Third Notice BLD | 12/22/2008 | 12/22/2008 | 1/15/2009 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/22/2008 | 9/22/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/8/2008 | 9/22/2008 | | DONE |
|
|
|
|
BLD-Final | 8/7/2008 | 8/8/2008 | 8/8/2008 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 8/7/2008 at 3:09:13 PM. Contact: ###-####. ok for cof o
|
FIRE-Final Inspection | 8/7/2008 | 8/8/2008 | 8/8/2008 | A | PASS |
Forrest France
|
|
|
Corrections verified for compliance, shell permit finaled, duct detectors deleted due to cfm below 2000, life safety inspection passed.
|
Permanent Occupancy | | | 8/8/2008 | | |
|
|
|
|
FIRE-Final Inspection | 8/5/2008 | 8/6/2008 | 8/6/2008 | A | FAIL |
Troy Cobbley
|
|
|
The shell building permit needs finaled prior to this permit being finaled. Per Sam Rogers we do not need to reverify the elevator recall since it has been approved by the State of Idaho elevator inspector but the Area of Refuge still needs inspected. Those two items are required for the shell. Items found wrong on the tenant improvement include: Suite number needs to be provided, repair all of the exit signs and emergency lights as marked on sheet E1.0 and either install the duct dectors as discussed or remove them since they are not shown on the drawings and both units are less than 2,000 cfm and mount the fire extinguisher.
|
BLD-Other | 7/15/2008 | 7/16/2008 | 7/16/2008 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/15/2008 at 11:38:42 AM. Contact: ###-####.ceilling ok for cover.
|
BLD-Framing/Rough-in | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/23/2008 at 9:54:56 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/12/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2008 | | DONE |
|
|
|
t/c w trent koci at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/10/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/6/2008 | | 6/9/2008 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/9/2008 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/6/2008 | | 6/9/2008 | | PASS |
Carl Westfall
|
|
|
6/9/2008 12:09:07 CJW - activity updated through activity BLDA022 from case BLD08-00921.
|
Routing - FIRE | 6/5/2008 | 6/5/2008 | 6/6/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/6/2008 | | PASS |
|
|
|
|
Route to Impact Fee Review | 6/5/2008 | 6/10/2008 | 6/5/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 5/9/2008 | | 6/5/2008 | | PASS |
Carl Westfall
|
|
|
The IBC plan review was started on June 5, 2008 and finished the same day. The drawings were approved with "red lines". See the plan review report. The Architect did a superb job showing compliance with the Building Code on the drawings.
|
Routing - PLUMBING | 5/7/2008 | | 5/9/2008 | | PASS |
Bill VanDegrift
|
|
|
BFP-1 must be a max. of 5' AFF or approved service platform provided. This building has an existing premise backflow preventor, additional area isolation for this tenant is not required. 120 deg. max. hot water to public lavs.
|
Routing - PUBLIC WORKS | 5/6/2008 | | 5/7/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 5/7/2008 | | 5/7/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 5/2/2008 | | 5/6/2008 | | DONE |
Marlene Southard
|
|
|
5/6/2008 18:14:32 MYS - activity updated through activity BLDA172 from case BLD08-00921.
|
Plans ACCEPTED BY PLAN TECH | | | 5/2/2008 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/2/2008 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 5/2/2008 | | | |
Tisha Gallop
|
|
|
|