Permit Information
Permit NumberBLD08-01057
StatusFinaled
Name BOISE PAVING
Site Address 610 S VISTA AVE
Project NameTorch 2
Customer Number 
ePlanReviewNo
Description
Parking lot-***Grading Permit***to grub, clean, excavate, grade, import and compact site earth materials in preparation for a PARKING LOT. For reconstruction of existing parking lot and construction of a new storm drainage system and supplemental irrigation system. To install curb, gutter and paving in accordance with the grading and drainage plans (zoning not required for existing). No construction is allowed under this permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/1/200912/1/200912/1/2009 PASS
DetailsJim Storey
DOC - Permit Finaled12/1/200912/1/200912/1/2009PPASS
DetailsJim Storey
BLD-Aging Inspection9/23/20099/23/20099/24/2009 PEND
DetailsJim Storey
left word to have pw requisted for final insp.
BLD-Aging Inspection7/15/20097/15/20097/15/2009 DEFR
DetailsJim Storey
pw need signed off
BLD-Aging Inspection5/15/20095/15/20095/15/2009 FAIL
DetailsJim Storey
pw need signed off
BLD-Aging Inspection2/26/20092/26/20093/2/2009 DEFR
DetailsJim Storey
pending pw verifcation of insp.
BLD-Aging Inspection9/11/20089/11/20089/11/2008 NR
DetailsJim Storey
pending others sign off.
Case Summary (BLD)  8/1/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/12/2008 DONE
DetailsBarbara Stitt
Override - Parcel Holds  6/12/2008  
Permit Ready to Issue  6/12/2008 DONE
DetailsBarbara Stitt
Telephone call  6/12/2008 DONE
DetailsBarbara Stitt
Called Nayloe with Boise Paving to informpermit is ready & fees due///6-12-08 @ 9:15am BAS
Telephone call  6/12/2008 DONE
DetailsBarbara Stitt
Called Ryan Carnie to inform that permit is ready & fees due 6-12-08 @ 9:17am BAS
Issue PAID IN FULL permit  6/12/2008 DONE
Routing - PLAN CHECK6/11/2008 6/12/2008 PASS
DetailsBarbara Stitt
Barbara Stitt
Routing - PUBLIC WORKS6/11/2008 6/11/2008 PASS
DetailsBeverly Hall
Routing PW Drainage6/9/2008 6/11/2008 PASS
DetailsBrian Murphy
Plan resubmittals received  6/9/2008  
DetailsTisha Gallop
Received two copies of drainage calcs and five copies of sheet C1.01; inserted into plans by LEG and taken back to Brian Murphy
Routing - FIRE6/5/2008 6/6/2008 PASS
DetailsScott Arellano
No fire comments attached.
1st review completed  6/6/2008 FAIL
Failed PW
Routing - PLANNING6/2/2008 6/3/2008 PASS
DetailsSarah Schafer
DRH08-00151-Sarah Schafer Approved per the listed DR.
Routing - PLUMBING5/27/2008 6/2/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Plan resubmittals received  5/30/2008  
DetailsTisha Gallop
Received one Geotech. Report, two copies of O & M Manual, two copies of Drainage Calcs., five copies of sheet C1.01; inserted into plans by LEG and taken back to plumbing review//5/30/08 LEG
Routing - PUBLIC WORKS5/27/2008 5/27/2008 FAIL
DetailsBeverly Hall
See Drainage notes
Routing - Erosion and Sediment5/27/2008 5/27/2008 PASS
DetailsSteven Webb
ESC plan approved with attached conditions. ESC08-00440
Routing - PUBLIC WORKS GRADING5/20/2008 5/22/2008 FAIL
DetailsBrian Murphy
GREATER THAN 20 PERCENT DRAIN ROCK. NEED GEOTECH REPORT. MORE INFO ON O AND M LOOKS MORE LIKE SURFACE SEEPAGE BED. BRIAN MURPHY ###-####
Plan resubmittals received  5/21/2008  
received "3" pages of "specialty const supply" --took paperwork to Brian Murphy to insert in plans for Steve Webb.
Routing - PLANNING Land Div5/16/2008 5/19/2008 PASS
DetailsJohn Johnson
Grading and drainage only
Application received 5/16/20085/16/2008 DONE
DetailsBarbara Stitt
Override - Parcel Holds  5/16/2008  
DetailsBethany Sullins
Submit plans for the stop work notice
Recd Pcfee & Taken To Pln CK  5/16/2008 DONE
DetailsBethany Sullins
Telephone call  5/16/2008 DONE
DetailsBethany Sullins
Phone call to Ryan Carnie fromm Brian Murphy that the complete Geo-tech report was not brought in with submital///5-16-08 @ 2:00pm BAS
Plans ACCEPTED BY PLAN TECH  5/16/2008 DONE
DetailsBethany Sullins
Phone call to Ryan Carnie (Lochsa Engineering) that Geo-tech report was not submitted with plans-Brian Murphy made the phone call///5-16-08 @ 2:00pm BAS