECH  4/30/2008 DONE
DetailsBethany Sullins
Verified with Steve Webb No ESC required for this part of the project, although the future project of deck will require one///4-30-08 BAS