Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD08-00910
StatusFinaled
Name HAUN GROUP INC
Site Address 5873 N COLLISTER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This permit is for a new single family dwelling with a daylight basement and an attached garage. The basement is made up of 588 sq. ft. living space and 795 sq. ft. garage. The basement living space contains one bedroom, one bathroom and a family room. The first story is 1476 sq. ft. with two bedrooms and two bathrooms with a kitchen. There is also a 18 sq. ft. covered front patio. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. Built per all approved plans, red lining and plan review report. No fire sprinklers required as per Sam Rogers with Fire. R-1B zoning district and building setbacks per Planning and Zoning. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/200811/7/200811/7/2008APASS
DetailsTony Young
harry Phone #: ###-####
c of o issued
DOC - Permit Finaled11/7/200811/7/200811/7/2008PPASS
DetailsTony Young
BLD-Final11/4/200811/4/200811/4/2008PNR
DetailsTony Young
harry Phone #: ###-####
need trades 1st,, called Harry to let him know,, no inspection made
BLD-Grading Inspection11/4/200811/4/200811/4/2008ADONE
DetailsTerry Records
Final grading and drainage approved
BLD-Energy code compliance7/28/20087/28/20087/28/2008PPASS
DetailsTony Young
harry - insulation Phone #: ###-####
BLD-Framing/Rough-in7/22/20087/23/20087/23/2008APASS
DetailsTony Young
Harry Phone #: ###-####
Case Summary (BLD)  7/16/2008 DONE
BLD-Conference6/30/20086/30/20086/30/2008PPART
DetailsTony Young
?s on frame,, looked at shear walls,, ok after more NAILING on front
BLD-Framing/Rough-in6/26/20086/30/20086/30/2008ACANC
DetailsTony Young
Harry Phone #: ###-####
BLD-Foundation6/3/20086/3/20086/3/2008PPART
DetailsTony Young
harry - wall Phone #: ###-####
basement walls, wip, 95% done
BLD-Footing5/28/20085/28/20085/28/2008PPASS
DetailsTom Arcoraci
harry Phone #: ###-####
Issue PAID IN FULL permit  5/19/2008 DONE
Route to Impact Fee Review5/1/20085/6/20085/14/2008 PASS
DetailsCindy M. Gould
Inspection Record Card- Bld  5/14/2008 DONE
Telephone call  5/14/2008 DONE
left vm for harry haun at ###-#### - permit ready and fees given
Permit Ready to Issue  5/14/2008 DONE
Plan assigned to (BSP)5/12/20085/12/20085/12/2008 PASS
DetailsBen S. Pavelka
5/12/2008 16:43:55 BSP - activity updated through activity BLDA022 from case BLD08-00910.
Case Summary (BLD)  5/12/2008 DONE
Case Summary (BLD)  5/12/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/12/2008 DONE
Routing - PLAN CHECK5/8/2008 5/12/2008 PASS
DetailsBen S. Pavelka
Plans ACCEPTED BY PLAN CHECK  5/12/2008  
DetailsBen S. Pavelka
Routing - FIRE5/6/2008 5/8/2008 PASS
DetailsScott Arellano
No fire sprinklers required. (Briarhill #3 sub)
Routing - PUBLIC WORKS5/5/2008 5/6/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING5/6/2008 5/6/2008 PASS
DetailsLucinda Grames
Routing - Erosion and Sediment5/6/2008 5/6/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS GRADING5/1/2008 5/5/2008 PASS
DetailsTerry Records
Approved as category 3
Case Summary (BLD)  5/1/2008 DONE
Routing - Addressing5/1/2008 5/1/2008 PASS
DetailsChris Pichardo
PubWorks Subgrade Approval5/28/20085/28/2008   
footing subgrade approved by the geotechnical engineer
Application received 5/1/2008  DONE
DetailsBethany Sullins