Case Summary (BLD) | | | 5/21/2015 | | DONE |
|
|
|
|
First Notice | 8/19/2009 | 8/19/2009 | 8/25/2009 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 8/18/2009 | 8/19/2009 | 8/19/2009 | A | PASS |
Mike Jordan
|
|
|
Barbara-permits desk Phone #: ###-####
|
DOC - Permit Finaled | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | PASS |
Mike Jordan
|
|
|
Cert of completion was issued.
|
Zoning Approval | 8/14/2009 | 8/14/2009 | 8/14/2009 | | DONE |
Andrea Tuning
|
|
|
The applicant has completed the remaining landscaping and the bond may be released in full. ANT 8-14-09
|
BLD-Final | 2/9/2009 | 2/10/2009 | 2/10/2009 | A | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. Will issue cert. of completion when all other trades have signed perm.
|
BLD-Final | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | CANC |
Mike Jordan
|
|
|
andy Phone #: ###-####
|
FIRE-Final Inspection | 2/9/2009 | 2/9/2009 | 2/9/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 2/9/2009 | 2/9/2009 | 2/9/2009 | | DONE |
Andrea Tuning
|
|
|
The applicant has posted a bond for the remaining landscaping and submitted a DR MOD (CZC09-00020) for the fireplace within the east elevation.
|
BLD-Energy code compliance | 1/5/2009 | 1/5/2009 | 1/5/2009 | A | PASS |
Mike Jordan
|
|
|
EXterior walls ok.
|
BLD-Framing/Rough-in | 12/10/2008 | 12/10/2008 | 12/10/2008 | A | PART |
Mike Jordan
|
|
|
Exterior walls for shell. Needs plumbing and elec. ri insp. prior to cover.
|
BLD-Framing/Rough-in | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PASS |
Mike Jordan
|
|
|
Exterior wals ok to insulate. Noticed issues with handrails to mezz. Electrical panels placed were extensions will be. Needs to reverse panels or move panels.
|
BLD-Conference | 11/18/2008 | 11/18/2008 | 11/19/2008 | P | PASS |
Mike Jordan
|
|
|
wip on shell as well as ti.
|
BLD-Framing/Rough-in | 10/14/2008 | 10/14/2008 | 10/14/2008 | P | PART |
Mike Jordan
|
|
|
andy Phone #: ###-####. pend. mech. and plumbing.
|
BLD-Framing/Rough-in | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Mike Jordan
|
|
|
andy Note: need 1st in morning due roofer will be first thing Phone #: ###-####. Exterior shear nailing for walls and roof diaphragm only. ok to cover.
|
BLD-Conference | 9/5/2008 | 9/5/2008 | 9/5/2008 | P | DONE |
Mike Jordan
|
|
|
andy Note: please call 1/2 hr prior to inspection Phone #: ###-####
|
BLD-Conference | 8/18/2008 | 8/18/2008 | 8/18/2008 | P | DONE |
Mike Jordan
|
|
|
Stopped by to visit contractor, and to review reports and to see status of job. Contractor was not on site. Shell is in the framing stage.
|
Case Summary (BLD) | | | 8/15/2008 | | |
|
|
|
|
BLD-Foundation | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | PASS |
Jim Sly
|
|
|
andy - late morning please Phone #: ###-#### Called Eng of record...No Special insp req...OK
|
BLD-Footing | 7/3/2008 | 7/7/2008 | 7/7/2008 | A | PASS |
Mike Jordan
|
|
|
Andy Phone #: ###-####. Permieter footings footings ok. Noted job will have special insp Special insp. on site.
|
(F) Reprint permit | | | 6/24/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/23/2008 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/12/2008 | | DONE |
|
|
|
t/c w douglas oldham at ###-#### - permit ready and fees given - also need achd receipt and rp name
|
Permit Ready to Issue | | | 6/12/2008 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/1/2008 | | 6/11/2008 | | PASS |
John Menard
|
|
|
6/11/2008 11:40:06 JCM - activity updated through activity BLDA022 from case BLD08-00896.
|
Routing - Addressing | 5/2/2008 | | 6/11/2008 | | PASS |
Chris Pichardo
|
|
|
|
Routing - PLANNING | 6/10/2008 | | 6/11/2008 | | PASS |
Andrea Tuning
|
|
|
Approved per DRH08-00011 adn DRH08-00118.
|
Routing - PLAN CHECK | 6/11/2008 | | 6/11/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2008 | | DONE |
John Menard
|
|
|
|
Inspection Record Card- Bld | | | 6/11/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2008 | | 6/10/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan Reviewer's activity | | | 6/10/2008 | | PASS |
|
|
|
Reviewed and approved structural revisions. JCM
|
Routing PW Solid Waste | 6/10/2008 | | 6/10/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLAN CHECK | 5/27/2008 | | 6/10/2008 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 6/4/2008 | | |
|
|
|
received "3" sheets of A1.3-- plans taken back to John Menard- inserter is Jim Marsh
|
Plan resubmittals received | | | 5/29/2008 | | |
John Menard
|
|
|
Received 1 cover transmittal, 3 copies of response to plan review dated 5-22-08 from CTS, 3 copies of sheet S201 taken to John Menards desk///5-29-08 @ 1:10pm BAS
|
Routing - FIRE | 5/21/2008 | 5/21/2008 | 5/27/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 5/27/2008 | | FAIL |
|
|
|
Failed PW, Structural, Planning, Plan Check
|
Route to Impact Fee Review | 5/21/2008 | 5/27/2008 | 5/21/2008 | | PASS |
Cindy M. Gould
|
|
|
Commercial prior to 5/1
|
Plan resubmittals requested | | | 5/21/2008 | | DONE |
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing - PLAN CHECK | 5/16/2008 | | 5/21/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved plans with attached comment list and red lines. JCM
|
Plan Reviewer's activity | | | 5/21/2008 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review with items identified that may need to be addressed during the tenant improvement. JCM
|
Routing Off Site - STRUCTURAL | 5/1/2008 | | 5/16/2008 | | FAIL |
John Menard
|
|
|
called action courier at ###-#### for pickup - Received comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 5/15/2008 | | 5/15/2008 | | FAIL |
Andrea Tuning
|
|
|
DRH08-00011 and DRH08-00118 --Andrea Tuning
The applicant has two different site plans located within the building set. The applicant will be coming in to the office on Monday to insert plans that are consistent.
CUP08-00022 - Sue Cummings
|
Routing - PLUMBING | 5/13/2008 | | 5/15/2008 | | PASS |
Bill VanDegrift
|
|
|
note 1 page P1.01 these plumbing drawings have been submitted for review and are the only drawings approved. vent interceptor.
|
Routing PW Street Lights | 5/12/2008 | | 5/13/2008 | | PASS |
Bill Colson
|
|
|
|
Routing PW Sewer Rating | 5/13/2008 | | 5/13/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Solid Waste | | | 5/13/2008 | | FAIL |
Peter J. McCullough
|
|
|
Trash enclosure must be 12' by 12' ID, with a 12' gate opening.
Peter McCullough, ###-####.
|
Routing PW Environmental | | | 5/13/2008 | | PASS |
Walt Baumgartner
|
|
|
WestBoise Sewer Dist, OK. SHell only plans noted GI. Attached City approved design cutsheet to both sets. Final TI plans to be reviewed future date.
|
Routing - Erosion and Sediment | 5/13/2008 | | 5/13/2008 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC08-00365
|
Routing - PUBLIC WORKS | | | 5/13/2008 | | FAIL |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 5/5/2008 | | 5/12/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING Land Div | | | 5/2/2008 | | PASS |
Joan Johnson
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/1/2008 | | |
|
|
|
|
Pending Assignment by MYS | 4/30/2008 | | 5/1/2008 | | DONE |
John Menard
|
|
|
5/1/2008 11:25:48 JCM - activity updated through activity BLDA166 from case BLD08-00896.
|
Plan routing begun/NEW & ADDTN | | | 5/1/2008 | | |
Joan Johnson
|
|
|
|
Application received | | 4/30/2008 | | | |
|
|
|
|