Third Notice BLD | 1/29/2009 | 1/29/2009 | 4/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Letter of compliance | | | 4/3/2009 | | DONE |
Barbara Stitt
|
|
|
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/18/2008 | 12/18/2008 | 1/2/2009 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 12/17/2008 | 12/18/2008 | 12/18/2008 | A | PASS |
Dave Hannah
|
|
|
Jay Phone #: ###-####
|
DOC - Permit Finaled | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | PASS |
Forrest France
|
|
|
Building fire life safety completed satisfactory.
|
FIRE-Final Inspection | 12/1/2008 | 12/1/2008 | 12/1/2008 | A | DEFR |
Forrest France
|
|
|
Final pending project related fire alarm permit work.
|
BLD-Final | 10/30/2008 | 10/30/2008 | 10/31/2008 | P | NR |
Dave Hannah
|
|
|
jay Phone #: ###-####needs fire finals
|
FIRE-Final Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | FAIL |
Forrest France
|
|
|
Need to provide verification the two access control egress doors are interconnected to the fire alarm control panel for power loss to the magnets upon alarm condition-see electrical sheet note 22 red lined annotation and fire code review notes for details. Also need to provide one missing exit sign at the east side per approved drawings.
|
BLD-Conference | 9/29/2008 | 9/30/2008 | 9/30/2008 | A | PASS |
Dave Hannah
|
|
|
jay Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PART |
Dave Hannah
|
|
|
jay - ceiling cover Phone #: ###-####ok to cover
|
Issue & PRINT to be Invoiced | | | 6/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2008 | | DONE |
|
|
|
t/c w curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/10/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2008 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 6/9/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/2/2008 | | 6/9/2008 | | PASS |
Sam Zahorka
|
|
|
|
Plan assigned to (SRZ) | 5/13/2008 | | 6/9/2008 | | PASS |
Sam Zahorka
|
|
|
6/9/2008 10:16:24 SRZ - activity updated through activity BLDA022 from case BLD08-00985.
|
Plan resubmittals received | | | 6/6/2008 | | |
Sam Zahorka
|
|
|
Received response letter and two copies of sheets A2.1, A10.1, E-2.0S; taken to Sam Z.
|
Routing - FIRE | 5/29/2008 | 5/29/2008 | 6/2/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/2/2008 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 5/29/2008 | 6/3/2008 | 5/29/2008 | | PASS |
Cindy M. Gould
|
|
|
|
Case Summary (BLD) | | | 5/29/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/15/2008 | | 5/29/2008 | | FAIL |
Sam Zahorka
|
|
|
Emailed correction to the Architect. Routed to Fire.
|
Routing - PUBLIC WORKS | 5/13/2008 | | 5/15/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Sewer Rating | 5/14/2008 | | 5/14/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 5/8/2008 | | 5/13/2008 | | DONE |
Marlene Southard
|
|
|
5/13/2008 16:15:12 MYS - activity updated through activity BLDA160 from case BLD08-00985.
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2008 | | DONE |
Bethany Sullins
|
|
|
|
Application received | | 5/8/2008 | | | DONE |
Bethany Sullins
|
|
|
|