Letter of compliance | | | 6/1/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
CHANGE STATUS TO (FNL) | | | 6/1/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
finaled
|
BLD-Final | 5/27/2009 | 5/28/2009 | 5/28/2009 | A | PASS |
Dave Hannah
|
|
|
Dave Phone #: ###-#### ok for cc
|
FIRE-Alarm Testing | 5/26/2009 | 5/27/2009 | 5/27/2009 | A | PASS |
Forrest France
|
|
|
Fire alarm interconnection at the magnetic door hold opertated correctly.
|
FIRE-Final Inspection | 5/26/2009 | 5/27/2009 | 5/27/2009 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable for the vanilla permit.
|
Zoning Approval | 5/22/2009 | 5/22/2009 | 5/22/2009 | | PASS |
Josh Wilson
|
|
|
|
BLD-Aging Inspection | 5/15/2009 | 5/15/2009 | 5/15/2009 | | NR |
Jim Storey
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/7/2009 | | DONE |
Barbara Stitt
|
|
|
Plan modification issued
|
(F) Reprint permit | | | 4/7/2009 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/7/2009 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 4/1/2009 | 4/1/2009 | 4/3/2009 | | PASS |
Sam Zahorka
|
|
|
4/3/2009 13:59:17 SRZ - activity updated through activity BLDA022 from case BLD08-00942.
|
Routing - PLAN CHECK | 4/1/2009 | | 4/3/2009 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/3/2009 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2009 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 4/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/3/2009 | | DONE |
Tisha Gallop
|
|
|
called Scott Grady (GC) and told him plan mod is ready and fees, this will still be vanilla finish permit and tenenat will need to do Occupancy Evaluation Request application when this project is done.
|
Permit Ready to Issue | | | 4/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plan Modification Accepted | | | 4/1/2009 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld08-00942 (Vanilla Finish/EOI) 1880 W. Judith Ln #220; Slightly adjusting existing wall layout to meet needs of tenant. Suite will remain same size and also remain general office spaces; submitted on sheets A2.0, A5.0; routed to Sam Z.
|
BLD-Aging Inspection | 2/24/2009 | 2/24/2009 | 2/24/2009 | | FAIL |
Jim Storey
|
|
|
need others to sign off.
|
FIRE-Final Inspection | 11/28/2008 | 11/28/2008 | 11/28/2008 | P | NR |
Forrest France
|
|
|
Dave Phone#: ###-####
|
FIRE-Final Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | PART |
Forrest France
|
|
|
Project related fire sprinkler permit work has been finaled.
|
BLD-Energy code compliance | 6/20/2008 | 6/20/2008 | 6/20/2008 | P | PART |
Dave Hannah
|
|
|
Keith Phone #: ###-#### contractor will call jim storey about framing inspection and fire about r/i insulation ok
|
Override - Parcel Holds | 6/20/2008 | 1/1/1900 | 6/20/2008 | | |
|
|
|
Not final insp
|
Issue PAID IN FULL permit | | | 6/9/2008 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/6/2008 | | DONE |
|
|
|
left vm for travis burrows at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/6/2008 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 5/7/2008 | | 6/5/2008 | | PASS |
Sam Zahorka
|
|
|
6/5/2008 15:10:17 SRZ - activity updated through activity BLDA022 from case BLD08-00942.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/5/2008 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/27/2008 | | 6/4/2008 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 5/30/2008 | | |
Sam Zahorka
|
|
|
Received response letter and two copies of sheets A2.0, A5.0; taken to Sam Z.
|
Routing - FIRE | 5/21/2008 | 5/21/2008 | 5/27/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire plan review notes.
|
1st review completed | | | 5/27/2008 | | DONE |
Kenneth R Roule
|
|
|
|
Route to Impact Fee Review | 5/21/2008 | 5/27/2008 | 5/22/2008 | | PASS |
Cindy M. Gould
|
|
|
tenet improvement no fees
|
Case Summary (BLD) | | | 5/21/2008 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/9/2008 | | 5/21/2008 | | PASS |
Sam Zahorka
|
|
|
ROUTED TO FIRE
|
Routing - PLUMBING | 5/8/2008 | | 5/9/2008 | | PASS |
Bill VanDegrift
|
|
|
the water heaters have been relocated to the first floor mechanical room.
|
Routing - PUBLIC WORKS | 5/7/2008 | | 5/8/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 5/8/2008 | | 5/8/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 5/6/2008 | | 5/7/2008 | | DONE |
Marlene Southard
|
|
|
5/7/2008 14:23:52 MYS - activity updated through activity BLDA160 from case BLD08-00942.
|
Recd Pcfee & Taken To Pln CK | | | 5/6/2008 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2008 | | |
Darla L Downs
|
|
|
|
Application received | | 5/5/2008 | | | |
Darla L Downs
|
|
|
|