Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD08-01011
StatusFinaled
Name MCCARTER-MOORHOUSE CO INC
Site Address 12160 W OVERLAND RD
Project NameSigler Development
Customer Number 
ePlanReviewNo
Description
Sigler Development - Retail Shell - To construct a new 1,920 square foot, one story, wood framed retail shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. NOTE: THIS BUILDING IS IN THE FLOODPLAIN AND IS SUBJECT TO ALL PUBLIC WORKS FLOODPLAIN ORDINANCE REQUIREMENTS.JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD1/29/20091/29/20092/9/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/2/20091/2/20091/29/2009 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice12/5/200812/5/20081/2/2009 DONE
DetailsJim Sly
BLD-Final12/4/200812/5/200812/5/2008PPASS
DetailsJim Sly
dana Phone #: ###-####
C/C issued
DOC - Permit Finaled12/5/200812/5/200812/5/2008PPASS
DetailsJim Sly
PubWorks Occupancy Approval12/10/200812/10/200812/5/2008  
FIRE-Final Inspection12/2/200812/3/200812/3/2008APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval12/3/200812/3/200812/3/2008 PASS
DetailsJosh Wilson
OK per DRH08-00012
Elevation Cert Rec'd-Final  10/28/2008 DONE
Received post construction elevation certificate. Certificate documents compliance with the City Floodplain Ordinance. Okay to schedule a framing inspection.
BLD-Framing/Rough-in10/13/200810/13/200810/13/2008PPASS
DetailsJim Sly
dana Phone #: ###-####
BLD-Framing/Rough-in9/26/20089/29/20089/29/2008ACANC
DetailsJim Sly
Daina- sheer Phone #: ###-####
Shear nailing OK.
BLD-Foundation8/29/20089/2/20089/2/2008APART
DetailsJim Sly
dave - pouring at 11:00 Phone #: ###-####
Foundation rebar and forming OK......Talked to Dana about Verification of setback and easement with irrigation district and their approval for Building location.
MISC ACTIONS  8/29/2008 DONE
DetailsTisha Gallop
gave one set of approved revised civil plans approved by JCM on 8/28/08 to contractor to have on site//8/29/08 LEG
BLD-Foundation8/27/20088/28/20088/28/2008APART
DetailsJim Sly
dave - pour time is 9:30 Phone #: ###-####
Footings OK
Plan resubmittals received  8/28/2008  
DetailsJohn Menard
Recieved 1 transmittal letter for John and 1 copy of pages: a2.3, and a3.1.
Plan Reviewer's activity  8/28/2008 PASS
Reviewed and approved plan modification to revised civil drawings indicating a slight building orientation change. The building has been rotated to the north from parallel with Overland and Cloverdale Roads. This is the only approved change to civil plans. JCM
Issue PAID IN FULL permit  8/19/2008 DONE
Plan assigned to (JCM)7/17/2008 7/22/2008 PASS
DetailsJohn Menard
7/22/2008 13:55:41 JCM - activity updated through activity BLDA022 from case BLD08-01011.
Routing - PLAN CHECK7/21/2008 7/22/2008 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  7/22/2008 DONE
CHANGE STATUS TO (RDY)  7/22/2008  
John Menard brought plans to front counter-- changed to the "rdy" status
Telephone call  7/22/2008  
John Menard dropped these plans off at my desk------talked to tammy with mccarter-moorehouse at ###-#### that permit is ready--& needed achd
Routing - FIRE7/18/2008 7/21/2008 PASS
DetailsKenneth R Roule
No additional fire review comments attached.
Routing - PLANNING7/17/2008 7/18/2008 PASS
DetailsJosh Wilson
Plan resubmittals received  7/17/2008 DONE
received 1 transmittal and 2 copies of sheets A1.1,A1.2 I nserted by Mark from MCKeegan Architects and plans routed back to John M
CHANGE STATUS TO (REV)  7/17/2008 DONE
had resubmittals inserted and the plans needed to go back to John M.
Routing - PUBLIC WORKS7/17/2008 7/17/2008 PASS
DetailsJohn Menard
Had a converstation with Jim Wyllie, who indicated that the building move was not significant enough to required revised civil plans. JCM
Permit Ready to Issue  6/24/2008 DONE
DetailsTisha Gallop
Telephone call  6/24/2008 DONE
DetailsTisha Gallop
Returned phone call and left voice message for Tammy at McCarter-Moorehouse about permit fees, need RP and ACHD//6/24/08 11:16am LEG
Inspection Record Card- Bld  6/23/2008 DONE
DetailsAlexandra L. DeYoung
Telephone call  6/23/2008 DONE
DetailsAlexandra L. DeYoung
Called Pat at ###-####, permit ready, fees given
Routing - PLAN CHECK6/19/2008 6/20/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  6/20/2008 PASS
DetailsJohn Menard
Reviewed and approved structural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/20/2008 DONE
DetailsJohn Menard
Plan assigned to (JCM)5/13/2008 6/20/2008 PASS
DetailsJohn Menard
6/20/2008 10:15:23 JCM - activity updated through activity BLDA022 from case BLD08-01011.
Routing - PUBLIC WORKS6/16/2008 6/19/2008 PASS
DetailsBeverly Hall
Routing PW Drainage6/16/2008 6/18/2008 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/12/2008 6/16/2008  
DetailsJohn Menard
Plan resubmittals received  6/16/2008  
DetailsMarsha Smylie
received letter of transmittal from ehm engineers & "6" sheets each of C6.O-- plans taken back to John Menard-- inserter is Denise Lauerman
Routing PW Drainage6/5/2008 6/12/2008 FAIL
DetailsBrian Murphy
NO MONITORING WELL ON PLAN VIEW SWALE LESS THAN 10 FEET FROM FOUNDATION STRUC ENG LETTER NEEDED MUST ADDRESS POSSIBLE SIDEWALL BY PASS ON SEEPAGE BED. BRIAN MURPHY ###-####
Routing PW Flood Plain6/12/2008 6/12/2008 PASS
DetailsJim Wyllie
Received Elevation Certificate.
Routing - PUBLIC WORKS6/5/2008 6/12/2008 FAIL
DetailsLouise Waldorf
Routing PW Environmental6/5/2008 6/6/2008 PASS
DetailsWalt Baumgartner
resubmittal of site sheet notes second stub in for grease line. Spoke to Plumbing Inspector, ok.
Routing - FIRE6/3/20086/3/20086/5/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing PW Solid Waste  6/5/2008 PASS
DetailsPeter J. McCullough
Pass with the condition that the trash enclosure is used for 95-gallons carts only, not a dumpster. If dumpsters are needed the enclosure will need to be rebuilt to 12' x 12' ID.
Routing PW Flood Plain6/5/2008 6/5/2008 FAIL
DetailsJim Wyllie
Elevation Certificate documenting compliance with Boise City Floodplain Ordinance is required prior to issuance of a building permit. Jim Wyllie / ###-####
1st review completed  6/5/2008 FAIL
Failed PW, Structural
Route to Impact Fee Review6/3/20086/6/20086/4/2008 PASS
DetailsCindy M. Gould
Plan resubmittals received  6/4/2008 DONE
DetailsDarla L Downs
received 2 structural comments,2 structural calcs,and 2 copies of sheets S0.1,S1.1 inserted by Mark with Partick MCKeegan office and returned to fire
Plan Reviewer's activity  6/3/2008 PASS
DetailsJohn Menard
Reviewed and approved nonstructural code items with attached comment list. JCM
Routing - PLAN CHECK5/27/2008 6/3/2008 PASS
DetailsJohn Menard
Telephone call  5/28/2008 DONE
Details
After figuring out what plan the re-submittals go to on 5-23-08 and talking with Brian Murphy it was determined that EMH Engineers needs to come and insert re-submittals into plans. I contacted Denise Lauerman at EMH to inform them someone needs to come and insert these sheets into plans before Brian Murphy will look at them///5-28-08 @ 9:15am BAS
Routing - PLANNING5/22/2008 5/27/2008 PASS
DetailsColleen T Carroll
John Wilson drh08-00012
Plan resubmittals received  5/23/2008  
DetailsBarbara Stitt
Received 1 cover tranmittal, 2 copies of Drainage Report, 2 copies of Drainage O & M, 2 copies of Geotechnical Engineering Report, 5 copies of sheets C1.0, C2.0, C3.0, C4.0, C6.0 dropped off at my desk with no identifing information (ie permit number) on 5-23-08 asking to be given to Brian Murphy.--5-28-08 Denise in to insert pages into plans and taken back to John Menard's desk
Routing - PLUMBING5/21/2008 5/22/2008 PASS
DetailsBill VanDegrift
no interior piping. per plans and 2003 upc
Routing - Erosion and Sediment5/20/2008 5/21/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditons. ESC08-00421
Plan resubmittals received  5/21/2008  
DetailsMarsha Smylie
received transmittal from Patrick McKeegan & "2" sheets each of A1.1 & A1.3-- took plans back to Plumbing box--the inserter is Mark Otto from Patrick Mckeegan's office
Plan resubmittals requested  5/21/2008 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing PW Sewer Rating5/20/2008 5/20/2008 PASS
DetailsConnie Baumgartner
Routing PW Environmental5/20/2008 5/20/2008 FAIL
DetailsWalt Baumgartner
CU application Jan 08 conditioned to require segragated grease line to accomodate food service tenants. Current shell core submittal shows no plumbing. Contact Walt Baumgartner ###-####
Routing - PUBLIC WORKS5/13/2008 5/20/2008 FAIL
DetailsConnie Baumgartner
Routing Off Site - STRUCTURAL5/13/2008 5/19/2008 FAIL
DetailsJohn Menard
called action courier at ###-#### that permit is ready for pickup - Received comment list from the consulting structural engineer requesting revisions. JCM
Routing PW Solid Waste  5/19/2008 FAIL
DetailsPeter J. McCullough
Trash enclosure is not the required size (12' X 12' ID). Gates to enclosure must open 120 degrees. Contact: Peter McCullough, ###-####
Routing PW Flood Plain5/15/2008 5/19/2008 FAIL
DetailsJim Wyllie
Plans show future fence to be located in a floodway zone. No fence allowed in the Floodway Zone.
An Elevation Certificate demonstrating compliance with Boise City Floodplain Ordinance requirements must be submitted to and approved by Public Works prior to issuance of a building permit. Jim Wyllie (###-####)
Routing PW Street Lights  5/15/2008 PASS
DetailsBill Colson
Routing PW Drainage5/14/2008 5/15/2008 FAIL
DetailsBrian Murphy
NO GEOTECH REPORT, NEED REVISED O AND M, DRAINAGE REPORT, MONITORING WELL IN SEEPAGE BED AND ROOFDRAINAGE GRADES. BRIAN MURPHY ###-#### CONTACTED BRIAN MARTIN 8-15-2008
Routing PW Sewer Design5/14/2008 5/14/2008 PASS
DetailsJon R. Gunnerson
Connect to sewer service provided.
Routing - PLANNING Land Div5/13/2008 5/14/2008 PASS
DetailsJoan Johnson
Plans ACCEPTED BY PLAN TECH  5/13/2008  
DetailsMarsha Smylie
Plan routing begun/NEW & ADDTN  5/13/2008  
DetailsJoan Johnson
Pending Assignment by MYS5/12/2008 5/13/2008 DONE
DetailsJohn Menard
5/13/2008 13:17:34 JCM - activity updated through activity BLDA166 from case BLD08-01011.
Application received 5/12/20085/12/2008 DONE
DetailsMarsha Smylie
Recd Pcfee & Taken To Pln CK  5/12/2008  
DetailsMarsha Smylie
Additional plans submitted     
DetailsBarbara Stitt
Received 1 cover transmittal and 1 copy of the following sheets C1.0, C2.0, C3.0, C4.0, C6.0 called McKeegan Architects and informed them that I need 3 more sets for Brian Murphy's troops///8-20-008 @ 11:15am BAS
Additional plans submitted     
DetailsJohn Menard
Received 1 cover transmittal and 3 more copies of sheets C1.0, C2.0, C3.0, C4.0, C6.0 and put on John Menard's desk 8-22-08 @ 1:25pm BAS