Permit Information
Permit NumberBLD08-01101
StatusFinaled
Name JORDAN-WILCOMB CONSTRUCTION
Site Address 600 N ROBBINS RD
Project NameIDAHO ELKS REHAB
Customer Number 
ePlanReviewNo
Description
(IDAHO ELKS REHABILITATION HOSPITAL) To construct a new 9' x 20' entry vestibule enclosure under existing roofline and perform wall interior upgrades with new arrangement to treatment, exam room areas, modify portions of suspended ceiling grid & modify reception desk area, all on the 1st floor of existing hospital per approved plans and CZC08-00076.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/11/2014 DONE
Case Summary (BLD)  3/11/2014 DONE
BLD-Final12/22/200812/22/200812/22/2008PPASS
DetailsDave Hannah
john Phone #: ###-####
Letter of compliance  12/22/2008 DONE
DOC - Permit Finaled  12/22/2008 DONE
DetailsDarla L Downs
Letter of compliance issued
FIRE-Final Inspection12/19/200812/19/200812/19/2008PPASS
DetailsForrest France
Fire life safety final inspection completed satisfactory.
BLD-Framing/Rough-in12/16/200812/17/200812/17/2008PPART
DetailsDave Hannah
john - ceiling Phone #: ###-#### ok to cover ceiling in last section
BLD-Framing/Rough-in12/5/200812/5/200812/8/2008PPART
DetailsDave Hannah
john Phone #: ###-#### ok to cover entry
FIRE-Final Inspection12/1/200812/1/200812/1/2008PPART
DetailsForrest France
John Pnone#: ###-####
BLD-Framing/Rough-in11/25/200811/26/200811/26/2008APART
DetailsJim Sly
john Phone #: ###-####
Frame OK at Phase 3.......Wound and healing area.
BLD-Framing/Rough-in11/17/200811/18/200811/18/2008APART
DetailsDave Hannah
john Phone #: ###-#### ok to cover ceiling in entryway
FIRE-Final Inspection11/14/200811/17/200811/17/2008PPART
DetailsForrest France
Fire life safety okayed for remodel areas completed to date.
BLD-Final11/14/200811/14/200811/14/2008PCANC
DetailsDave Hannah
John this is for a temp only Phone #: ###-####ok to move into pn2
FIRE-Final Inspection11/13/200811/14/200811/14/2008ANR
DetailsForrest France
Inspection for one portion of the remodel area work completed including the reception/waiting rooms, hall 118, cast rm., lymph. room, and some exam rooms. Need project related fire sprinkler work repairs, need to add an additional PFE for the east side as discussed, some missing door hardware.
BLD-Framing/Rough-in11/12/200811/12/200811/12/2008PCANC
DetailsDave Hannah
john - ceiling Phone #: ###-#### pn 2 wound and healing section ok to cover ceiling
BLD-Framing/Rough-in10/29/200810/30/200810/31/2008PPART
DetailsDave Hannah
john Phone #: ###-####
FIRE-Final Inspection10/22/200810/22/200810/23/2008PPART
DetailsForrest France
Partial for work completed to date.
BLD-Framing/Rough-in10/15/200810/16/200810/16/2008APART
DetailsDave Hannah
kevin Phone #: ###-#### wound clinck ph 1 ok to cover walls
BLD-Final9/19/20089/22/20089/22/2008ANR
DetailsDave Hannah
Kevin Phone #: ###-####
FIRE-Final Inspection9/19/20089/19/20089/19/2008PFAIL
DetailsForrest France
Cannot perform a life safety until fire sprinkler resubmittals have been approved due to the use of sprinkler flex heads that were not shown on sprinkler plans. KR
BLD-Framing/Rough-in9/16/20089/17/20089/17/2008APART
DetailsDave Hannah
Kevin- ceiling Phone #: ###-#### ok to cover ceilings in section a part 1
BLD-Framing/Rough-in8/29/20088/29/20088/29/2008PPART
DetailsDave Hannah
Kevin Phone #: ###-#### wrilpool room ok to cover
BLD-Framing/Rough-in8/15/20088/18/20088/18/2008APART
DetailsDave Hannah
Kevin Phone #: ###-#### ok to cover walls in section A or phase 1
BLD-Framing/Rough-in8/11/20088/11/20088/11/2008PPART
DetailsDave Hannah
kevin Phone #: ###-#### talked to super about how to do phased projects
Issue PAID IN FULL permit  7/18/2008 DONE
Plan assigned to (DRS)5/23/2008 7/17/2008 PASS
DetailsDan Stuart
7/17/2008 08:34:55 DRS - activity updated through activity BLDA022 from case BLD08-01101.
Routing - PLAN CHECK6/24/2008 7/17/2008 PASS
DetailsDan Stuart
Resubmittals inserted into plans. Plan review modified and plans-redlined. To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  7/17/2008 PASS
Inspection Record Card- Bld  7/17/2008 DONE
Details
Telephone call  7/17/2008 DONE
Details
t/c w bryan gilbreath at ###-#### - permit ready and fees given
Permit Ready to Issue  7/17/2008 DONE
Details
Plan resubmittals received  7/16/2008 DONE
received 1 letter of transmittal,1 review comments,3 ratings for fire rated doors ,and 3 copies of sheets G0.1,A0.1,A2.1,A4.1,A5.1,A7.1,M2.1,E2.1F,E2.1L,E2.1P,E2.15,E3.0 taken to Dan S.
Route to Impact Fee Review6/23/20086/26/20086/24/2008 PASS
DetailsCindy M. Gould
Routing - FIRE6/23/20086/23/20086/24/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  6/24/2008 FAIL
Failed Plan Check
Routing - PLAN CHECK6/3/2008 6/23/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to Steve Turney, ZGA. Routing plans to fire code analyst.
Plan resubmittals requested  6/23/2008 DONE
E-mailed plan review to architect.
Routing - PLANNING6/2/2008 6/3/2008 PASS
DetailsAndrea Tuning
Routing - PLUMBING5/27/2008 6/2/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS5/23/2008 5/27/2008 PASS
DetailsBeverly Hall
Routing - Erosion and Sediment5/27/2008 5/27/2008 PASS
DetailsSteven Webb
ESC plan waiver approved with attached conditions. ESC08-00455
Pending Assignment by MYS5/22/2008 5/22/2008 DONE
DetailsTisha Gallop
5/22/2008 14:28:59 LEG - activity updated through activity BLDA175 from case BLD08-01111.
Plans ACCEPTED BY PLAN TECH  5/22/2008  
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  5/22/2008 DONE
DetailsTisha Gallop
Application received 5/21/2008   
DetailsTisha Gallop