Case Summary (BLD) | | | 4/9/2015 | | DONE |
|
|
|
|
Third Notice BLD | 3/3/2009 | 3/3/2009 | 3/11/2009 | | DONE |
Jim Toombs
|
|
|
This permit finaled on the web by Michele Rogers
|
Second Notice BLD | 1/29/2009 | 1/29/2009 | 3/3/2009 | | DONE |
Jim Toombs
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/8/2009 | 1/29/2009 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/7/2009 | 1/8/2009 | 1/8/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 1/8/2009 | 1/8/2009 | 1/8/2009 | P | PASS |
Jim Sly
|
|
|
30 min lead and I can meet you out there if you like. We got fire final today and everything else is signed off. Phone #: ###-#### Internet Inspection Request from: Nick Downing OK for Perm Occ.
|
Permanent Occupancy | | | 1/8/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 12/24/2008 | 12/24/2008 | 12/24/2008 | P | NR |
Jim Sly
|
|
|
Need fire Final......
|
FIRE-Final Inspection | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | CANC |
Troy Cobbley
|
|
|
Request for Life and Saftey- please allow 30 min lead time as I will be working at my office. Thank You.... Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Final | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | PART |
Jim Sly
|
|
|
I received health insp and I am ready final on the Chippery kiosk Phone #: ###-#### Internet Inspection Request from: Nick Downing Fire/life and CDHD has signed off on the Chippery......OK to Occupy.
|
BLD-Final | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | NR |
Jim Sly
|
|
|
chippery kiosk final.... Phone #: ###-#### Internet Inspection Request from: Nick Downing Need CDHD
|
FIRE-Final Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Troy Cobbley
|
|
|
The chippery lie safety items are passed. No other items have been inspected.
|
FIRE-Alarm Testing | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | DONE |
Troy Cobbley
|
|
|
The alarm test for the chippery passed. See the associated FIR permit for details with todays date.
|
BLD-Other | 9/24/2008 | 9/25/2008 | 9/25/2008 | A | PASS |
Jim Sly
|
|
|
grid inspection in the Ex pharmacy area. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
FIRE-Alarm Testing | 9/23/2008 | 9/25/2008 | 9/25/2008 | A | FAIL |
Troy Cobbley
|
|
|
Ansul and fire alarm test on the chippery kiosk was failed due to a module no being installed yet. Per the contractor the module will be installed tonight and the inspection called back in for tomorrow.
|
BLD-Other | 9/2/2008 | 9/2/2008 | 9/2/2008 | A | PASS |
Jim Sly
|
|
|
Grid inspection final in the Rx. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Other | 8/21/2008 | 8/22/2008 | 8/22/2008 | A | PASS |
Jim Sly
|
|
|
Rx grid inspection... Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Framing/Rough-in | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PASS |
Jim Sly
|
|
|
framing inspection in the new RX, on suspended walls and soffit eyebrow. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Framing/Rough-in | 8/7/2008 | 8/7/2008 | 8/7/2008 | P | PART |
Mike Jordan
|
|
|
framing inspection of floral kiosk walls, non load bearing. Phone #: ###-#### Internet Inspection Request from: Nick Downing. Interior non framed walss for floral kiosk. pend. plumbing and elec. ri insp.
|
BLD-Other | 7/18/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Jim Sly
|
|
|
Grid and lighting inspection at the Cash handeling room. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Wall cover | 7/18/2008 | 7/18/2008 | 7/18/2008 | P | PART |
Mike Jordan
|
|
|
facing the deli Department (S. side of store) the wall at the right has been relocated 10'''' into the deli. please approve for cover. Thanks Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Framing/Rough-in | 7/18/2008 | 7/18/2008 | 7/18/2008 | P | PART |
Mike Jordan
|
|
|
Inside the front of the store behind the lobby cabinets is the (N) framing for the relocated cash handeling room. requesting approval to cover. App Plans will be on the cabs adjacent to (N) framing. Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Other | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Jim Sly
|
|
|
(N) condenser roof curb inspection, these will be ready late afternoon. Karl is the on site installer ###-#### Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
BLD-Other | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | PASS |
Jim Sly
|
|
|
(N) condenser roof curb inspection, these will be ready late afternoon. Karl is the on site installer ###-#### Phone #: ###-#### Internet Inspection Request from: Nick Downing
|
Print Occupancy Form | | | 6/19/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Permit Ready to Issue | | | 6/19/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Telephone call | | | 6/19/2008 | | |
Alexandra L. DeYoung
|
|
|
called Kent at ###-####, fees given, permit ready
|
Issue PAID IN FULL permit | | | 6/19/2008 | | DONE |
|
|
|
|
Routing - FIRE | 6/17/2008 | | 6/18/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 6/18/2008 | | PASS |
Scott Arellano
|
|
|
|
Routing - PLAN CHECK | 6/18/2008 | | 6/18/2008 | | PASS |
Dan Stuart
|
|
|
Approved with attached plan review comments of all reviewing agencies.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2008 | | PASS |
Dan Stuart
|
|
|
|
Plan assigned to (DRS) | 5/20/2008 | | 6/18/2008 | | PASS |
Dan Stuart
|
|
|
6/18/2008 15:13:54 DRS - activity updated through activity BLDA022 from case BLD08-01056.
|
Routing - PLAN CHECK | 6/3/2008 | | 6/17/2008 | | PEND |
Dan Stuart
|
|
|
Architect to provide accessibility details for restrooms while plans route to fire code analyst. E-mailed copy of plan review to the architect.
|
Routing - PLANNING | | | 6/4/2008 | | PASS |
Matthew A Halitsky
|
|
|
Approval for repaint only.
|
Routing - PLUMBING | 5/23/2008 | | 5/29/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 5/20/2008 | | 5/23/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 5/22/2008 | | 5/23/2008 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved with attached conditions. ESC08-00439. Need RP
|
Routing PW Environmental | 5/23/2008 | | 5/23/2008 | | PASS |
Beverly Hall
|
|
|
Per Terry Alber, plumbing looks good in remodel.
|
Pending Assignment by MYS | 5/16/2008 | | 5/20/2008 | | DONE |
Marlene Southard
|
|
|
5/20/2008 08:47:14 MYS - activity updated through activity BLDA168 from case BLD08-01056.
|
Recd Pcfee & Taken To Pln CK | | | 5/16/2008 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/16/2008 | | DONE |
Barbara Stitt
|
|
|
Central District Health Signature on last page outside
|
Application received | | 5/16/2008 | | | |
|
|
|
|