Third Notice | | 8/31/2009 | 8/31/2009 | | DONE |
|
|
|
|
Second Notice BLD | 3/4/2009 | 3/4/2009 | 8/31/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/28/2009 | 3/4/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/28/2009 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Final Inspection | 1/27/2009 | 1/28/2009 | 1/27/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 12/5/2008 | 12/8/2008 | 12/12/2008 | A | CANC |
Troy Cobbley
|
|
|
Waiting on confermation that an agreement has been reached with the fire dept.
|
BLD-Final | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | PEND |
Tom Arcoraci
|
|
|
scott Phone #: ###-#### ok pending fire sign off
|
Permit EXTENDED | | | 12/8/2008 | | |
|
|
|
|
BLD-Aging Inspection | 12/5/2008 | 12/5/2008 | 12/5/2008 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 9/18/2008 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 9/8/2008 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/8/2008 | | |
|
|
|
changed status by mistake- in the process of showing bob a how it is done th extend a permit..
|
BLD-Final | 6/9/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Mark Sentenno's permission until the remaining insulation issues in the strip mall have been addressed by Oppenhiemer Development.
|
BLD-Final | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | NR |
Tom Arcoraci
|
|
|
steve Phone #: ###-#### needs fire to sign off
|
FIRE-Conference | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | DONE |
Troy Cobbley
|
|
|
The fire extinguisher needs to be lowered as discussed. The sprinkler pendants in the long corridor are located too close to the wall. A mezzanine/storage area has been built with no sprinkler protection. It either needs sprinkler protection extended into it or it needs to be removed. The exit sign directing people to the rear exit does not have battery backup as required per IFC chapter 10. As with the rest of the strip mall there is a problem with the insulation that is attached to the deck falling down and obstructing the upright sprinkler protection. I spoke to the property manager about this and she is contacting Mark Sentenno about a repair agreement. I also spoke to Mark about this issue and I'm awaiting an agreement between the two parties.
|
BLD-Framing/Rough-in | 5/20/2008 | 5/21/2008 | 5/21/2008 | A | PASS |
Tom Arcoraci
|
|
|
steve Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/15/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/12/2008 | 5/12/2008 | 5/14/2008 | | PASS |
Ron Hill
|
|
|
5/14/2008 07:42:58 RMH - activity updated through activity BLDA022 from case BLD08-01007.
|
Routing - PLAN CHECK | 5/13/2008 | | 5/14/2008 | | PASS |
Ron Hill
|
|
|
|
Case Summary (BLD) | | | 5/14/2008 | | DONE |
|
|
|
|
1st review completed | | | 5/14/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 5/14/2008 | | DONE |
|
|
|
left vm for dustin curtis at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/14/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/12/2008 | | 5/13/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 5/13/2008 | | 5/13/2008 | | PASS |
Walt Baumgartner
|
|
|
WestBoise Sewer Dist, OK
|
Pending Assignment by MYS | 5/9/2008 | | 5/12/2008 | | DONE |
Tisha Gallop
|
|
|
5/12/2008 11:14:14 LEG - activity updated through activity BLDA175 from case BLD08-01007.
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2008 | | |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/12/2008 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 5/9/2008 | 5/9/2008 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/9/2008 | | |
Tisha Gallop
|
|
|
|