Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00956
StatusFinaled
Name CM COMPANY
Site Address 1010 W WASHINGTON ST
Project NameBoise High School
Customer Number 
ePlanReviewNo
Description
(BOISE HIGH SCHOOL - BASEMENT/1ST/2ND FLRS) To reconfigure approximately 11,658 sq. ft. of existing school use area on three levels for classrooms, administration, office support areas and add seismic upgrades in the east wing at the first, second and roof structure per reviewed plans and engineering; upgrade electrical, mechanical, plumbing, sprinkler and alarm systems for code compliance in remodeled areas. Separate application and plans are required before modification to sprinkler system and alarm system.This is Phase IIIB of an ongoing seismic strengthening upgrade program to improve building integrity. This is historic building and use of the 1994 UCBC is applicable for upgrade & special inspection requirements for seismic improvements. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  11/13/2008 DONE
DetailsBarbara Stitt
DOC - Permit Finaled  11/13/2008 DONE
Letter of completion issued
BLD-Final11/7/200811/10/200811/10/2008APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/7/2008 at 9:08:36 AM. Contact: ###-####.
BLD-Final8/21/20088/22/20088/22/2008PPART
DetailsTony Young
rob Phone #: ###-####
FIRE-Final Inspection8/21/20088/22/20088/22/2008PPASS
DetailsForrest France
Corrections finished, fire life safety passed.
FIRE-Final Inspection8/13/20088/15/20088/15/2008PPART
DetailsForrest France
Final pending ceiling work at the basement level computer lab and ceiling/fire sprinkler work at the new fabrication room. EM lights and exit signs tested okay, project related FA is finished, remiander of life safety per the scope of work is acceptable.
BLD-Other8/11/20088/11/20088/11/2008PPART
DetailsTony Young
Rob- ceiling Phone #: ###-####
BLD-Other8/9/20088/11/20088/11/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/9/2008 at 2:52:10 PM. Contact: ###-####.
ceiling ok pending trades
BLD-Other7/28/20087/29/20087/29/2008APASS
DetailsTony Young
Rod Note: ceiling cover Phone #: ###-####
1st floor and basement I. T rooms ok on ceiling grid
BLD-Framing/Rough-in7/23/20087/23/20087/23/2008PPART
DetailsTony Young
rob Phone #: ###-####
attic ties , ok pending s. i. reports
BLD-Framing/Rough-in7/22/20087/23/20087/23/2008APART
DetailsTony Young
rob Phone #: ###-####
seismic hold downs in attic,, and beam through ties
BLD-Framing/Rough-in7/14/20087/14/20087/14/2008PPART
DetailsDave Hannah
rob Phone #: ###-#### see marked up plans second floor strapind ok to cover
BLD-Framing/Rough-in7/9/20087/10/20087/10/2008PPART
DetailsDave Hannah
Rob Phone #: ###-#### see marked up areas on plans looked at framing and floor to wall straping on second fl and replacement of sheet rock lid in basement hallway all ok to cover
BLD-Framing/Rough-in7/7/20087/8/20087/8/2008PPART
DetailsJim Sly
Rob Phone #: ###-####
Rock installed...lids Rooms 306 300 403 408 1st floor ....OK to cover walls 2nd floor area E on plan.
BLD-Framing/Rough-in7/2/20087/2/20087/2/2008PPART
DetailsTony Young
Rob Phone #: ###-####
basement hall way drag struts,, pending ok from S I and structural engineer on as built
BLD-Framing/Rough-in7/1/20087/1/20087/1/2008PPART
DetailsTony Young
Rob Phone #: ###-####
wall and straps as noted on plans
BLD-Other6/26/20086/27/20086/27/2008APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/26/2008 at 5:12:02 PM. Contact: ###-####.
straps in room 302,, ceilings ok in 303 and 305 ok
BLD-Framing/Rough-in6/26/20086/26/20086/26/2008PPART
DetailsTony Young
Rob- ele insp also in the PM Phone #: ###-####
ok anop
BLD-Framing/Rough-in6/17/20086/18/20086/18/2008PPART
DetailsTony Young
rob - basement - east wing seismic Phone #: ###-####
seismic straps ok as noted on plans,, pending S. I. report on pull tests
BLD-Framing/Rough-in6/17/20086/18/20086/18/2008APART
DetailsTony Young
rob - basement classroom and storage Phone #: ###-#### - after 9:30 please
walls ok to cover as noted on plans (anop)
BLD-Framing/Rough-in6/13/20086/13/20086/13/2008PPASS
DetailsJim Storey
rob Phone #: ###-#### wall sec basement stair #3 ok for cover.
FIRE-Conference6/10/20086/11/20086/11/2008ADONE
DetailsForrest France
On site conference regarding exit signage at the new wall and exit door located in the basement level northeast side.
FIRE-Conference6/9/20086/10/20086/10/2008ADONE
DetailsForrest France
Rob- fire life saftey Phone #: ###-####
Telephone call  5/30/2008 DONE
Details
t/c w ed daniels at ###-#### - permit ready and fees given
Permit Ready to Issue  5/30/2008 DONE
Details
Issue PAID IN FULL permit  5/30/2008  
Routing - PLAN CHECK5/28/2008 5/29/2008 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  5/29/2008 DONE
Inspection Record Card- Bld  5/29/2008 DONE
Details
Plan assigned to (DRS)5/9/2008 5/29/2008 PASS
DetailsMarlene Southard
5/29/2008 09:48:50 MYS - activity updated through activity BLDA022 from case BLD08-00956.
Routing - FIRE5/21/20085/21/20085/28/2008 PASS
DetailsKenneth R Roule
See fire plan review notes.
1st review completed  5/28/2008 DONE
Route to Impact Fee Review5/21/20085/27/20085/21/2008 PASS
DetailsCindy M. Gould
Tennet improvement no fees
Routing - PLAN CHECK5/12/2008 5/21/2008 PEND
DetailsDan Stuart
Copy of report and deferred submittal requirements sent to architect, engineer and boise school district agents for there records. Routing to fire code analyst for review.
Routing - PUBLIC WORKS5/9/2008 5/12/2008 PASS
DetailsBeverly Hall
Pending Assignment by MYS5/6/2008 5/9/2008 DONE
DetailsMarlene Southard
5/9/2008 11:56:44 MYS - activity updated through activity BLDA168 from case BLD08-00956.
Application received 5/6/20085/7/2008 DONE
DetailsBethany Sullins
Plans ACCEPTED BY PLAN TECH  5/7/2008 DONE
DetailsBethany Sullins
Recd Pcfee & Taken To Pln CK  5/6/2008 DONE
DetailsBethany Sullins