Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
Third Notice BLD | 12/22/2008 | 12/22/2008 | 3/12/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/7/2008 | 11/7/2008 | 12/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/7/2008 | 11/7/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 10/7/2008 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory pending the additon of one missing exit sign as shown on approved plans at the north side of the short hall and open office intersection.
|
BLD-Final | 10/2/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
Dave Hannah
|
|
|
Mike Phone #: ###-#### ok for perm occ
|
BLD-Other | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Mike Jordan
|
|
|
mike Note: modular wall installulation Phone #: ###-####. Spoke with mike on modular wall system. Insulation is installed. Still need to verify the connection to roof or beams above grid and supply data or insul for class A rating. ok to cover.
|
BLD-Aging Inspection | 9/4/2008 | 9/4/2008 | 9/8/2008 | | PART |
Dave Hannah
|
|
|
wip
|
Issue PAID IN FULL permit | | | 6/5/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/3/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/3/2008 | | DONE |
|
|
|
left message w marva for gary christensen at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/3/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/2/2008 | | DONE |
|
|
|
|
1st review completed | | | 5/30/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 5/30/2008 | | 5/30/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 5/30/2008 | | 5/30/2008 | | PASS |
Connie Baumgartner
|
|
|
|
Plan assigned to (425) | 5/20/2008 | 5/20/2008 | 5/29/2008 | | PASS |
Dave Hannah
|
|
|
5/29/2008 14:42:17 425 - activity updated through activity BLDA022 from case BLD08-01083.
|
Case Summary (BLD) | | | 5/29/2008 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 5/29/2008 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/29/2008 | | 5/29/2008 | | PASS |
Dave Hannah
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2008 | | DONE |
|
|
|
|
Application received | | 5/20/2008 | 5/20/2008 | | DONE |
Bethany Sullins
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/20/2008 | | DONE |
Dave Hannah
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/20/2008 | | DONE |
Bethany Sullins
|
|
|
|