Second Notice BLD | 3/3/2009 | 3/3/2009 | 3/10/2009 | | DONE |
Jim Toombs
|
|
|
This permit finaled on the web by Brandon Byington
|
First Notice | | 1/21/2009 | 3/3/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/21/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 1/15/2009 | 1/16/2009 | 1/16/2009 | A | PASS |
Tom Arcoraci
|
|
|
cecil Phone #: ###-####
|
FIRE-Final Inspection | 1/13/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 12/11/2008 | 12/12/2008 | 12/12/2008 | A | PART |
Tom Arcoraci
|
|
|
doug Phone #: ###-#### ok to occ as marked on plan
|
FIRE-Final Inspection | 12/11/2008 | 12/11/2008 | 12/11/2008 | A | PART |
Troy Cobbley
|
|
|
See the city approved plans for the third floor lobby and related rooms, as marked on the plans with todays date, that are ok to occupy.
|
BLD-Wall cover | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 12/1/2008 | 12/1/2008 | 12/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/1/2008 at 7:25:02 AM. Contact: ###-####.
|
BLD-Final | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/10/2008 at 7:36:58 AM. Contact: ###-#### ok for occ part 2nd floor
|
BLD-Other | 10/29/2008 | 10/29/2008 | 10/29/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/29/2008 at 7:20:38 AM. Contact: ###-####. ceiling grid need to wire up mec and clip or install spreader bars on edges
|
FIRE-Final Inspection | 10/27/2008 | 10/28/2008 | 10/28/2008 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was actually for a conference on fire alarm requirements
|
BLD-Framing/Rough-in | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/30/2008 at 8:02:27 AM. Contact: ###-####. interior framed walls, rms 312,313.
|
BLD-Aging Inspection | 9/23/2008 | 9/23/2008 | 9/23/2008 | | PASS |
Mike Jordan
|
|
|
wip
|
Plan Reviewer's activity | | | 8/20/2008 | | DONE |
|
|
|
Inserted additional plan sheetsA0.2, A2.1, A2.3, A2.6, A2.7, A3.0, A6.1 & A7.1. The original existing plan layout constructed under BLD01-01172showing (4 ) Prep / Recovery Rooms. Maintaining all four existing prep/recovery areas will continue the occupancy classification of the Proceedure Area as a "B", Medical Office per the 2006 IBC.
|
Telephone call | | | 8/20/2008 | | DONE |
|
|
|
Called and talked with Sam Burrows. His approved copies of the plan mod showing the 4 existing prep/recovery rooms being retained are ready to pick up and deliver to job site. Said he would be down today.
|
Additional plans submitted | | | 8/19/2008 | | |
|
|
|
Recieved one cover letter from Sam Burrows dated 8-19-08, 3 copies of sheets; a0.2, a2.1, a2.3, a2.5, a2.7, a3.0, a6.1, a7.1, and taken to Dan S. desk to decide if plan mod app required. 8-19-08 @3:15pm ALR
|
Telephone call | | | 6/24/2008 | | DONE |
|
|
|
t/c w sam burrows at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/24/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/24/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/23/2008 | | DONE |
|
|
|
|
Routing - FIRE | 6/18/2008 | | 6/19/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 6/19/2008 | | 6/19/2008 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2008 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 5/9/2008 | | 6/19/2008 | | PASS |
Dan Stuart
|
|
|
6/19/2008 15:39:56 DRS - activity updated through activity BLDA022 from case BLD08-00944.
|
Telephone call | | | 6/18/2008 | | DONE |
|
|
|
Called Sam Burrows concerning response to plumbing review questions. Response not included with resubmittals. He will check at his end and provide requested information.
|
Routing - PLAN CHECK | 6/18/2008 | | 6/18/2008 | | PEND |
Dan Stuart
|
|
|
Resubmittals inserted into original plans. Routing back to fire code analyst and plumbing code review for re-review.
|
Plan resubmittals received | | | 6/17/2008 | | |
Dan Stuart
|
|
|
Received 1 response letter from Sam Burrows to DanStuart, and 1 response letter to Scott Arellano, 3 copies of sheets A.01, A.02, A2.4, A2.5, A3.0 and taken back to Dan Staurts desk 6-17-08 @ 8:52am BAS
|
Routing - PLAN CHECK | 5/28/2008 | | 6/13/2008 | | PEND |
Dan Stuart
|
|
|
Copy of plan review to architect for his records. Clarification conditions attached to plans. Clear floor maneuvering space on pull side of doors 224 & 276 to be verified in filed. Architect to make modifications as needed and notify contractor with change if needed.
|
Routing - FIRE | 5/23/2008 | | 5/28/2008 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 5/28/2008 | | FAIL |
|
|
|
Failed Plumbing, Fire
|
Routing - PLAN CHECK | 5/13/2008 | | 5/23/2008 | | PEND |
Dan Stuart
|
|
|
Routing to fire code analyst.
|
Routing - PLUMBING | 5/21/2008 | | 5/21/2008 | | PASS |
Bill VanDegrift
|
|
|
the sink in room 206 is a hand sink only. no lab work done in this room, blood draw only. room 205 is medical transcription.
|
Routing - PLUMBING | 5/12/2008 | | 5/13/2008 | | FAIL |
Bill VanDegrift
|
|
|
provide information on the type of use proposed for the lab, room 206 and trans, room 205 for determination of appropriate cross connection protection requirements.
|
Routing - PUBLIC WORKS | 5/9/2008 | | 5/12/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 5/12/2008 | | 5/12/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 5/5/2008 | | 5/9/2008 | | DONE |
Marlene Southard
|
|
|
5/9/2008 10:54:37 MYS - activity updated through activity BLDA168 from case BLD08-00944.
|
Plans ACCEPTED BY PLAN TECH | | | 5/6/2008 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/5/2008 | | DONE |
|
|
|
|
Application received | | 5/5/2008 | | | |
|
|
|
|