(NO TENANT - VANILLA FINISH - VIEWPOINT LOT 14 - STE 220) **4/03/09 PLAN MODIFICATION - ADJUSTED WALL LAYOUT FROM THE ORIGINAL APPROVED PLANS TO INCLUDE: CHANGING OFFICE ONE TO A CONFERENCE ROOM, CREATING AN EQIPMENT ROOM, RELOCATING THE BREAK ROOM, AND CREATING MORE WORK STATIONS RATHER THAN THE ORIGINAL OFFICES. SRZ** To build out to a vanilla finish a 1,593 square foot future office tenant space. After a tenant has been determined, an MIS permit will be required to establish a certificate of occupancy. This building is fully fire sprinklered any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. DRH07-00109 (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  6/1/2009 DONE
DetailsAlexandra L. DeYoung
CHANGE STATUS TO (FNL)  6/1/2009 DONE
DetailsAlexandra L. DeYoung
finaled
BLD-Final5/27/20095/28/20095/28/2009APASS
DetailsDave Hannah
Dave Phone #: ###-#### ok for cc
FIRE-Alarm Testing5/26/20095/27/20095/27/2009APASS
DetailsForrest France
Fire alarm interconnection at the magnetic door hold opertated correctly.
FIRE-Final Inspection5/26/20095/27/20095/27/2009APASS
DetailsForrest France
Fire life safety inspection completed acceptable for the vanilla permit.
Zoning Approval5/22/20095/22/20095/22/2009 PASS
DetailsJosh Wilson
BLD-Aging Inspection5/15/20095/15/20095/15/2009 NR
DetailsJim Storey
CHANGE STATUS TO (ISS)  4/7/2009 DONE
DetailsBarbara Stitt
Plan modification issued
(F) Reprint permit  4/7/2009 DONE
Case Summary (BLD)  4/7/2009 DONE
Plan assigned to (SRZ)4/1/20094/1/20094/3/2009 PASS
DetailsSam Zahorka
4/3/2009 13:59:17 SRZ - activity updated through activity BLDA022 from case BLD08-00942.
Routing - PLAN CHECK4/1/2009 4/3/2009 PASS
DetailsSam Zahorka
Case Summary (BLD)  4/3/2009 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  4/3/2009 DONE
DetailsSam Zahorka
Case Summary (BLD)  4/3/2009 DONE
DetailsTisha Gallop
Telephone call  4/3/2009 DONE
DetailsTisha Gallop
called Scott Grady (GC) and told him plan mod is ready and fees, this will still be vanilla finish permit and tenenat will need to do Occupancy Evaluation Request application when this project is done.
Permit Ready to Issue  4/3/2009 DONE
DetailsTisha Gallop
Plan Modification Accepted  4/1/2009  
DetailsTisha Gallop
Plan modification accepted for Bld08-00942 (Vanilla Finish/EOI) 1880 W. Judith Ln #220; Slightly adjusting existing wall layout to meet needs of tenant. Suite will remain same size and also remain general office spaces; submitted on sheets A2.0, A5.0; routed to Sam Z.
BLD-Aging Inspection2/24/20092/24/20092/24/2009 FAIL
DetailsJim Storey
need others to sign off.
FIRE-Final Inspection11/28/200811/28/200811/28/2008PNR
DetailsForrest France
Dave Phone#: ###-####
FIRE-Final Inspection11/3/200811/3/200811/3/2008PPART
DetailsForrest France
Project related fire sprinkler permit work has been finaled.
BLD-Energy code compliance6/20/20086/20/20086/20/2008PPART
DetailsDave Hannah
Keith Phone #: ###-#### contractor will call jim storey about framing inspection and fire about r/i insulation ok
Override - Parcel Holds6/20/20081/1/19006/20/2008  
Not final insp
Issue PAID IN FULL permit  6/9/2008 DONE
Inspection Record Card- Bld  6/6/2008 DONE
Details
Telephone call  6/6/2008 DONE
Details
left vm for travis burrows at ###-#### - permit ready and fees given
Permit Ready to Issue  6/6/2008 DONE
Details
Plan assigned to (SRZ)5/7/2008 6/5/2008 PASS
DetailsSam Zahorka
6/5/2008 15:10:17 SRZ - activity updated through activity BLDA022 from case BLD08-00942.
PLANS/APPL TAKEN TO FRONT DESK  6/5/2008 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/27/2008 6/4/2008 PASS
DetailsSam Zahorka
Plan resubmittals received  5/30/2008  
DetailsSam Zahorka
Received response letter and two copies of sheets A2.0, A5.0; taken to Sam Z.
Routing - FIRE5/21/20085/21/20085/27/2008 PASS
DetailsKenneth R Roule
See fire plan review notes.
1st review completed  5/27/2008 DONE
DetailsKenneth R Roule
Route to Impact Fee Review5/21/20085/27/20085/22/2008 PASS
DetailsCindy M. Gould
tenet improvement no fees
Case Summary (BLD)  5/21/2008 DONE
DetailsSam Zahorka
Routing - PLAN CHECK5/9/2008 5/21/2008 PASS
DetailsSam Zahorka
ROUTED TO FIRE
Routing - PLUMBING5/8/2008 5/9/2008 PASS
DetailsBill VanDegrift
the water heaters have been relocated to the first floor mechanical room.
Routing - PUBLIC WORKS5/7/2008 5/8/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating5/8/2008 5/8/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS5/6/2008 5/7/2008 DONE
DetailsMarlene Southard
5/7/2008 14:23:52 MYS - activity updated through activity BLDA160 from case BLD08-00942.
Recd Pcfee & Taken To Pln CK  5/6/2008 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  5/6/2008  
DetailsDarla L Downs
Application received 5/5/2008   
DetailsDarla L Downs