Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD08-00999
StatusFinaled
Name HUNTER HOMES INC
Site Address 1907 S DIVISION AVE
Project Nameduplex - 1909 Division Ave
Customer Number 
ePlanReviewNo
Description
This permit is for the construction of a new two story duplex. The north unit has a 1416 square foot first story with two bedrooms and two bathrooms as well as an attached garage of 273 square feet with a covered front porch of 30 square feet. The second story is a total of 505 square feet with two bedrooms and one bathroom. The south unit has a first story of 755 square feet with one bathroom, a kitchen and a covered front porch of 42 square feet. The second story is 505 square feet with two bedrooms and one bathroom. The second floor of the South unit is over a portion of the North unit and has a one hour floor/cieling assembly (GA FC 5407) over that portion. The separation wall will be built per Table 720.0(2) number 14-1.3 of the 2006 IBC. There are to be no eaves that extend within five feet of the property line. R-2 zoning district, building setbacks and CAA08-00134 per Planning and Zoning. THE PERMIT HOLDER is responsible to comply with section R602.10 for wall bracing or build to an engineered design. THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INDIVIDUAL UNITS. Built per all approved plans, red lining and plan review report. (BSP)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval  4/1/2010 DONE
DetailsBarbara Stitt
Bond released 6-15-09 ok to final
DOC - Permit Finaled  4/1/2010 DONE
DetailsBarbara Stitt
BLD-Aging Inspection3/9/20103/9/20103/12/2010 DEFR
DetailsJim Storey
to barb
BLD-Aging Inspection1/7/20101/7/20101/8/2010 DONE
DetailsJim Storey
CHANGE STATUS TO (TMP)  1/5/2009 DONE
DetailsBarbara Stitt
Bond for Landscaping BND08-00094
BLD-Final12/22/200812/22/200812/22/2008PPASS
DetailsJim Storey
david Phone #: ###-#### p/z bond on file/ esc frozen.
DOC - Permit Finaled12/22/200812/22/200812/22/2008PPASS
DetailsJim Storey
FIRE-Final Inspection12/19/200812/22/200812/22/2008ADEFR
DetailsForrest France
Intended for structural final inspection, notified contractor.
Zoning Approval12/22/200812/22/200812/22/2008 DONE
DetailsSue Cummings
Landscaping has been bonded. O.K. to issue temporary occupancy. SAC 12/22/08.
BLD-Energy code compliance11/19/200811/20/200811/20/2008APASS
DetailsJim Storey
david Phone #: ###-####
BLD-Framing/Rough-in11/17/200811/18/200811/18/2008APASS
DetailsJim Storey
David Phone #: ###-####
Plan resubmittals received  10/29/2008 DONE
the look of the buildings have been changed with the brick/siding ok per Susan Riggs page # 7 she will keep a copy for when she goes out to inspect and the other 2 copies will go on site.
BLD-Conference10/21/200810/21/200810/21/2008PPASS
DetailsJim Storey
steve Phone #: ###-####
BLD-Framing/Rough-in10/13/200810/14/200810/14/2008PPART
DetailsJim Storey
john - shear wall Phone #: ###-#### nailling on exterior ok. door on north side of bldg. moved and p/z must reapprove.
BLD-Other9/29/20089/30/20089/30/2008APART
DetailsJim Storey
john Note: fire walls Phone #: ###-#### as per aproved plan
BLD-Foundation8/22/20088/25/20088/25/2008APASS
DetailsJim Storey
Dave- pouring at 10 Phone #: ###-####
BLD-Footing8/18/20088/19/20088/19/2008APART
DetailsJim Storey
dave Phone #: ###-####
Issue PAID IN FULL permit  7/21/2008 DONE
Routing - PLAN CHECK7/9/2008 7/17/2008 PASS
DetailsBen S. Pavelka
Case Summary (BLD)  7/17/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/17/2008 DONE
Inspection Record Card- Bld  7/17/2008 DONE
Telephone call  7/17/2008 DONE
Details
t/c w michelle basye at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  7/17/2008 DONE
Details
Plan assigned to (BSP)7/14/20087/14/20087/14/2008 DONE
DetailsBen S. Pavelka
Plans ACCEPTED BY PLAN CHECK  7/14/2008  
DetailsBen S. Pavelka
Routing - PUBLIC WORKS7/8/2008 7/9/2008 PASS
DetailsLouise Waldorf
Routing - PLANNING6/17/2008 7/8/2008 PASS
DetailsSusan Riggs
I have spoken to the applicant and am waiting for a landscape plan. I sent approval letter today & the appeal date end 6-27-08. Condition of approval is approval of LS plan and bonding for landscaping. Cody asked Sue C to review in Susan's absence. Susan approved landscaping prior to leaving on vacation, so I passed the bld permit. SC
Application received 5/9/20085/9/2008 DONE
DetailsMarsha Smylie
Routing - Addressing5/9/2008 5/9/2008 PASS
DetailsChris Pichardo
Routing - PLANNING5/9/2008 5/9/2008 FAIL
DetailsLucinda Grames
Duplex application not yet filled out. Left message with Michelle Basye on 5-9-08 at 4:00pm