Permit Information
Permit NumberBLD08-00941
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 1880 W JUDITH LN 210
Project NameVIEWPOINT - LOT 14
Customer Number 
ePlanReviewNo
Description
(WELLS DENTAL - VIEWPOINT LOT 14 - STE 210) To finish a 3,084 square foot, Dental office tenant improvement on the Second floor of an existing two story office shell building. The shell building has been constructed under BLD07-02248. All construction per the approved plans and attached comment list. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. DRH07-00109 (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/11/200910/5/2009 DONE
Third Notice 9/28/200910/1/2009 DONE
Second Notice 9/17/20099/18/2009 DONE
First Notice 2/27/20099/17/2009 DONE
Print Occupancy Form  2/27/2009 DONE
Permanent Occupancy  2/27/2009 DONE
DetailsTisha Gallop
BLD-Aging Inspection2/24/20092/24/20092/24/2009 PASS
DetailsJim Storey
final ok
DOC - Permit Finaled2/24/20092/24/20092/24/2009PPASS
DetailsJim Storey
BLD-Final12/23/200812/23/200812/23/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/23/2008 at 8:08:15 AM. Contact: ###-####. final occ ok pending plm perm occ. sign off.
FIRE-Final Inspection12/16/200812/17/200812/17/2008APASS
DetailsForrest France
Correction items repaired and verified for functionality, fire life safety finaled.
FIRE-Final Inspection12/15/200812/16/200812/16/2008AFAIL
DetailsForrest France
Need to test the new door mag lock for drop out on fire alarm condition, four exit signs are not functional on backup power source, inspection concluded at this time-to be rescheduled.
Zoning Approval12/15/200812/15/200812/15/2008 PASS
DetailsJosh Wilson
FIRE-Final Inspection11/28/200811/28/200811/28/2008PNH
DetailsForrest France
BLD-Other10/30/200810/30/200810/30/2008PPASS
DetailsJim Storey
shaft complet in attic from gas room to exterior.
BLD-Conference10/28/200810/29/200810/29/2008PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/28/2008 at 3:37:58 PM. Contact: ###-####. shaft complet up to small sections from ceilling to horisontal section and face peice at elbow north end above entry door. ok to finsh check at ceilling insp.
FIRE-Final Inspection10/27/200810/27/200810/27/2008ANR
DetailsForrest France
Need project related fire sprinkler permit final prior to building life safety approval.
BLD-Conference10/23/200810/24/200810/24/2008PPART
DetailsJim Storey
dave Phone #: ###-#### shaft sides ok.
BLD-Framing/Rough-in10/15/200810/15/200810/17/2008PPART
DetailsJim Storey
dave Phone #: ###-#### gas rm not aproved and will need resolved by arch. to meet bld and fire code requirments not addressed on the plan. insulation of the rest of the ti space ok.
BLD-Aging Inspection9/8/20089/8/20089/8/2008 NR
DetailsJim Storey
Issue PAID IN FULL permit  6/9/2008 DONE
Print Occupancy Form  6/6/2008 DONE
Details
Telephone call  6/6/2008 DONE
Details
left vm for travis burrows at ###-#### - permit ready and fees given
Permit Ready to Issue  6/6/2008 DONE
Details
Plan assigned to (SRZ)5/7/2008 6/5/2008 PASS
DetailsSam Zahorka
6/5/2008 15:07:09 SRZ - activity updated through activity BLDA022 from case BLD08-00941.
Routing - PLAN CHECK6/4/2008 6/5/2008 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  6/5/2008 DONE
DetailsSam Zahorka
Routing - PLAN CHECK6/2/2008 6/4/2008 PEND
DetailsSam Zahorka
Pending others to pass. (SRZ)
Routing - FIRE6/4/2008 6/4/2008 PASS
DetailsKenneth R Roule
Attached updatd IFC comments to plans.
Routing - PLAN CHECK5/27/2008 6/2/2008 PEND
DetailsSam Zahorka
Pending more detail for medical gas shaft constuction. Architect is working on detail and will email to me. (SRZ)
Routing - FIRE5/21/20085/21/20085/27/2008 FAIL
DetailsKenneth R Roule
Faxed a copy of fire plan review notes to architect.
1st review completed  5/27/2008 DONE
DetailsKenneth R Roule
Route to Impact Fee Review5/21/20085/27/20085/22/2008 PASS
DetailsCindy M. Gould
tenet improvement no fees
Case Summary (BLD)  5/21/2008 DONE
Routing - PLAN CHECK5/9/2008 5/21/2008 FAIL
DetailsSam Zahorka
emailed correction to the architect.
Routing - PLUMBING5/8/2008 5/9/2008 PASS
DetailsBill VanDegrift
water heaters have been relocated to the mechanical room on the 1st floor.
Routing - PUBLIC WORKS5/7/2008 5/8/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating5/8/2008 5/8/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS5/6/2008 5/7/2008 DONE
DetailsMarlene Southard
5/7/2008 14:08:18 MYS - activity updated through activity BLDA160 from case BLD08-00941.
Recd Pcfee & Taken To Pln CK  5/6/2008 DONE
Plans ACCEPTED BY PLAN TECH  5/6/2008  
Application received 5/5/2008