Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-00984
StatusFinaled
Name GILBANE BUILDING COMPANY
Site Address 9050 W OVERLAND RD Unit: 100
Project NameANDERSON BLACK EAGLE
Customer Number 
ePlanReviewNo
Description
(BROWN MACKIE COLLEGE - ANDERSON BLACK EAGLE BLDG -1ST & 2ND FLRS) To construct a 25,612 sq.ft. medical education facility covering areas on 2 stories (14,672 s.f. 1st / 10,940 s.f. 2nd) of an existing shell building per approved plans and CUP08-00056. Work includes select interior demolition, construction of non-combustible framed walls to create instruction & demonstration/practice classrooms & labs; administrative office's and support areas; study/library, student lounge, accessible restrooms and accessible elements throughout; suspended ACT & sheetrock ceilings; electrical, mechanical, plumbing, sprinkler & alarm systems work; millwork and finishes throughout. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/200812/19/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 8/27/20089/22/2008 DONE
BLD-Final8/26/20088/27/20088/27/2008APASS
DetailsMike Jordan
Mike Please call 1/2 hr before going out ( ele final is also in for the am) Phone #: ###-####. ok for perm occ.
Permanent Occupancy  8/27/2008 DONE
DetailsTisha Gallop
BLD-Final8/25/20088/25/20088/25/2008ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/25/2008 at 7:17:50 AM. Contact: ###-####. Still needs elec. and plumbing to sign perm occ.
FIRE-Final Inspection8/21/20088/21/20088/21/2008PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final8/13/20088/14/20088/14/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/13/2008 at 3:53:14 PM. Contact: ###-####. ok for temp occ. Needs other trades to sign perm. Also needs to install boots under sinks, install missing safety glazing and finsh transitions on carpet to tile/congoliuem at floor elevation changes.
FIRE-Final Inspection8/13/20088/14/20088/14/2008APART
DetailsTroy Cobbley
A temporary was given with Sam Rogers permission until the fire alarm permit can be finaled. See the project related fire alarm permit for details. The two exit signs from the previous correction notice have been repaired.
Temporary Occupancy UNPAID FEE  8/14/2008 DONE
DetailsBarbara Stitt
FIRE-Final Inspection8/12/20088/13/20088/13/2008AFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs to be finaled. Also the very west most second floor corridor exit sign needs repaired and another needs to be added at the second floor elevator corridor/main corridor junction as shown on the city approved drawings. All other items are ok.
BLD-Final8/12/20088/13/20088/13/2008PNR
DetailsMike Jordan
Mike ###-####. Needs plumbing final, fire/life/safety.
BLD-Framing/Rough-in8/5/20088/6/20088/6/2008APASS
DetailsMike Jordan
Terry- ceiling grid Phone #: ###-####. Remaining rooms on 2nd floor ok.
BLD-Framing/Rough-in7/30/20087/31/20087/31/2008APART
DetailsMike Jordan
mike - ceiling grid - please call 1/2 hr prior to inspection Phone #: ###-####. ceiling grid 2nd floor. ok except for the four rooms were elec. ri has not passed.
BLD-Framing/Rough-in7/29/20087/30/20087/30/2008ACANC
DetailsMike Jordan
Mike- call before going Phone #: ###-####
BLD-Framing/Rough-in7/24/20087/24/20087/24/2008PPASS
DetailsMike Jordan
mike - hard lid inspection Phone #: ###-####. hardlids for restrooms on 2nd. floor, remaining interior steel stud walls on 2nd floor were edward jones was occuping.
BLD-Framing/Rough-in7/21/20087/21/20087/21/2008PPASS
DetailsMike Jordan
Mike- ceiling grid Phone #: ###-####
BLD-Energy code compliance6/27/20086/27/20086/27/2008PPASS
DetailsMike Jordan
BLD-Framing/Rough-in6/26/20086/27/20086/27/2008PPASS
DetailsMike Jordan
Mike Phone #: ###-####. Verified backing for ADA hardware in restroom at 2nd. floor.
BLD-Framing/Rough-in6/25/20086/26/20086/26/2008PPART
DetailsMike Jordan
mike Note: please call 1/2 before inspection Phone #: ###-####. Interior steel stud walls at 2nd. floor. Need to verify backing for ADA harware in restroom @ 2nd. floor. Als pend. plumbing ri insp. on 2nd. floor.
BLD-Framing/Rough-in6/25/20086/25/20086/25/2008PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/25/2008 at 6:42:33 AM. Contact: ###-####. Inspection cancelled from web by: Alexandra Rahn
BLD-Energy code compliance6/16/20086/17/20086/17/2008PPART
DetailsJim Sly
mike Phone #: ###-####
1st floor........OK
BLD-Framing/Rough-in6/13/20086/16/20086/16/2008PPART
DetailsJim Sly
Mike- call prior to going Phone #: ###-####
1st floor OK
Issue PAID IN FULL permit  6/4/2008 DONE
Print Occupancy Form  6/3/2008 DONE
Details
Received Certificate of Value  6/3/2008 DONE
DetailsTisha Gallop
Received revised cert of value; see comments in bld permit and scanned attached docuement//6/3/08 LEG
Telephone call  6/3/2008 DONE
DetailsTisha Gallop
contractor John Schaefer (Gilbane Bldg. Co.) came into office; told him permit is ready and fees
Permit Ready to Issue  6/3/2008 DONE
DetailsTisha Gallop
Routing - PLAN CHECK6/2/2008 6/2/2008 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  6/2/2008 DONE
Plan assigned to (DRS)5/9/2008 6/2/2008 PASS
DetailsMarlene Southard
6/2/2008 16:12:44 MYS - activity updated through activity BLDA022 from case BLD08-00984.
Routing - PLANNING6/2/2008 6/2/2008 PASS
DetailsScott Spjute
CUP08-00056. Issuance of this permit allowed during the appeal time period by Scott Spjute.
Routing - PUBLIC WORKS5/23/2008 5/27/2008 PASS
DetailsLouise Waldorf
Added drinking fountain, 2 lavs& 2 WC to restrrom on Sheet P-03
Print Pending Permit.LaserJet4  5/23/2008  
Plan resubmittals received  5/23/2008  
Received three copies of response letter, lighting compliance on 8 1/2" x 11" page, and sheets cover, A-002, A-003, A-004, A-005, A-006, A-007, A-008, A-009, D-1, D-2, A-010, A-111, A-112, A-113, A-114, A-121, A-122, A-123, A-124, A-131, A-201, A-202, A-221, A-251, A-711, A-721, DT-01, DT-O2 (NEW SHEET), IE-01, M01, M02, M03, M04, M05, M06, M07, P01, P02, P03, P04, P05, E01, E02, E03, E04, E05, E06, E07, E08, E09, T001, T101, T102, T500, T501, T502, T700; inserted by LEG and taken to Dan Stuart
Routing - PLAN CHECK5/20/2008 5/23/2008 PEND
DetailsDan Stuart
Resubmittals of 5/22/08 inserted into plans. Items not corrected on plan resubmittals were red-lined with reference in attached plan review to be part of the reviewed plan requireing compliance.Routing plans to other agencies previously failing project.
Route to Impact Fee Review5/21/20085/27/20085/21/2008 PASS
DetailsCindy M. Gould
Tenand improvement no fee
Routing - FIRE5/16/20085/16/20085/20/2008 PASS
DetailsKenneth R Roule
See fire plan review notes.
1st review completed  5/20/2008 FAIL
Plan resubmittals requested  5/16/2008 DONE
Copy of plan review resubmittal requirements e-mailed to architect.
Routing - PLAN CHECK5/14/2008 5/16/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to architect.Routing plans to fire code analyst.
Routing - PLANNING5/13/2008 5/14/2008 FAIL
DetailsSusan Riggs
Susan Riggs CUP08-00056 Plans failed because the CUP application has not gone to the Commission. Scheduled 6-2-08 and then there is a 10 day appeal waiting period.
Routing - PUBLIC WORKS5/9/2008 5/13/2008 PASS
DetailsBeverly Hall
Routing PW Sewer Rating5/13/2008 5/13/2008 PASS
DetailsLouise Waldorf
Pending Assignment by MYS5/8/2008 5/9/2008 DONE
DetailsMarlene Southard
5/9/2008 10:05:57 MYS - activity updated through activity BLDA168 from case BLD08-00984.
Plans ACCEPTED BY PLAN TECH  5/8/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/8/2008 DONE
DetailsTisha Gallop
Application received 5/8/2008   
DetailsTisha Gallop