Third Notice | | 9/26/2009 | 9/18/2009 | | DONE |
|
|
|
|
Third Notice | | 9/1/2009 | 9/16/2009 | | DONE |
|
|
|
|
Telephone call | | | 9/16/2009 | | DONE |
Tisha Gallop
|
|
|
called and spoke with Mick from Ram Homes. I got new fax # and he said will work on getting final values back to me within the next couple of weeks.
|
Second Notice | | 8/5/2009 | 9/1/2009 | | DONE |
|
|
|
mailed
|
First Notice | | 4/29/2009 | 8/5/2009 | | DONE |
Tisha Gallop
|
|
|
mailed
|
Permanent Occupancy UNPAID FEE | | | 4/29/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Dave Hannah
|
|
|
Mik Phone #: ###-#### ok for perm occ
|
BLD-Final | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | NR |
Mike Jordan
|
|
|
Mick ###-####. Neesd fire/ life safety final to pass.
|
FIRE-Final Inspection | 4/21/2009 | 4/21/2009 | 4/21/2009 | P | FAIL |
Troy Cobbley
|
|
|
Provide the street address on both sides of the building as discussed, provide and mount the fire extinguisher as discussed, provide the occupant load sign (49) as discussed and provide modifications as discussed for the hvac system for proper placement of the duct smoke detector with a remote annunciator or provide verification that the hvac unit in question does not exceed 2,000cfm.
|
BLD-Other | 4/20/2009 | 4/20/2009 | 4/20/2009 | P | PASS |
Mike Jordan
|
|
|
Mic- ceiling Phone #: ###-####. Ceiling grid ok. Architect has provided additional details for 2hr. wall as noted in c/n. All work on 2hr. wall is complete.
|
BLD-Other | 4/6/2009 | 4/7/2009 | 4/7/2009 | P | NR |
Mike Jordan
|
|
|
Nick- ceiling Phone #: ###-####. Needs ri insp. first.
|
BLD-Conference | 4/2/2009 | 4/2/2009 | 4/2/2009 | P | PASS |
Mike Jordan
|
|
|
Mic Phone #: ###-####. Contractor had questions on ceiling grid installation requirements.
|
BLD-Conference | 12/17/2008 | 12/17/2008 | 12/17/2008 | P | DONE |
Mike Jordan
|
|
|
mick - please call 1/2 hr prior Phone #: ###-####
|
BLD-Framing/Rough-in | 8/25/2008 | 8/26/2008 | 8/26/2008 | A | PART |
Mike Jordan
|
|
|
mick Phone #: ###-####. 1st. layer of 5/8 type x for 2hr fire barrier wall,
|
BLD-Framing/Rough-in | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PART |
Mike Jordan
|
|
|
mick - please call 1/2 hr prior so he can meet you there Phone #: ###-####. ok to cover 2nd side of 2hr. fire barrier wall.
|
BLD-Conference | 8/19/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Mike Jordan
|
|
|
Noted inactivity on job site. Called contractor to check on job status. Contractor noted that job was on hold temporarily, but should start back up in the next day or two.
|
BLD-Framing/Rough-in | 7/17/2008 | 7/18/2008 | 7/18/2008 | A | PART |
Mike Jordan
|
|
|
nick Phone #: ###-####. Provided UL appears to be incorrect for installation. Architect to provide details for membrane and thru penetrations for 2hr fire barrier wall.
|
BLD-Framing/Rough-in | 7/11/2008 | 7/11/2008 | 7/11/2008 | P | PART |
Mike Jordan
|
|
|
Ryan Phone #: ###-####. Neds to provide UL for 2hr fire barrier wall and provide UL datta for membrane and thru penetrations. Provide ceiling details from architect. Remove wood penetrations from 2hr. wall and repair. c/n posted. ok to cover except for 2hr. wall. no grid.
|
Print Occupancy Form | | | 6/20/2008 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/20/2008 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 5/19/2008 | | 6/19/2008 | | PASS |
Tim L. Woodard
|
|
|
6/19/2008 09:16:45 TLW - activity updated through activity BLDA022 from case BLD08-01015.
|
Routing - PLAN CHECK | 6/13/2008 | | 6/19/2008 | | PASS |
Tim L. Woodard
|
|
|
Architect faxed the requested cut sheets and a memorandum. These documents were attached to this case and the plans.
|
Plan resubmittals received | | | 6/19/2008 | | DONE |
Tim L. Woodard
|
|
|
Cut sheet for cooler walls and a memorandum were submitted and attached to this case as well as the plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/19/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/19/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2008 | | DONE |
|
|
|
t/c w kevin at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/19/2008 | | DONE |
|
|
|
|
Routing - FIRE | 6/12/2008 | | 6/13/2008 | | PASS |
Kenneth R Roule
|
|
|
See fire plan review.
|
1st review completed | | | 6/13/2008 | | FAIL |
|
|
|
Failed plan check
|
Routing - PLAN CHECK | 5/21/2008 | | 6/12/2008 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report.
|
Routing - PLUMBING | | | 5/21/2008 | | PASS |
Bill VanDegrift
|
|
|
hand sinks in the kitchen and public lavs require a tempering valve set at 120 degrees max. United Water requires an R.P. upstream of water filter systems.
|
Routing - PUBLIC WORKS | 5/15/2008 | | 5/19/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 5/15/2008 | | 5/16/2008 | | PASS |
Walt Baumgartner
|
|
|
West Boise Sewer Dist OK shell and core plans 9/2007 showed 2 GIs for restaurant spaces. Port a Sub plumb plans show kitch drains to one GI.
|
Routing PW Sewer Rating | 5/15/2008 | | 5/15/2008 | | PASS |
Louise Waldorf
|
|
|
|
Pending Assignment by MYS | 5/12/2008 | | 5/15/2008 | | DONE |
Marlene Southard
|
|
|
5/15/2008 09:32:51 MYS - activity updated through activity BLDA185 from case BLD08-01015.
|
Recd Pcfee & Taken To Pln CK | | | 5/12/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/12/2008 | | DONE |
|
|
|
the electrical com check is on 8 1/2 x 11 did not see any for mec
|
Application received | | 5/12/2008 | | | |
|
|
|
|