Permit Information
Permit NumberBLD08-00894
StatusFinaled
Name LIQUID LOUNGE
Site Address 405 S 8TH ST Unit: 121
Project Name8TH STREET MARKETPLACE
Customer Number 
ePlanReviewNo
Description
NEED CERTIFIED RP PRIOR TO ISSUANCE. (THE LIQUID LOUNGE - 8TH STREET MARKETPLACE - BUILDING 405 - FORMER SUITE 121) Fire sprinklers substitute for 1-hr. To prepare an existing assembly tenant space for a new assembly tenant. A new 673 square foot exterior deck will also be constructed under this permit. The total area of this tenant space will be 4,362 square feet (3,689 square feet inside and 673 square feet on the deck). The restrooms within this tenant space were constructed under permit BLD08-00893. The door to serve the deck was also installed under that permit. For the deck, work is to include wood stud pony walls, concrete stem walls, a wood ledger, wood joists, composite decking, and guards. A new bar will be installed inside this tenant space. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20082/2/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to. NOTE: address no longer exist and the telephone has too many phone calls
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 9/19/200811/7/2008 DONE
BLD-Final9/18/20089/19/20089/20/2008PPASS
DetailsDave Hannah
Jeremy ###-#### ok for perm occ
FIRE-Final Inspection9/18/20089/19/20089/19/2008PPASS
DetailsForrest France
Fire life safety completed. KR
Code Occupancy Approval9/19/20089/19/20089/19/2008PPASS
DetailsJoe R Venneman
Code Occupancy Approval  9/19/2008 DONE
Pass
Permanent Occupancy UNPAID FEE  9/19/2008 DONE
DetailsBarbara Stitt
Print Occupancy Form  9/9/2008 DONE
BLD-Framing/Rough-in9/5/20089/8/20089/8/2008APASS
DetailsDave Hannah
jeff Phone #: ###-#### ok to cover deck
BLD-Foundation9/3/20089/4/20089/4/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/3/2008 at 4:25:24 PM. Contact: ###-####.
BLD-Foundation9/2/20089/3/20089/3/2008PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/2/2008 at 2:36:42 PM. Contact: ###-####.
BLD-Footing9/2/20089/3/20089/3/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/2/2008 at 2:36:15 PM. Contact: ###-####.
Telephone call  7/24/2008 DONE
Details
left vm for tegan bohannan at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  7/24/2008 DONE
Details
Issue PAID IN FULL permit  7/24/2008 DONE
Plan assigned to (CJW)5/1/2008 7/23/2008 PASS
DetailsCarl Westfall
7/23/2008 15:18:47 CJW - activity updated through activity BLDA022 from case BLD08-00894.
Routing - PLUMBING7/21/2008 7/23/2008 PASS
DetailsBill VanDegrift
additional cross connection protection may be required.
Routing - PLAN CHECK7/23/2008 7/23/2008 DONE
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  7/23/2008 DONE
Print Occupancy Form  7/23/2008 DONE
Routing - PLAN CHECK5/29/2008 7/21/2008 PASS
DetailsCarl Westfall
(7-8-08) Completed the resubmittal review. Several items were not resolved. E-mailed the correction list to the Archtiect's rep. (7-11-08) Started the resubmittal review but didn't have enough time to finsh it. (7-21-08) Finished the resubmittal review. The drawings were approved with "red lines".
Plan resubmittals received  7/9/2008  
received letter of transmittal from erstad arch & letter from colliers international (2) pages & a fax from treasure valley engineers--also "3" sheets each of a2.10, a2.20, & a5.10 ---plans taken to Carl Westfall
Plan resubmittals received  7/1/2008  
DetailsCarl Westfall
Received transmittal, two copies of structural calculations, two copies of sheets a0.01, a1.10, a2.01, a2.10, a2.20, a5.10, a6.10; taken to Carl Westfall
Routing - FIRE5/23/20085/23/20085/29/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  5/29/2008 FAIL
Failed Plan Check
Route to Impact Fee Review5/23/20085/29/20085/23/2008 PASS
DetailsCindy M. Gould
No impact fees commerical prior to 5/1
Routing - PLAN CHECK5/6/2008 5/23/2008 FAIL
DetailsCarl Westfall
The IBC plan review was started on May 20, 2008 and was finished on May 23, 2008. Revised drawings were required. See the plan review report.
Routing - PLANNING5/2/2008 5/6/2008 PASS
DetailsJulie Archambeault
DRH08-00108
Routing - Erosion and Sediment5/2/2008 5/2/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00364.
Routing PW Sewer Rating5/2/2008 5/2/2008 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS5/1/2008 5/2/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS4/30/2008 5/1/2008 DONE
DetailsMarlene Southard
5/1/2008 15:12:43 MYS - activity updated through activity BLDA172 from case BLD08-00894.
Application received 4/30/20084/30/2008 DONE
DetailsMarsha Smylie
Recd Pcfee & Taken To Pln CK  4/30/2008  
Plans ACCEPTED BY PLAN TECH  4/30/2008 DONE
DetailsBethany Sullins